Service bulletin · Airbus Helicopters

No revision namedAirbus Helicopters ASB No. EC155-53A038 Rev 0 · 21 pages · 1.2 MB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0717, the docket of AD 2021-18-06. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0717 (document 0002) · AD 2021-18-06

Manufacturer
Airbus Helicopters
Type
Alert Service Bulletin
Number
EC155-53A038

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 21OCR

This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0717, the docket of AD 2021-18-06. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '10bf9a135ab72bc884453956515a19e412df5009c303a8ebab55a3e812f93c01'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038 Civil versions: B, B1

ALERT SERVICE BULLETIN

CORRECTIVE MEASURE FUSELAGE - Cowling and Fairings Modification of the MGB fixed cowling attachment Corresponds to modification 365P084788.06 For the attention of Revision No. Date of issue Revision 0 2018-12-20 Summary:

This ALERT SERVICE BULLETIN consists in modifying the primary attachment system of the fixed cowling of Main Gear Box (MGB) and in adding a second one to provide redundancy for the locking.

Compliance:

Compliance with this ALERT SERVICE BULLETIN is mandatory.

Revision 0 2018-12-20 Page 1/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 2OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

1. PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment or parts Helicopters PRE-MOD 365P084788.06.

NOTE Refer to the aircraft individual inspection record (RIC AMS) to identify the actual modification status of the helicopter.

1.A.2. Non-installed equipment or parts Not applicable.

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON When returning from a mission, the pilot of an AS365 N helicopter heard a noise outside, coming from his right. The pilot observed no change in the helicopter's behavior; the pilot continued his mission.

On the ground, the pilot observed the loss of motor cowlings, MGB fixed and removable cowlings, as well as impacts on a blade and the horizontal stabilizer leading edge.

Tearing of the attachment brackets (fixed parts) of the MGB cowlings was also observed.

Investigations have shown that the rupture of the cowling attachment was linked to an assembly under stress of the cowling on its support causing a fatigue rupture of the bracket.

Consequently, Airbus Helicopters has defined the modification 365P084788.06 to improve the MGB fixed cowling attachment.

This ALERT SERVICE BULLETIN consists in modifying the primary attachment system of the Main Gear Box (MGB) fixed cowling and adding a second one to provide redundancy for the locking.

This ALERT SERVICE BULLETIN supersedes compliances with the ALERT SERVICE BULLETIN 53A035.

1.D. DESCRIPTION This ALERT SERVICE BULLETIN consists in:

- replacing the front bracket,

- checking for the absence of assembly under stress of the MGB fixed cowlings on the radiator bulkhead,

- installing an additional locking system.

Revision 0 2018-12-20 Page 2/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 3OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

1.E. COMPLIANCE

1.E.1. Compliance at H/C manufacturer level Airbus Helicopters makes compliance with the instructions in paragraph 3. of this ALERT SERVICE BULLETIN mandatory before delivery of the helicopter.

1.E.2. Compliance in service The works are to be performed on the helicopter by the operator.

Helicopters/installed equipment or parts:

For helicopters on which ALERT SERVICE BULLETIN No. 53A035 has not been complied with:

Comply with paragraphs 3.B.2.a., 3.B.2.b., 3.B.2.c., 3.B.2.d., 3.B.3. of this ALERT SERVICE BULLETIN No.

53A038 within 110 flight hours as from receipt of ALERT SERVICE BULLETIN No. 53A035 Revision 0, AND, For helicopters on which ALERT SERVICE BULLETIN No. 53A035 has been complied with:

Comply with paragraph 3. within 660 flight hours without exceeding December 31, 2020 (first deadline reached), following receipt of this ALERT SERVICE BULLETIN issued on the date mentioned in the page footer.

Non-installed equipment or parts:

Not applicable.

1.F. APPROVAL Approval of modifications:

The information or instructions relate to the modification 365P084788.06 approved on September 25, 2018 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

Approval of this document:

The technical information contained in this ALERT SERVICE BULLETIN revision O which was approved on December 11, 2018 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

Revision 0 2018-12-20 Page 3/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 4OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following personnel qualification:

Qualification: - 1 Airframe technician Time for the operations is indicated for reference, for a standard configuration and excludes curing time for adhesives and paints.

Time for the operations: - 5 hours approximately for Airframe Technician The helicopter downtime is estimated at approximately 1 day.

1.H. WEIGHT AND BALANCE Negligible.

1.I. POWER CONSUMPTION Not applicable.

1.J. SOFTWARE UPGRADES/UPDATES Not applicable.

1.K. REFERENCES The following documents are required for compliance with this ALERT SERVICE BULLETIN.

AMM: 24.00.00.911: General Safety Instructions - Electrical Power.

AMM: 53.53.00.061: Removal / Installation - MGB Cowlings.

MTC: 20.02.04.401: Installation of rivets - pitch and edge distance - Riveting.

MTC: 20.02.05.401: Joining by riveting - Joining.

MTC: 20.02.05.404: Assembly by screws and nuts - Joining.

MTC: 20.03.06.428: Repair of surface defects on a cowling or a fairing - Structural repairs.

MTC: 20.03.06.429: Repair of perforation of the skin on a cowling or a fairing - Structural repairs.

MTC: 20.04.05.403: Finish scheme 4080 - Paint and primer application procedure.

MTC: 20.06.01.411: Application of HYSOL EA 9396 cement (CM 616) - Bonding with adhesives.

MTC: 20.06.04.305: Application of mixtures No. 16 and 17 - Use of bonding mixtures.

MTC: 20.08.05.103: Monitoring of parts in operation - marking - service life customization - General rules applicable to aircraft.

Revision 0 2018-12-20 Page 4/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 5OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

1.L. OTHER AFFECTED PUBLICATIONS The modification will be integrated into the following manuals:

- Aircraft Maintenance Manual (AMM),

- Illustrated Parts Catalog (IPC).

The IPC and AMM documentation will be updated for the next revision.

1.M. PART INTERCHANGEABILITY OR MIXABILITY Not applicable.

Revision 0 2018-12-20 Page 5/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 6OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

2. EQUIPMENT OR PARTS INFORMATION

2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT For any information concerning cost of modification kit and components or for assistance, contact the Airbus Helicopters Network Sales and Customer Relations Department.

Airbus Helicopters Etablissement de Marignane Direction Ventes et Relations Client 13725 MARIGNANE CEDEX FRANCE NOTE 1 On the purchase order, please always specify the mode of transport, the destination and the numbers of the helicopters to be modified.

NOTE 2 For ALERT SERVICE BULLETINs order by:

Telex: HELICOP 410 969F Fax: +33 (0)4.42.85.99.96.

2.B. LOGISTIC INFORMATION Not applicable.

2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT Kits to be ordered for one helicopter or one assembly:

New Former Designation Qty P/N Item P/N Instruction Modif. MGB fixed cowling attachment 1 365P08-4788-0871 including:

Front bracket 1 365A24-1133-00 Ejecting blade 1 350A58-1023-21 Screw 5 22125BC050024L Washer 5 23116AG050LE Plastic eyelet 2 GP6 DZUS Lock 1 AJ6-90 Blind rivet 2 ASNA0363T0401 Flat washer 2 ASNA0113-32ADL Nut 5 ASN52320BH050N Shim 1 365P08-4788-25 Equipped bracket 1 365P08-4788-09 11 Revision 0 2018-12-20 Page 6/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 7OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038 Equipment or parts to be ordered separately:

For compliance with paragraph 3.B.2.d.2. order according to the following list.

New Former Designation Qty P/N Item P/N Instruction Screw 2 22125BC050024L 3 Washer 2 23116AG050LE 4 Nut 2 ASN52320BH050N 9 Screw 2 22125BC050020L 12 Screw 2 22125BC050022L 13 Screw 2 22125BC050026L 14 Screw 2 22125BC050028L 15 Screw 2 22125BC050030L 16 For compliance with paragraph 3.B.2.e.3. order according to the following list.

New Former Designation Qty P/N Item P/N Instruction Rivet 2 ASNA0363T0402 17 Rivet 2 ASNA0363T0403 18 Consumables to be ordered separately:

As per Work Cards and Tasks mentioned in this ALERT SERVICE BULLETIN and the following list:

Designation Qty Product P/N Item Hollow filler AR BJO-0930 CM7931 20 Glass fiber AR ECS0030-27 CM7246 21 Glue AR ECS0010.10 CM616 22 Glass fiber AR ECS0030-28 CM7020 23 Tedlar film AR ECS0008.20 CM7212 24 Consumables can be ordered separately from the company KLX AEROSPACE SOLUTIONS.

Website: https://www.kixaerospace.com/klxaero/ Telephone: +1.305.925.2600 AOG: +1.305.471.8888

2.D. EQUIPMENT OR PARTS TO BE RETURNED Not applicable.

Revision 0 2018-12-20 Page 7/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 8OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

3. ACCOMPLISHMENT INSTRUCTIONS

3.A. GENERAL

- Read and comply with the instructions concerning the installation of rivets, as per Work Cards 20.02.04.401 and 20.02.05.401 (MTC).

- Unless indicated otherwise, read and comply with the instructions concerning assembling with screws and nuts, as per work card 20.02.05.404 (MTC).

- Read and comply with the instructions for repair concerning surface defaults on a cowling or fairing, as per Work Card 20.03.06.428 (MTC).

- Read and comply with the instructions for repair following a perforation of a cowling or fairing coating, as per Work Card 20.03.06.429 (MTC).

- Read and comply with the instructions for the application of HYSOL EA 9396 glue, as per Work Card

20.06.01.411 (MTC).

- Read and comply with the instructions for the application of mixes No. 16 and No. 17, as per Work Card

20.06.04.305 (MTC).

3.B. WORK STEPS

3.B.1. Preliminary steps

- Disconnect all electrical power supplies as per Task 24.00.00.911 (AMM).

- Install appropriate access equipment.

- Remove the MGB removable cowlings (n) and the MGB fixed cowling RH (b) (Figure 1) as per Task 53.53.00.061 (AMM).

3.B.2. Procedure

3.B.2.a. Removing the front bracket (Figure 1)

- Remove the screws (f), washers (g) and nuts (j) from the front bracket attachment (a) on the radiator bulkhead (k).

- Remove and discard the screws (c), washers (d) and nuts (e) from the front bracket attachment (a) on the MGB fixed cowling LH (h).

- Remove and discard the front bracket (a).

Revision 0 2018-12-20 Page 8/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 9OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

3.B.2.b. Checking for the absence of assembly under stress (Figure 1)

- Position the front bracket (1).

- Install the screws (3) as per the photo below.

- Make sure that the 3 screws (3) are not in contact in the front bracket (1) bores.

• 3 NOTE 1 During the installation of the screws (3) the contact of at least one screw with the front bracket (1) holes is tolerated only if this contact does not generate stress during the assembly of the front bracket (1).

- 3 Assembly with contact Assembly without contact Example of an assembly under stress of the front bracket (1) on the screws (3) of the fixed cowling LH (h) (the 3 attachment screws (3) are in contact with the bracket (see the red arrows))

- If assembly is not under stress, secure the front bracket (1) on the MGB fixed cowling LH (h) using the screws (3), washers (4) and nuts (9) as per the detail B of figure 1.

- If assembly is under stress, comply with paragraph 3.B.2.d. 1.

Revision 0 2018-12-20 Page 9/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 10OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

- Install and lock the MGB fixed cowling RH (b) using the « DZUS».

- Measure the play « J» between the front bracket (1) and the shim (p).

- Make sure that the clearance « J» is less or equal to 1 mm (.039 in) as per photo below.

J ≤ 1 mm (.039 in) p Measuring the clearance « J»

- If the clearance « J» is compliant (assembly not under stress), secure the front bracket (1) on the shim (p) and the radiator bulkhead (k) using the screws (f), washers (g) and nuts (j).

- If the clearance « J» is not compliant (assembly under stress), comply with the paragraph 3.B.2.d.2.

3.B.2.c. Checking the MGB fixed cowling attachment holes (RH and LH) on the radiator bulkhead

- Make sure that the drilling to a diameter of Ø 8mm of the biplane horizontal stabilizer tip junctions (m) of the MGB fixed cowlings (b) and (h) is not ovalized more than half of the diameter of the screw.

- Otherwise, comply with paragraph 3.B.2.d.3.

b . h m Revision 0 2018-12-20 Page 10/21 This document is available on the Internet: www.airbush elicopters.com/techpub

Page 11OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038

3.B.2.d. Reparation solutions

3.B.2.d.1. Change the location of the front bracket (1) attachment holes of the MGB fixed cowling LH (h)

- Define the new locations of the attachment holes on the cowling in accordance with the bracket (1) then drill a diameter of Ø 5.2 mm (.204 in.).

• CAUTION

IF THE NEW HOLES ARE DRILLED IN THE HYGRID (SEE PHOTO BELOW ON THE RIGHT), DO NOT PERFORM THE STRIPPING TO A DIAMETER OF Ø 20 MM (.788 IN.).

Example of drilling in the honeycomb Example of drilling in the HYGRID

- Manually strip all of the damaged zone of the attachment holes of the MGB fixed cowling LH (h) in the honeycomb of the cowling to a diameter of 20 mm (.788 in.).

NOTE 2 If the attachment hole of the MGB fixed cowling LH (h) is tangent to the HYGRID insert, only the honeycomb must be stripped to a diameter of Ø 20 mm (.788 in.).

Honeycomb

• HYGRID New hole Stripped honeycomb zone (Ø 20 mm (.788 in.)) Revision 0 2018-12-20 Page 11/21 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 12OCROpen in PDF

AIRBUS HELICOPTERS ASB N° EC155-53A038 NOTE 3 The stripping to a diameter of • 20 mm (.788 in.) of the attachment holes of the MGB fixed cowling LH (h) also applies to old unused holes.

New hole Old hole Honeycomb Stripped honeycomb zone (• 20 mm (.788 in.))

- Fill all the attachment holes of the MGB fixed cowling LH (h) with the mixture No.17 (20) + (22) and apply the reinforcing fibers (21) on both sides.

NOTE 4 The filling of the attachment holes of the MGB fixed cowling LH (h) with the mixture No.17 and the application of reinforcing fibers also applies to old unused holes.

- Place the bracket (1) to localize the positions of the attachment holes on the cowling.

- Drill the new holes in the MGB fixed cowling LH (h) to a diameter of • 5.2 mm (.204 in.).

- Install the bracket (1) on the MGB fixed cowling LH (h) using the screws (3), the washer (4) and the nuts (9).

- Tighten the nuts (9) as per the torque value defined in figure 1, detail B.

3.B.2.d.2. Manufacturing of a radiator bulkhead shim (paragraph 3.B.2.b. Photo «Measuring the clearance J»)

- Manufacture a shim (not shown in the figure), in composite of 70 mm by 20 mm (2.76 in. by .79 in.) by layering multiple glass fibers (21) + glue (22) to eliminate the clearance « J» as per Work Card

20.03.06.408 (MTC).

- Using the glue (22) affix this shim on the radiator bulkhead (k) at the level of front bracket (1) mating surface as per Work Card 20.06.01.411 (MTC).

- Drill the shim in accordance with the existing holes on the shim (p).

- Install the bracket (1) on the radiator bulkhead (k) using the screws (3) or (12) or (13) or (14) or (15) or

(16), the washer (4) and the nuts (9).

NOTE 5 The screws (f) will be replaced by the screws (3) or (12) or

(13) or (14) or (15) or (16) depending on the thickness of the shim added.

- Install the screws (3) or (12) or (13) or (14) or (15) or (16) and tighten the nuts (9) to the torque indicated in the figure.

Revision 0 2018-12-20 Page 12/21 This document is available on the Internet: www.ai ushelicopters.com/techpub