Copy · Airbus EASB 05A017 Rev 2 · 12 pages

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2015-3970; AD 2016-08-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextOCR

This text is OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '2074bb35db91ba33b6026d76b0e2d6d94418985901aa9eac5b35588f46245744'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS

HELICOPTERS EASB

EMERGENCY

ALERT SERVICE BULLETIN SUBJECT: FUSELAGE Check of the tail boom / Fenestron junction frame ATA: 53 For the attention of CONCERNED AIRCRAFT NUMBER Civil Version(s) Military EC130 05A017 B4, T2 Revision No. Date of issue Revision 0 2014-06-06 Revision 1 2014-06-13 Revision 2 2015-02-20 Summary:

Visual check for cracks on the tail boom / Fenestron junction frame.

Reason for last Revision:

The purpose of Revision 2 is:

- to propose the possibility of inspecting the tail boom / Fenestron junction frame from outside.

- to provide details in paragraph 1.G. "Manpower".

- to introduce an inspection periodicity expressed in sling cycles for helicopters which carry out external load carrying operations.

Compliance:

Compliance with this ALERT SERVICE BULLETIN is mandatory.

Revision 0 2014-06-06 Page 1/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 2OCROpen in PDF

AIRBUS

HELICOPTERS EASB

1. PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment On all EC130 B4 and T2 helicopters.

1.A.2. Non-installed equipment Not applicable.

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON Revision 0:

On the EC130 B4 tail boom / Fenestron junction frame, two cases of cracks were found in a new area of the tail boom / Fenestron junction frame during non-scheduled inspections.

Examination revealed that the crack initiated in the radius between the web and the flange on the tail cone side, in the lower RH part of the tail boom / Fenestron junction frame (Detail A, Figure 1).

It spread rapidly, following the radius along the web of the tail boom / Fenestron junction frame.

The cracks are of considerable length and no deterioration is visible from outside the helicopter.

The inspection of this area which can reveal these cracks is scheduled at the "600 hours // 2 years" inspection.

Information Notice (IN) No. 2167-1-53 was issued on June 15, 2010 to specify the applicable maintenance.

Considering the cases encountered in service, this periodicity is unsuitable.

In these conditions and under high tail rotor thrust load, the resistance margins of this junction may be insufficient.

Consequently, Airbus Helicopters makes compliance with this ALERT SERVICE BULLETIN mandatory. Its purpose is to enable a detailed visual check from inside the tail boom.

Revision 1:

The purpose of Revision 1 is to refer to the flying hours logged by the tail boom / Fenestron junction frame instead of the flying hours logged by the helicopter, in paragraph 1.E.2.

Revision 2:

Compliance with the previous revisions of this ALERT SERVICE BULLETIN required an inspection from inside the tail boom, with or without removal of the stabilizer.

As this inspection from inside can be complex, the purpose of Revision 2 of this ALERT SERVICE BULLETIN is to propose an alternative inspection from outside the tail boom, which is possible following compliance with Service Bulletin No. 53-029, and to define who is allowed to perform the different checks.

Furthermore, a follow-up in sling cycles has been added for helicopters which carry out external load carrying operations.

Revision 0 2014-06-06 Page 2/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 3OCROpen in PDF

AIRBUS

HELICOPTERS EASB

1.D. DESCRIPTION Compliance with this ALERT SERVICE BULLETIN consists in checking that there are no cracks on the tail boom / Fenestron junction frame.

1.E. COMPLIANCE

1.E.1. Compliance at the works Not applicable.

1.E.2. Compliance in service Helicopters/installed equipment:

a) For helicopters on which SB No. 53-029 has not been complied with For helicopters equipped with a tail boom / Fenestron junction frame which has logged less than 690 flying hours:

Comply with paragraph 3.B.1. at the latest when reaching 700 flying hours.

Then, Comply with paragraph 3.B.1. or 3.B.2. at intervals not exceeding 25 flying hours or 390 sling cycles - Refer to the NOTE - (the first limit reached is applicable).

For helicopters equipped with a tail boom / Fenestron junction frame which has logged 690 or more flying hours:

Comply with paragraph 3.B.1. within 10 flying hours following receipt of Revision 1 of this ALERT SERVICE BULLETIN issued on June 13, 2014, unless compliance was ensured in accordance with Revision 0.

Then, Comply with paragraph 3.B.1. or 3.B.2. at intervals not exceeding 25 flying hours or 390 sling cycles - Refer to the NOTE - (the first limit reached is applicable).

b) For helicopters on which SB No. 53-029 has been complied with Comply with paragraph 3.B.3. at intervals not exceeding 10 flying hours or 250 sling cycles - Refer to the NOTE - (the first limit reached is applicable).

NOTE Cycles are counted as follows:

1 landing with or without stopping the rotor = 1 cycle 1 external load carrying operation = 1 cycle Non-installed equipment: Not applicable.

Revision 0 2014-06-06 Page 3/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 4OCROpen in PDF

AIRBUS

HELICOPTERS EASB

1.F. APPROVAL Approval of modifications:

Not applicable.

Approval of this document:

The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on June 06, 2014 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of civil versions subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on June 13, 2014 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of civil versions subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 2 was approved on February 20, 2015 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of civil versions subject to an Airworthiness Certificate.

Revision 0 2014-06-06 Page 4/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 5OCROpen in PDF

AIRBUS

HELICOPTERS EASB

1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following personnel qualifications:

Qualification:

- 1 Technician to comply with paragraphs 3.B.1, 3.B.2, 3.B.3.(a) and (b).

Or,

- 1 Pilot to comply with paragraph 3.B.3. (a).

Or,

- 1 Person appropriately trained and certified, in accordance with the local regulations in force, to comply with paragraphs 3.B.2, 3.B.3.(a) and (b).

The time for the operations is given for information purposes, for a standard configuration.

Time for the operations: approximately 1 hour to comply with paragraph 3.B.1. (with removal of the stabilizer) approximately 30 minutes to comply with paragraph 3.B.2. (without removal of the stabilizer) approximately 10 minutes to comply with paragraph 3.B.3.

1.H. WEIGHT AND BALANCE Not applicable.

1.I. EFFECT ON ELECTRICAL LOADS Not applicable.

1.J. SOFTWARE MODIFICATION EMBODIMENT RECORD Not applicable.

1.K. REFERENCES Aircraft Maintenance Manual (AMM):

AMM: 55-11-00,4-1: Removal/Installation - Horizontal stabilizer Standard Practices Manual (MTC):

- MTC: 20.04.01.102: Use of cleaning products on individual parts and on aircraft

- MTC: 20.02.09.101: Crack detection through dye-penetrant inspection: General

- MTC: 20.02.09.601: Checking structural parts/components using the dye-penetrant procedure

1.L. DOCUMENTS AFFECTED Not applicable.

1.M. INTERCHANGEABILITY OR MIXABILITY OF PARTS Not applicable.

Revision 0 2014-06-06 Page 5/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 6OCROpen in PDF

AIRBUS

HELICOPTERS EASB

2. MATERIAL INFORMATION

2.A. MATERIAL: PRICE - AVAILABILITY - PROCUREMENT Not applicable.

2.B. INFORMATION CONCERNING INDUSTRIAL SUPPORT Not applicable.

2.C. MATERIAL REQUIRED FOR EACH HELICOPTER/COMPONENT Products to be ordered separately:

As per the Tasks specified in this ALERT SERVICE BULLETIN:

The products can be ordered separately from the INTERTURBINE AVIATION LOGISTICS company.

Website: http://www.interturbine.com Telephone: +49.41.91.809.300 AOG: +49.41.91.809.444

2.D. MATERIAL TO BE RETURNED Not applicable.

Revision 0 2014-06-06 Page 6/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 7OCROpen in PDF

AIRBUS

HELICOPTERS EASB

3. ACCOMPLISHMENT INSTRUCTIONS

3.А. GENERAL NOTE 1 Contact details of the Airbus Helicopters Customer Service Technical Support Department:

Tel.: +33 (0)4.42.85.97.89.

Fax: +33 (0)4.42.85.99.66.

E-mail: support.technical-airframe.ah@airbus.com

3.B. OPERATIONAL PROCEDURE

3.B.1. Inspection of the tail boom / Fenestron junction frame from inside the tail boom with removal of the stabilizer As per Figures 1 and 3:

- Remove the horizontal stabilizer as per AMM Task 55-11-00,4-1.

- If necessary, clean the area to be checked defined in figure 1 of the junction frame (a) (see detail A and cross-section B-B) as per MTC Work Card 20.04.01.102.

NOTE 2 For this inspection, the surface of the frame must be clean.

- Check that there are no cracks on the web of the frame (a) and in the radius between the web and the flange on the tail cone side. Pay particular attention to the area around the 4 spars (b). (See Detail C) . If in doubt, perform a local non-destructive inspection of the inspection area (e.g. dye-penetrant inspection as per MTC Work Cards 20.02.09.101 and 20.02.09.601).

Then interpret the results as per paragraph 3.B.4.

3.B.2. Inspection of the tail boom / Fenestron junction frame from inside the tail boom without removal of the stabilizer As per Figures 2 and 3:

NOTE 3 For this inspection, the surface of the frame must be clean.

- Using a borescope through the stabilizer opening, check that there are no cracks on the web of the frame

(a) and in the radius between the web and the flange on the tail cone side. Pay particular attention to the area around the 4 spars (b). (See Detail C) . If in doubt, perform a local non-destructive inspection of the inspection area (e.g. dye-penetrant inspection as per MTC Work Cards 20.02.09.101 and 20.02.09.601).

Then interpret the results as per paragraph 3.B.4.

Revision 0 2014-06-06 Page 7/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 8OCROpen in PDF

AIRBUS

HELICOPTERS EASB

3.B.3. Inspection of the tail boom / Fenestron junction frame from outside the tail boom NOTE 4 This inspection can only be performed following compliance with Service Bulletin No. 53-029.

As per Figure 4:

a) Check that there are no cracks on frame (a) in the area of the skin cut-outs (upper and lower RH side, upper and lower LH side) (See Detail A - Figure 4).

Only the RH side is shown in Figure 4. The LH side is identical.

b) If in doubt, perform a local non-destructive inspection of the inspection area (e.g. dye-penetrant inspection as per MTC Work Cards 20.02.09.101 and 20.02.09.601).

CAUTION

THIS CHECK MUST BE PERFORMED IN THE NON- PAINTED, CLEAN AREA.

Then interpret the results as per paragraph 3.B.4.

3.B.4. Interpretation of the results

a) If there are no cracks:

• Leave as is.

If previously removed, install the horizontal stabilizer as per AMM Task 55-11-00,4-1.

. Resume flights.

b) If any cracks are found:

Before resuming flights:

. Contact Airbus Helicopters to define the conditions for returning the helicopter to conformity (refer to NOTE 1).

3.C. IDENTIFICATION Identification of this document:

Record first compliance with this ALERT SERVICE BULLETIN in the helicopter documents.

3.D. OPERATING AND MAINTENANCE INSTRUCTIONS For helicopters on which SB No. 53-029 has been complied with:

Comply with paragraph 3.B.1. or 3.B.2. (inspection from inside the tail boom) every 660 flying hours (T inspection).

Revision 0 2014-06-06 Page 8/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 9OCROpen in PDF

AIRBUS

HELICOPTERS EASB Cross-section B-B Fenestron DETAIL A - View looking afte Tail boom

DETAIL C Figure 1 Check of the frame with removal of the stabilizer Revision 0 2014-06-06 Page 9/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 10OCROpen in PDF

AIRBUS

HELICOPTERS EASB Borescope insertion Cross-section B-B Fenestron b DETAIL A - View looking afte Tail boom

DETAIL C Figure 2 Check of the frame without removal of the stabilizer Revision 0 2014-06-06 Page 10/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 11OCROpen in PDF

AIRBUS

HELICOPTERS EASB Example of a crack Example of a crack Figure 3 Examples of cracks Revision 0 2014-06-06 Page 11/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub

Page 12OCROpen in PDF

AIRBUS

HELICOPTERS EASB Only the RH side is shown.

The LH side is identical to the RH side.

Cut-out following compliance with SB No. 53-029 Schematic representation of a crack with skin cut- OUT Figure 4 Check of the frame from outside Revision 0 2014-06-06 Page 12/12 Revision 2 2015-02-20 This document is available on the internet: www.airbushelicopters.com/techpub