Service bulletin · Airbus Helicopters

Revision 1Airbus ASB No EC155-05A027 Rev 1 · 19 pages · 2.5 MB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2015-1570; AD 2015-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2015-1570 (document 0003) · AD 2015-10-05

Manufacturer
Airbus Helicopters
Type
Alert Service Bulletin
Number
EC155-05A027
Latest revision known
EC155-05A027, Revision 1, dated September 1, 2014

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Text · 19OCR

This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2015-1570; AD 2015-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '5c2680b2b2aba43ecbead8a15b6b97ed0718da33f6692f910854605e0667eb01'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027 Civil version: B, B1

ALERT SERVICE BULLETIN SUBJECT: TIME LIMITS - MAINTENANCE CHECKS - External life rafts installed in the footsteps Check of the deployment system of the external life rafts located in the footsteps ATA 25 For the attention of Revision No. Date of issue Revision 0 2014-06-12 Revision 1 2014-09-01 Summary:

Check for corrosion and measurement of the operational clearance in the junction units of the external life raft installation in the footstep.

Reason for last Revision:

Revision 1 of this ALERT SERVICE BULLETIN consists in adding:

- modifications to the junction unit illustrations.

- details concerning compliance with AMM Task 25-69-01-721.

Compliance:

Airbus Helicopters renders compliance with this ALERT SERVICE BULLETIN mandatory, except for paragraph 3.D.

Revision 0 2014-06-12 Page 1/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 2OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

1. PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment Helicopters equipped with external life rafts in the footsteps, with junction units with Part Number (MP/N) 200188 (P/N 704A341302.30).

1.A.2. Non-installed equipment On junction units with Part Number (MP/N) 200188 (P/N 704A341302.30).

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON On an AS365 helicopter, during the maintenance operation scheduled at 600 flying hours or 24 months on the external life rafts located in the footstep, the life raft deployment test carried out by the operator by pulling the LH internal deployment handle did not function correctly.

Investigations revealed the presence of corrosion inside the LH junction unit MP/N 200197. The deployment handle was blocked due to this corrosion.

Corrosion Some EC155 version B and B1 helicopters are equipped with similar junction units with Part Number (MP/N) 200188.

Consequently, pending a definitive solution and in order to prevent any risk of blockage in the external life raft deployment control system, Airbus Helicopters makes compliance with the instructions of this ALERT SERVICE BULLETIN mandatory, except for paragraph 3.D.

Revision 1 does not affect compliance with Revision 0 of this ALERT SERVICE BULLETIN Revision 0 2014-06-12 Page 2/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 3OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

1.D. DESCRIPTION Compliance with this ALERT SERVICE BULLETIN Revision 0 consisted in:

- Checking that the drainage hole blank, located on the RH and LH junction units of the external life raft installation, is correctly positioned

- Measuring the operational clearance between the junction unit pulleys and cover.

- Checking that there is no corrosion inside the junction units.

- If necessary, removing the corrosion from the cover surface and/or pulleys of the junction unit(s).

This ALERT SERVICE BULLETIN Revision 1 consists in:

- Adding modifications to the illustrations of the junction unit, in order to comply with its dimensions and

- Specifying the acceptable tensile loads during compliance with AMM Task 25-69-01-721, by adding paragraph 4.B. and modifying the flow chart in paragraph 1.E.2.

- Modifying part of the wording in paragraph 1.E.2.

- Limiting compliance with this ALERT SERVICE BULLETIN required in the flow chart to paragraphs 3.A. and

1.E. COMPLIANCE

1.E.1. Compliance at the works Helicopters/installed equipment:

Not applicable.

Non-installed equipment:

Before delivery, comply with paragraph 3.B.6. on the junction units specified in paragraph 1.A.2.

Revision 0 2014-06-12 Page 3/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 4OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

1.E.2. Compliance in service The work on the helicopter is to be performed by the operator.

Helicopters/installed equipment:

- Comply with this ALERT SERVICE BULLETIN within the time limits defined in the flowchart below:

Time limits for compliance with this ALERT SERVICE

BULLETIN Comply with AMM Task 25-69-01-721 before the next mission for which life rafts are needed following receipt of this ALERT SERVICE BULLETIN Revision 1, issued on the date indicated at the bottom of the page.

YES Are the tensile loads compliant NO with AMM Task 25-69-01-721 and paragraph 4.B. of this ASB?

Comply with paragraphs 3.A. and 3.B. of Apply a maximum load of 29 DaN this ALERT SERVICE BULLETIN within (65.195 Ibf) to one of the two handles 110 flying hours following compliance during compliance with AMM with AMM Task 25-69-01-721. Task 25-69-01-721.

YES NO Did the snap wire break?

Comply with paragraphs 3.A. and 3.B of this ALERT SERVICE BULLETIN Comply with paragraphs 3.A. and no later than within 15 days following compliance with AMM Task 3.B. of this ALERT SERVICE BULLETIN before the next mission for which life rafts are 25-69-01-721. needed Fill in and return the list of the checked junction units (list given in the Appendix) within 1 month following compliance with paragraphs 3.A. and 3.B. of this ALERT SERVICE BULLETIN Revision 1.

- If corrosion is found, send the list of checked junction units along with photos of the corroded unit (before rework of the unit).

• Contact the Airbus Helicopters Technical Support Department:

Fax: + 33 (0)4.42.85.99.66.

E-mail: Support.Technical-Optionnal@airbus.com END Revision 0 2014-06-12 Page 4/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 5OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

- For helicopters, regardless of whether or not they carry out missions for which life rafts are needed:

• In order to ensure that the operational clearance is checked and measured within a controlled calendar time limit, Airbus Helicopters makes compliance with paragraph 3. of this ALERT SERVICE BULLETIN mandatory, no later than within 3 months following receipt of this ALERT SERVICE BULLETIN, issued on the date indicated at the bottom of the page.

Non-installed equipment:

At the latest before installation on the helicopter, comply with paragraph 3.B.6. on the junction units specified in paragraph 1.A.2.

1.F. APPROVAL Approval of modifications:

Not applicable.

Approval of this document:

The technical information contained in this ALERT SERVICE BULLETIN Revision O was approved on June 11, 2014 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of civil versions subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on September 01, 2014 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of civil versions subject to an Airworthiness Certificate.

1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following personnel qualifications:

Qualification: 1 Mechanical Engineering Technician The time for the operations is given for information purposes, for a standard configuration.

Time for the operations: 6 hours for 1 Mechanical Engineering Technician

1.H. WEIGHT AND BALANCE Not applicable.

Revision 0 2014-06-12 Page 5/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 6OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

1.I. EFFECT ON ELECTRICAL LOADS Not applicable.

1.J. SOFTWARE MODIFICATION EMBODIMENT RECORD Not applicable.

1.K. REFERENCES The documents required for compliance with this ALERT SERVICE BULLETIN are as follows:

MTC: 20.02.01.418: General - Protection of electrical wiring during maintenance operations MTC: 20.04.03.401: Corrosion inhibiting and removal procedures - General method for reconditioning corroded metal surfaces MTC: 20.04.04.403: Surface treatment before painting - Touch-up of protective treatment with Alodine 1200 MTC: 20.04.05.434: Paint and primer application procedure - Application of metal primer scheme P50 AMM: 25-69-01-063: External life raft installation - Removal/installation of life rafts AMM: 25-69-01-061: Life raft - Removal/installation of the life raft deployment controls AMM: 25-69-01-721: Life raft - Functional test of the life raft deployment control system

1.L. DOCUMENTS AFFECTED Airbus Helicopters will modify the Aircraft Maintenance Manual (AMM) with respect to this ALERT SERVICE

BULLETIN The affected document will be updated as part of a future revision.

1.M. INTERCHANGEABILITY OR MIXABILITY OF PARTS Not applicable.

Revision 0 2014-06-12 Page 6/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 7OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

2. MATERIAL INFORMATION

2.A. MATERIAL: PRICE - AVAILABILITY - PROCUREMENT Price For any information concerning the kits and/or components, contact the Airbus Helicopters Network Sales and Customer Relations Department.

Availability The kits and/or components will be delivered on customer's order.

Procurement conditions Order the required quantity (unless otherwise specified) from Airbus Helicopters Etablissement de Marignane Direction Ventes et Relations Client (ECR) 13725 MARIGNANE CEDEX France NOTE 1 On the purchase order, please specify the mode of transport, the destination and the serial numbers of the helicopters to be modified.

NOTE 2 For ALERT SERVICE BULLETINS, order by:

Telex: HELICOP 410 969F Fax: +33 (0)4.42.85.99.96

2.B. INFORMATION CONCERNING INDUSTRIAL SUPPORT Not applicable.

2.C. MATERIAL REQUIRED FOR EACH HELICOPTER/COMPONENT Components to be ordered for one helicopter or one assembly:

Former Designation Qty New P/N • Item P/N Instruction To be returned as Junction unit 1 or 2 200188 1 per paragraph 2.D.

Revision 0 2014-06-12 Page 7/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 8OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027 Products to be ordered separately:

Refer to the Work Cards and Tasks specified in this ALERT SERVICE BULLETIN and the list below:

Designation Qty Product P/N Item Protective product DINOL AV 30 AR CM 508 УУ The products can be ordered separately from the INTERTURBINE AVIATION LOGISTICS company.

Website: http://www.interturbine.com Telephone: +49.41.91.809.300 AOG: +49.41.91.809.444 Specific tooling Designation Qty Tool P/N or equivalent Item diameter 60 to 80mm Internal micrometer, Off the shelf ZZ

2.D. MATERIAL TO BE RETURNED Return the non-compliant junction units) to the following address:

Airbus Helicopters Département EBSEEE Bâtiment R6 Marseilleveyre 13725 MARIGNANE CEDEX - FRANCE Revision 0 2014-06-12 Page 8/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 9OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

3. ACCOMPLISHMENT INSTRUCTIONS

3.А. GENERAL Read and comply with the protection rules for electrical wiring during maintenance operations as per MTC Work Card 20.02.01.418.

3.B. OPERATIONAL PROCEDURE The operational clearance measurements and the check for corrosion are only described for the LH junction unit. Carry out the operational clearance measurements and the check for corrosion in the RH junction unit by complying with the same operational procedure.

3.B.1. Preliminary steps

WARNING

HANDLE THE CONTAINER WITH CARE, TO

PREVENT ACTIVATING THE CYLINDER

PERCUSSION AND TO PREVENT INJURY TO PERSONNEL.

WARNING

BEFORE ANY WORK, RIG THE FLIGHT

CONTROLS IN ORDER TO PREVENT INJURY TO

PERSONNEL AND MAKE SURE THAT THE

LOCKING PIP PIN FITTED WITH ITS PENNANT IS

PRESENT ON THE CYLINDER PERCUSSION

SYSTEM, IN ORDER TO PREVENT ACCIDENTAL PERCUSSION.

- Remove and/or open all cowlings, panels, doors and equipment as required for access to the various work zones.

- Disconnect the cylinder percussion system connection kit as per AMM Task 25-69-01-063.

Revision 0 2014-06-12 Page 9/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 10OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

3.B.2. Check and measurement of the operational clearance of the junction unit

3.B.2.a. Check of the junction unit cover (Figures 1 and 2)

- Remove the screws (b) from the junction unit (f) (Figure 1).

- Remove the cover (a).

- Disconnect the deployment cables (c) and percussion cable (d) from the pulleys (e) located in the junction unit (f) (Figure 1) as per AMM Task 25-69-01-061.

- Remove the junction unit (f) as per AMM Task 25-69-01-061.

- Make sure that the drainage hole located on the upper face of the junction unit cover (a) is blanked with a cap (g) (Figure 2).

- Make sure that the drainage hole located on the lower face of the junction unit cover (a) is not blanked (Figure 2).

NOTE The blanking of the drainage holes depends on the position of the junction unit on the helicopter (refer to Figure 2).

- Comply with paragraph 3.B.2.b.

3.B.2.b. Check of the condition of the junction unit cover and measurement of the operational clearance (Figures 3 and 4)

- Make sure that there is no corrosion inside the cover (a) (Area A, Figure 3).

. If there is no corrosion:

- Measure and record the diameter (D1) of the cover using an internal micrometer (zz) (Figure 4).

- Comply with paragraph 3.B.2.c.

. If there is corrosion:

- Carry out and record measurements of the diameter of the cover using an internal micrometer (zz) (Figure 4):

. Carry out an initial measurement (D1) on a non-corroded surface of the cover.

- If the measurement (D1) cannot be carried out (due to corrosion over the entire circumference of the cover), comply with paragraph 3.B.3.

. Carry out a measurement (D2) on each corroded surface point of the cover.

- Comply with paragraph 3.B.2.c.

Revision 0 2014-06-12 Page 10/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 11OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

3.B.2.c. Check of the condition of the junction unit pulleys and measurement of the operational clearance (Figures 1 and 3)

- Make sure that there is no corrosion on the junction unit pulleys (Area B, Figure 3).

. If there is no corrosion:

- Measure and record the diameter (d1) (not shown) of the pulleys using a caliper gage.

- Interpret the results as per paragraph 3.B.2.d.

. If there is corrosion:

- Carry out and record measurements of the diameter of the pulleys using a caliper gage:

. Carry out an initial measurement (d1) (not shown) on a non-corroded surface of the pulleys.

- If the measurement (d1) cannot be carried out (due to corrosion over the entire circumference of the pulleys), comply with paragraph 3.B.3.

. Carry out a measurement (d2) (not shown) on each corroded surface point of the pulleys.

- Interpret the results as per paragraph 3.B.2.d.

3.B.2.d. Interpretation of the results

- Calculate the initial clearance (J) between the internal/external pulley and the cover of the junction unit:

• Initial clearance J = D1 - d1 . If (J) is greater than (Umax) (see Figure 4), comply with paragraph 3.B.3.

. If (J) is smaller than or equal to (Umax) (see Figure 4):

- If there are no corrosion marks on the junction unit cover and pulleys, comply with paragraph 3.B.4.

- If there is a corrosion mark on the junction unit cover:

. Calculate the depth of the rework (P1) to be carried out on the junction unit cover, for each corrosion point:

- Depth of the rework P1 = D2 - D1 . If P1 is lower than 0, mechanically remove the corrosion from the surface as per MTC Work Card 20.04.03.401 until P1 is higher than or equal to 0 on each reworked surface point.

. If P1 is higher than or equal to 0, record the P1 value for each reworked surface point.

Revision 0 2014-06-12 Page 11/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub

Page 12OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC155-05A027

- If there is a corrosion mark on the junction unit pulley(s):

. Calculate the depth of the rework (P2) to be carried out on the junction unit pulley(s), for each corrosion point:

- Depth of the rework P2 = d1 - d2

• If P2 is less than 0, mechanically remove the corrosion from the surface as per MTC Work Card 20.04.03.401 until P2 is higher than or equal to 0 on each reworked surface point.

. If P2 is greater than or equal to 0, record the P2 value for each reworked surface point.

- Calculate the total clearance between the internal/external pulleys and the cover of the junction unit for each reworked surface point:

• Total clearance = J + P1 +P2.

• If at least one of the two calculated total clearance values is greater than (max) (see Figure 4), comply with paragraph 3.B.3.

• If all calculated total clearance values are less than or equal to (Umax) (see Figure 4), comply with paragraph 3.B.4. on the junction unit (f).

3.B.3. Replacement of the junction unit

- Return the junction unit (f) as per paragraph 2.D.

- Order a new junction unit (1) as per paragraph 2.A

- Comply with paragraph 3.B.4. on the new junction unit (1).

3.B.4. Protection and installation of the junction unit (Figures 1 and 3)

- If the junction unit has been reworked as per 3.B.2.:

. Apply Alodine 1200 to each reworked surface point as per MTC Work Card 20.04.04.403.

- Apply metal primer scheme P50 to Areas A and B of the junction unit (Figure 3) as per MTC Work Card 20.04.05.434.

- Apply Dinol AV 30 to Areas A and B of the junction unit (Figure 3) using a brush.

CAUTION

POSITION THE JUNCTION UNIT WITH THE

DOUBLE CONNECTION POINTING TOWARD THE FRONT OF THE HELICOPTER.

- Install the junction unit as per AMM Task 25-69-01-061.

- Connect the deployment cables (c) and percussion cable (d) to the pulleys (e) located in the junction unit as per AMM Task 25-69-01-061.

- Carry out a functional test of the life raft control system as per AMM Task 25-69-01-721.

- Install the cover (a) using the screws (b) of the junction unit, then,

- tighten to torque as per Figure 1.

- Comply with paragraph 3.B.5.

Revision 0 2014-06-12 Page 12/19 Revision 1 2014-09-01 This document is available on the internet: www.airbushelicopters.com/techpub