On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Text · 18OCR
This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2009-0195; AD 2009-06-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '4cf957544ae1c2df6b6600e136b1f533faa634bbb16c464f4f5d4b98228230ba' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '4cf957544ae1c2df6b6600e136b1f533faa634bbb16c464f4f5d4b98228230ba' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
eurocopter an EADS Company T.F.S. No. 00000378
EUROCOPTER
DIRECTION TECHNIQUE SUPPORT 13725 MARIGNANE CEDEX FRANCE
EMERGENCY
ALERT SERVICE BULLETIN
DAUPHIN NUMBER VERSIONS EC155 25A085 Civil: B,B1 SUBJECT: EQUIPMENT AND FURNISHINGS Electrical Bonding of the Hoist Cut-Off Connector REVISION No.
_ DATE OF APPROVAL DATE OF ISSUE Revision O On: June 1$, 2007 2007.06.01 Approved under EASA DOA No. 21J.056 Page 1/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378
1. PLANNING INFORMATION
1.A. EFFECTIVITY
1.A.1. Helicopters / Installed Equipment Helicopters fitted with the optional equipment OP 45C07 (fixed parts of the hoist installation) whose Serial Number (S/N) is strictly less than 6763.
1.A.2. Non-Installed Equipment Not applicable.
1.B. ASSOCIATED REQUIREMENTS Not applicable.
1.C. REASON Preventing short-circuits in hoist cut-off connector "24 Delta".
This ALERT SERVICE BULLETIN will form the subject of an EASA Airworthiness Directive.
1.D. DESCRIPTION The occurrence of a short-circuit in hoist connector "24 Delta", with the hoist removed from the aircraft, has been reported to EUROCOPTER.
The short-circuit heated the paint on the cooler support cowling at hoist cut-off connector "24 Delta" and set it on fire.
As crews have no detection or display means for this short-circuit, EUROCOPTER renders compliance with this ALERT SERVICE BULLETIN mandatory This ALERT SERVICE BULLETIN requires the following procedures to be applied, according to the helicopter configuration:
- Orientating the fixed connector.
- Connecting or disconnecting the hoist power cable.
- Installing an electrical bonding braid.
1.E. COMPLIANCE EUROCOPTER renders compliance with this ALERT SERVICE BULLETIN mandatory.
1.E.1. Compliance at the Works
1.E.1.a. On Helicopters: Comply with paragraphs 2.B.2.a and 2.B.2.c before delivery.
1.E.1.b. On Non-Installed Equipment: Not applicable.
1.E.2. Compliance in Operation: By the operator.
Approved under EASA DOA No. 21J.056 Page 2/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378
1.E.2.a. On Helicopters / Installed Equipment Helicopters that do not embody MOD 0745C82:
No later later than within 7 days after receipt of this ALERT SERVICE BULLETIN, issued on the date specified in the page footer, comply with the following paragraphs:
- 2.B.2.a (Orientating the fixed connector).
- 2.B.2.b (Disconnecting the hoist power cable) if the hoist is not installed.
No later than within three months after receipt of this ALERT SERVICE BULLETIN, issued on the date specified in the page footer, comply with paragraph 2.B.2.c (Installing the electrical bonding braid).
Pending compliance with paragraph 2.B.2.c:
- Whenever the hoist is installed, connect the power cable in compliance with paragraph 2.B.2.b.
- Whenever the hoist is removed, disconnect the power cable in compliance with paragraph 2.B.2.b.
Helicopters that embody MOD 0745C82:
No later than within 7 days after receipt of this ALERT SERVICE BULLETIN, issued on the date specified in the page footer, comply with paragraph 2.B.2.a.
1.E.2.b. On Non-Installed Equipment Not applicable.
1.F. APPROVAL Approval is limited to civil version helicopters subject to an Airworthiness Certificate.
1.F.1 Approval of the Modifications The information or instructions refer to MOD 0745C82 which was approved on June 1st , 2007.
1.F.2 Approval of the Service Bulletin The technical information contained in this ALERT SERVICE BULLETIN was approved on June 1st •, 2007 under the authority of EASA Design Organisation Approval No. 21J.056.
1.G. MANPOWER Qualification: 1 mechanic.
Time for the operations: Approximately 1 hour and 30 minutes to install the electrical bonding braid.
1 hour and 30 minutes to disconnect the hoist power cable.
1.H. WEIGHT AND BALANCE Not applicable.
Approved under EASA DOA No. 21J.056 Page 3/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378
1.I. EFFECT ON ELECTRICAL LOADS Not applicable.
1.J. SOFTWARE MODIFICATION EMBODIMENT STATE Not applicable.
1.K. REFERENCES The following documents are necessary for compliance with this ALERT SERVICE BULLETIN:
AMM: 24-32-01-061: Removal/Installation of electrical master box 2 Alpha.
AMM: 24-61-01-061: Removal/Installation of the circuit-breaker panel.
AMM: 24-00-00-911: General safety instructions related to electrical power.
MTC: 20.02.07.402: Bonding points on metal structures.
MTC: 20.02.07.401: Bonding procedure.
MTC: 20.07.03.406: Instructions applicable when working on aircraft electrical power systems.
MTC: 20.02.05.404: Assembling by bolts and nuts.
MTC: 20.05.01.221: Sealing compound PR 1436 GS.
1.L. OTHER DOCUMENTS CONCERNED Not applicable.
1.M. TOOLING CONCERNED Not applicable.
1.N. INTERCHANGEABILITY OR MIXABILITY OF PARTS Not applicable.
Approved under EASA DOA No. 21J.056 Page 4/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378
2. ACCOMPLISHMENT INSTRUCTIONS
2.A. GENERAL
- Read and comply with the instructions for removal/installation of electrical master box "2 Alpha" as per AMM Task 24-32-01-061.
- Read and comply with the general safety instructions related to electrical power as per AMM Task 24-00-00-911.
- Read and comply with the instructions for removal/installation of the circuit-breaker panel as per AMM Task 24-61-01-061.
- Read and comply with the instructions related to electrical bonding of metal structures as per MTC Work Card 20.02.07.402
- Read and comply with the electrical bonding procedures as per MTC Work Card 20.02.07.401.
- Read and comply with instructions related to assembly by nuts and bolts as per MTC Work Card
- Read and comply with the instructions related to sealing compound application as per MTC Work Card
20.05.01.221.
2.B. OPERATIONAL PROCEDURE
2.B.1. Preliminary Steps
- Disconnect all electrical power sources as per MTC Work Card 20.07.03.406.
- Install the electrical power inhibit provisions on the helicopter.
- Set up appropriate access equipment.
- Open the RH engine cowling to gain access to hoist fixed power connector "24 Delta".
- Remove the oil cooler air inlet fairing to gain access to the screw of ground point "28N".
- Open the radome to gain access to electrical master box "2 Alpha".
2.B.2. Procedure
2.B.2.a. Orientating the Fixed Connector (Figure 1):
. If the large contacts of connector "24 Delta" are positioned aft (Figure 1, item W), leave as is.
. If the large contacts of connector "24 Delta" are not positioned aft, orientate connector "24 Delta" as shown on Figure 1 (item W).
2.B.2.b. Disconnecting/Connecting the Power Cable (Figures 2, 3, 4, and 5):
. Remove the circuit-breaker panel as per AMM Task 24-61-01-061 (Figure 2).
Remove cover (h) to gain access to the fuse terminal block as per AMM Task 24-32-01-061 (Figure 4).
• In electrical master box "2 Alpha", disconnect hoist power wire "2ME40E" at 130A-rated fuse (g) (Figures 3, 4, and 5).
. Insulate the hoist power wire.
Immobilize the hoist power wire.
. Retorque the fuse holder, with the fuse in place, as per AMM Task 24-32-01-061.
. Install cover (h) as per AMM Task 24-32-01-061.
. Install the circuit-breaker panel as per AMM Task 24-61-01-061.
To connect the hoist power cable, proceed in the reverse order.
Approved under EASA DOA No. 21J.056 Page 5/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378
2.B.2.c. Installing the Electrical Bonding Braid (Figures 6, 7, 8, and 9)
- Remove screw (a), nut (b), and washer (c) (Figure 6).
- Discard screw (a), and retain nut (b) and washer (c).
- Ensure electrical bonding as per MTC Work Cards 20.02.07.401 and 20.02.07.402.
- Install braid (4) (Figure 7) using screw (1), nut (b), and washer (c).
On ground point "28N" (Figures 8 and 9) at the 9° frame, on aircraft RH side.
- Remove the sealing compound
- Remove screw (d), nut (e), and washer (f).
- Discard screw (d) and retain nut (e) and washer (f).
- Ensure electrical bonding as per MTC Work Cards 20.02.07.401 and 20.02.07.402.
- Install braid (4) on electrical bonding point "28N" using screw (2), washer (3), braid (y), washer (f), and
- Torque as per MTC Work Card 20.02.05.404 (Figures 8 and 9).
- Apply sealing compound (5).
2.B.3. Final Steps
- Close the radome.
- Install the oil cooler air inlet fairing.
- Close the engine cowling.
- Remove the access equipment.
- Remove the electrical power inhibit provisions from the helicopter.
- Reconnect all the electrical power sources as per MTC Work Card 20.07.03.406.
2.C. IDENTIFICATION Record initial compliance with this ALERT SERVICE BULLETIN in the helicopter documents.
Record embodiment of MOD 0745C82 in the helicopter documents after complying with paragraph
2.B.2.c. (Installing the electrical bonding braid).
2.D. OPERATING AND MAINTENANCE INSTRUCTIONS Not applicable.
Approved under EASA DOA No. 21J. 056 Page 6/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378 FWD Figure1 Orientation of the Hoist Fixed Connector.
FWD FWD FWD Approved under EASA DOA No. 21J.056 Page 7/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378 2 Alpha Figure 2 Location of Electrical Master Box 2 Alpha g Figure 3 Location of the Power Connector Approved under EASA DOA No. 21J. 056 Page 8/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378 n Figure 4 Location of the Power Connector 685 ENG DECK 24DEL 281 F2PCO 2ME39NE DG 04 2ME 40E - DG 04 TAJ NOSE CEFECTRICAL MASTER BOX 2 SHEAT F0210DHS754-100 30 2ME 27F GND 2ME 29E PREAM INPUT 9 2ME 3 0E 2ME 3 1E M PREAM INPUT PREAM INPUT SEE 25.63.01.105 +28VDC DOWN UP 2ME 38 NE 1ME 20E 4M-J1 P1 CARGO TRANS DECK 685 ENG DECK 665 685 Figure 5 Wiring Diagram Approved under EASA DOA No. 21J.056 Page 9/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378 244 Figure 6 (Pre MOD 0745C82) Fixed Power Connector for the Hoist C 4 244 Figure 7 (Post MOD 0745C82) Fixed Power Connector for the Hoist Approved under EASA DOA No. 21J.056 Page 10/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378 244 N8Z FIgure 8 Pre MOD 0745C82 -lectrical Bonding Poin 28N 2 Figure 9 (Post MOD 0745C82) Electrical Bonding Point Approved under EASA DOA No. 21J.056 Page 11/13 2007.06.01
eurocopter an EADS Company T.F.S. No. 00000378
3. MATERIAL INFORMATION
3.A. MATERIAL: COST - AVAILABILITY
3.A.1. Cost Kits and/or components will be delivered free of charge on Operator's order within 3 months following receipt of this ALERT SERVICE BULLETIN, issued on the date specified in the page footer.
3.A.2. Availability Kits and/or components will be delivered on Operator's order.
3.B. INFORMATION CONCERNING INDUSTRIAL SUPPORT Not applicable.
3.C. MATERIAL REQUIRED FOR EACH HELICOPTER / ENGINE / COMPONENT
3.C.1. Kit(s) or Component(s) to be Ordered for One Helicopter or One Assembly Material Part Number Qty Ite Key Word Former Part Number Instructions m 365A08-3275-0071 1 Kit including:
22272BC040014L 1 1 Screw 22208BC060016L 2 Screw 23116AG040LE Washer 993105-304-6 4 Electrical bonding braid
3.C.2. Items) to be Ordered Separately Not applicable.
3.C.3. Products) to be Ordered Separately Material Part Number Qty. Item Key Word PR1436GS A/R 5 PR1436GS The products identified by an asterisk "*" or required for compliance with the tasks and/or work cards listed in paragraph 1.K. can be ordered from the company INTERTURBINE Website: http://www.itlogistics.de Telephone: +49.41.91.809.300 AOG : +49.41.91.809.444 Approved under EASA DOA No. 21J.056 Page 12/13 2007.06.01