On this page
ADs that cite it · 2
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD and 1 difficulty report.
Text · 13OCR
This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-0572; AD 2020-26-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd86e1b78a97d3c678e7476ab4b7d914cead6e6e34f4f790c1840cc01f5ae28ff' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd86e1b78a97d3c678e7476ab4b7d914cead6e6e34f4f790c1840cc01f5ae28ff' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
AIRBUS HELICOPTERS ASB EC135-67A-017 Valid for Version(s): T1, T2, T2+, P1, P2, P2+ 635 T1, 635 12+, 635 P2+
ALERT SERVICE BULLETIN SUBJECT: ROTOR FLIGHT CONTROL - Tail Rotor Controls Inspection of control rod and ball pivot For the attention of Revision No. Date of issue Revision 0 2007-12-13 Revision 1 2007-12-21 Revision 2 2008-03-17 Revision 3 2010-07-26 Revision 4 2017-04-03 Summary:
Reason for the first issue (Revision 0) of this Alert Service Bulletin (ASB) was an incident in which the tail rotor controls have failed.
Reason for last Revision:
Please replace Revision 3 of this ASB with Revision 4.
The repetitive inspection of this ASB has already been incorporated into the AMM/MSM EC135/EC635. Therefore this inspection was deleted with Revision 4 of this ASB. This ASB does not feature revision bars as the entire document has been revised.
If Revision 3 of this ASB has already been accomplished, no further work is necessary due to this Revision.
Compliance:
Compliance with Revision 3 of this ASB is mandatory.
Revision 4, 2017-04-03 PAGE 1 of 4 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB EC135-67A-017
PLANNING INFORMATION
1.A EFFECTIVITY
1.A.1 Helicopters/installed equipment and parts
a) EC135, 11, 12, 12+, P1, P2, P2+, 635 11, 635 12+, 635 P2+, up to and including S/N 0505, excluding S/N 0028.
b) Components affected: Control rod P/N L672M2005207 Ball pivot P/N 92-201-00 or P/N 92-207-00
1.A.2 Non-installed equipment and parts See section 1.A.1 part b.
1.B ASSOCIATED REQUIREMENTS None.
1.C REASON Reason for the first issue of this ASB was an incident in which the tail rotor controls have failed. To adress this unsafe condition, one-time inspections were introduced with the first issue.
- With Revision 1, the compliance time has changed and a repetitive inspections every 50 Fh were introduced.
- With Revision 2, the intervals for the repetitive inspections were changed and the inspections had been revised. Furthermore the repetitive inspection were different for ball pivot P/N 92-201-00 and P/N 92-207-00. The compliance time for the one-time inspection of ball pivot P/N 92-207-00 ended on May 31, 2008.
- With Revision 3, the exchange of the control rod was introduced. The compliance time for Revision 3 of this ASB ended on August 31, 2011. The repetitive inspections (see Sections 1.E. (2) of ASB EC135-67A-017 Revision 3 - attached to this ASB) are already incorporated in the AMM/MSM.
1.D DESCRIPTION ASB Revision 4 requires no additional work.
PAGE 2 of 4 Revision 4, 2017-04-03 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB EC135-67A-017
1.E COMPLIANCE
1.E.1 Compliance at H/C manufacturer level Helicopters/installed equipment and parts:
Not affected.
Non-installed equipment and parts:
Not affected.
1.E.2 Compliance in service Helicopters/installed equipment and parts:
a) If Revision 3 of this ASB has already been accomplished, no additional work is necessary.
b) If Revision 3 of this ASB has not been accomplished, see the following steps of Section 1.E. of ASB EC135-67A-017 Revision 3 which has been attached to this ASB:
- EFFECTIVITY Control rod L672M2005207 : Steps (1), (3) and (4)
- EFFECTIVITY Ball pivot 92-201-00 : Steps (1) and (3)
- EFFECTIVITY Ball pivot 92-207-00 : Steps (1) and (3) Non-installed equipment and parts:
Do not install an affected control rod (Section 1.A.2 of this ASB) on any helicopter.
1.F APPROVAL Approval of this document:
The technical content of this document is approved under the authority of DOA NO. EASA.21J.700.
1.G MANPOWER None.
1.H WEIGHT AND BALANCE No effects on weight ans balance.
1.l POWER CONSUMPTION Not affected.
1.J SOFTWARE UPGRADES/UPDATES Not changed.
Revision 4, 2017-04-03 PAGE 3 of 4 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB EC135-67A-017
1.K REFERENCES None.
1.L OTHER AFFECTED PUBLICATIONS Publications already updated:
The repetitive inspection introduced with the first issue of this ASB has been incorporated in the AMM EC135/EC635.
Publications to be updated:
Not affected.
1.M INTERCHANGEABILITY OR MIXABILITY OF PARTS Interchangeability:
Not affected.
Mixability:
Not affected.
2 MATERIAL INFORMATION None.
ACCOMPLISHMENT INSTRUCTIONS None.
4 APPENDIX Revision 3 of ASB EC135-67A-017 (9 pages) for information.
NOTE A inspection of the ball pivot P/N 92-207-00 was prescribed with Revision 2 and Revision 3 of this ASB. It had to be accomplished by May 31, 2008 at the latest.
The exchange of the control rod was prescribed with Revision 3 of this ASB. It had to be accomplished by August 31, 2011 at the latest.
PAGE 4 of 4 Revision 4, 2017-04-03 This document is available on the internet: www.airbushelicopters.com/techpub/
eurocopter EC135 an EADS Company
ALERT SERVICE BULLETIN Rotor Flight Controls - Tail Rotor - Inspection of control rod and ball pivot
1. Planning Information A. Effectivity
(1) Helicopters affected: EC135/EC635, all models, excluding S/N 0028. 67A-017 ROS
(2) Components affected: Control rod L672M2005207 Ball pivot 92-201-00 (see Figure 1) or
(3) Spare Parts affected: Not applicable.
B. Concurrent Requirements Not applicable.
C. Reason Due to an incident, where the tail rotor controls have failed, as a precautionary measure, a repeated inspection of the control rod and of the ball pivot of the tail rotor controls is prescribed with this Alert Service Bulletin.
D. Description Check attachment hardware on control rod for tight fit. Check ball pivot for freedom of movement (movability).
E. Compliance EFFECTIVITY Control rod L672M2005207.
Within the next 50 th after receipt of Revision 02 of this Alert Service Bulletin the inspection of the control rod i.a.w. Section 3.B must be accomplished.
(2) After this, the inspection of the control rod i.a.w. Section 3.B must be accomplished in regular intervals within 100 fh +10 fh (tolerance).
(3) If damage is detected on the control rod during the inspection, replace control rod before the next flight and contact ECD customer support.
(4) Control rod L672M2005207 must be replaced by control rod L672M2006101 within the next 400 fh + 40 fh (tolerance) after receipt of Revision 03 of this Alert Service Bulletin, but by August 31, 2011 at the latest. The retrofit is described in SB EC135-67-018.
This document is available on the internet: www.eurocopter.com/techpub 2007-12-13 EC135-67A-017 REVISION 03, 2010-07-26 PAGE 1 of 9
eurocopter EC135 on AS Cop ALERT SERVICE BULLETIN EFFECTIVITY Ball pivot 92-201-00.
(1) Within the next 50 fh after receipt of Revision 02 of this Alert Service Bulletin the inspection of the ball pivot i.a.w. Section 3.C must be accomplished.
After this, the inspection of the ball pivot i.a.w. Section 3.C must be repeated in regular intervals within 100 th +10 th (tolerance).
(3) If damage is detected on the ball pivot during the inspection, replace ball pivot and control rod L672M2005207 before the next flight and inform ECD customer support.
EFFECTIVITY Ball pivot 92-207-00.
31.05.2008 at the latest.
After this, accomplish inspection of the ball pivot i.a.w. Section, 3.D in regular intervals within 400 fh +40 fh (tolerance) or together with the 12-MONTH INSPECTION, depending upon whichever occurs first.
(3) If damage is detected on the ball pivot during the inspection, replace ball pivot and control rod L672M2005207 before the next flight and inform ECD customer support.
F. Approval EASA.21J.034. The technical content of this document is approved under the authority of DOA No. C1 G. Manpower H. Weight and Balance Approx. 3 hours for the inspection of the control rod and the ball pivot. SB Not applicable.
Electrical Load Data Not applicable J. Software Accomplishment Summary Not applicable.
K. References AMM EC135, AMM EC135/635.
Other Publications affected The changes to AMM/MSM EC135 and AMM/MSM EC135/635 which are required as a result of this Alert Service Bulletin will be incorporated with one of the next revisions.
M. Interchangeability of Parts Not applicable.
EC135-67A-017 2007-12-13 PAGE 2 of 9 REVISION 03, 2010-07-26
eurocopter EC135 an EADS Company
ALERT SERVICE BULLETIN
2. Material Information A. Material - Price and Availability The required material can be ordered at the Interturbine company.
B. Support Information Two new locking plates (1, Figure 3) must be used for the installation of the bal pivot. These locking plates (LN9023B6-1.4544.9) must be ordered seperately at ECD. Revision C. Material Necessary for Each Helicopter EFFECTIVITY Ball pivot 92-201-00.
Retrofit kit SB-135-67A-017-2C.
No. New P/N Keyword /Old P/N Qty Disposition 1 Corrosion preventive compound -67A a.n.* (CM 531) *a.n. = as needed Disposition:
A = Consumable material, can be ordered at the Interturbine company as needed.
CM number is given in the list of consumable materials contained in the AMM.
D. Material Necessary for Each Spare Not applicable.
E. Reidentified Parts Not applicable.
p. Mot apicable. F. Specfal Tooling 2007-12-13 EC135-67A-017 REVISION 03, 2010-07-26 PAGE 3 of 9
eurocopter EC135 on AS Comper ALERT SERVICE BULLETIN
3. Accomplishment Instructions A. Preliminary work steps:
(1) Remove tail rotor drive shaft fairing i.a.w. AMM, 53-50-01, 4-1.
EFFECTIVITY All helicopters without AFCS (Automatic Flight Control System).
B. Check control rod:
(1) Check, whether control rod L672M2005207 (7, Figure 2) is installed. ,
(a) If control rod L672M2005207 (7, Figure 2) is not installed, proceed Na.w. Section
3.C or 3.D of this Alert Service Bulletin.
(b) If control rod L672M2005207 (7, Figure 2) is installed, proceed as follows:
NOTE The inspection requires a mirror and a flashlight.
(2) Pull control rod (7, Figure 2) until it reaches its end position. Check attachment hardware of control rod (7) for tight fit and freedom of movement. Manually check that there is no relative motion possible between control rod (7) and yaw actuator (8).
(3) Check locking plate (9, Figure 2) for tight fit
(4) Accomplish visual inspection of attachment hardware between control rod (7, Figure 2) and yaw actuator (8) for pecularities.
(5) If pecularities or signs of damage are detected on the control rod (7, Figure 2) during accomplishment of the inspection, replace damaged components before the next flight and inform ECD customer support.
(6) Proceed i.a.w. Section 3 Cor 3.D.
EFFECTIVITY All helidopters with ball pivot 92-201-00.
C. Check and apply ball pivot with corrosion preventive compound:
(1) Bend open locking plates (1, Figure 3), remove screws (2), locking plates (1) and safety sheet (5). Discard locking plates (1).
Withdraw ball bearing control (3, Figure 3) together with connected yaw actuator (7) forward from bracket (6), until ball pivot (4) is freely accessible.
(3) Manually move ball pivot (4, Figure 3) to all directions:
(a) If ball pivot (4, Figure 3) can be correctly moved, apply corrosion preventive compound (CM 531) onto bearing surfaces.
1 Attach safety sheet (5, Figure 3) and ball pivot (4) to bracket (6). While doing so, place safety sheet (5) with its half-round opening from the tail rotor drive shaft side onto ball bearing control (3). Torque-tighten screws (2) to 3-4 Nm and secure with new locking plates (1). Proceed i.a.w.
Section 3.E.
EC135-67A-017 2007-12-13 PAGE 4 of 9 REVISION 03, 2010-07-26
eurocopter EC135 on As CorALERT SERVICE BULLETIN
(b) If ball pivot (4, Figure 3) cannot be moved and/or signs of damage are detected, replace ball pivot before the next flight, and apply corrosion preventive compound (CM 531) onto bearing surfaces of new ball pivot (92-201-00) and inform ECD customer support. Proceed i.a.w. Section 3.C. (4).
EFFECTIVITY All helicopters with ball pivot 92-201-00 without AFCS.
(4) Check, if control rod L672M2005207 (7, Figure 2) is installed:
(a) If control rod L672M2005207 is installed, replace control rod before the next flight.
Proceed i.a.w. Section 3.E.
EFFECTIVITY All helicopters with ball pivot 92-207-00. (o) If control rod L672M2005207 is not installed, proceed i.a.w. Section 3.E. RevIs D. Check ball pivot:
(1) Bend open locking plates (1, Figure 3), screw (2), locking plates (1) and safety sheet (5).
Discard locking plates (1).
(2) Withdraw ball bearing control (3, Figure 3) together with connected yaw actuator (7) forward from bracket (6), until ball pivot (4) is freely accessible.
(3) Manually move ball pivot (4, Figure 3) to all directions.
CAUTION BALL PIVOT 92-207-00 MUST NOT BE TREATED WITH
CORROSION PREVENTIVE COMPOUND NOR GREASE, AS
OTHERWISE THE TEFLON COATING APPLIED BY MANUFACTURER IS DESTROYED.
(a) If ball pivot 4, Figure 3) can be correctly moved, proceed as follows:
1 Attach safety sheet (5, Figure 3) and ball pivot (4) to bracket (6). While doing so, place safety sheet (5) with its half-round opening from the tail Appena rotor drive shaft side onto ball bearing control (3). Torque-tighten screws (2) to 3-4 Nm and secure with new locking plates (1). Proceed i.a.w.
Section 3.E.
If ball pivot (4, Figure 3) cannot be moved and/or signs of damage are detected, replace ball pivot before the next flight and inform ECD customer support. Proceed
i.a.w. Section 3.D. (4).
EFFECTIVITY All helicopters with ball pivot 92-207-00 without AFCS.
(4) Check, if control rod L672M2005207 (7, Figure 2) is installed:
(a) If control rod L672M2005207 is installed, replace control rod before the next flight.
Proceed i.a.w. Section 3.E.
(b) If control rod L672M2005207 is not installed, proceed i.a.w. Section 3.E.
2007-12-13 EC135-67A-017 REVISION 03, 2010-07-26 PAGE 5 of 9
eurocopter EC135 ontos coper ALERT SERVICE BULLETIN EFFECTIVITY All helicopters.
E. Conclusive works:
(1) Install tail rotor drive shaft fairing i.a.w. AMM, 53-50-01, 4-1.
Confirm accomplishment of this Alert Service Bulletin by an entry in the historical record of the helicopter.
4. Appendix Appendix to SB EC135-67A-017 Revision Not applicable.
EC135-67A-017 2007-12-13 PAGE 6 of 9 REVISION 03, 2010-07-26
eurocopter EC135 an EADS Company
ALERT SERVICE BULLETIN Ball pivot 92-201-00 (black) Ball pivot 92-207-00 (with bare metal surface) 17 Revision 4 2 1 Balk piyot 92-201-00 1 Ball pivot 92-207-00 Apply corrosion preventive compound (CM 531) onto bearing surfaces.
2 Bearing surfaces MUST NOT be treated with corrosion preventive compound nor grease!
Ball Pivot Figure 1 2007-12-13 EC135-67A-017 REVISION 03, 2010-07-26 PAGE 7 of 9
eurocopter EC135 on AoS Comper ALERT SERVICE BULLETIN 1 Input lever of Fenestron actuator 2 Close-tolerance bolt L635M1021201 3 Rod end bearing CN6ME-RK 4 Washer EN2139-06010 5 Nut MBBN3129-06D 6 Cotter pin EN2367-10018 7 Control rod 8 Yaw actuator 418-00847-000 L672M2005207 Rèvision 4 9 Locking plate LN9022-10 135<67A Control Rod Figure 2 EC135-67A-017 2007-12-13 PAGE 8 of 9 REVISION 03, 2010-07-26