Service bulletin · Airbus Helicopters

No revision namedASB EC225 05A053 Rev 0 · 11 pages · 354 KB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-0978, the docket of AD 2020-23-02. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2020-0978 (document 0002) · AD 2020-23-02

Manufacturer
Airbus Helicopters
Type
Alert Service Bulletin
Number
EC225-05A053

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

Text · 11OCR

This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-0978, the docket of AD 2020-23-02. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '09c45f5960cdc2966f9b69bcb8cfe4f29af69092050ce113ddefdb0eac419df0'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053 Civil version: LP

ALERT SERVICE BULLETIN

PROTECTIVE MEASURE TIME LIMITS - MAINTENANCE CHECK - Main rotor- swashplate assembly Reduced inspection interval limit for the check of the swashplate bearing ATA: 62 For the attention of Revision No. Date of issue Revision 0 2020-03-31 Summary:

The purpose of this ALERT SERVICE BULLETIN is to reduce the periodicity of the Check of the swashplate assembly's ball bearing from 1100 flight hours to 150 flight hours.

Compliance:

Compliance with this ALERT SERVICE BULLETIN is mandatory.

ASB EC225 05A053 Revision 0 2020-03-31 Page 1/11 This document is available on the Internet: www.airbushe elicopters.com/techpub

Page 2OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

1. PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment or parts Helicopter EC225 version LP equipped with Main Rotor Mast P/N: 332A31-3001-01M, 332A31-3001-02M, 332A31-3002-00M, 332A31-3002-01M, 332A31-3002-02M, 332A31-3032-00M and 332A31-3032-01M.

1.A.2. Non-installed equipment or parts Main Rotor Mast P/N: 332A31-3001-01M, 332A31-3001-02M, 332A31-3002-00M, 332A31-3002-01M, 332A31-3002-02M, 332A31-3032-00M and 332A31-3032-01M.

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON Airbus Helicopters has identified a manufacturing and control issue concerning the ceramic balls of the swashplate bearings which could lead to a potential premature spalling of the swashplate bearing.

The purpose of this ALERT SERVICE BULLETIN is to reduce the periodicity of the Check of the swashplate assembly's ball bearing from 1100 flight hours to an interval not exceeding 150 flight hours.

Airbus Helicopters makes compliance with this ALERT SERVICE BULLETIN mandatory.

1.D. DESCRIPTION This ALERT SERVICE BULLETIN consists in:

- remove the main rotor blades,

- perform a check of the ball bearing of the swashplate assembly,

- if necessary, replace the main rotor mast,

- install the main rotor blades.

Revision 0 2020-03-31 Page 2/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 3OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

1.E. COMPLIANCE

1.E.1. Compliance at H/C manufacturer level Not applicable.

1.E.2. Compliance in service Helicopters/ installed equipment or parts:

Comply with paragraph 3. as per table No. 1 below:

Table No. 1 Flight hours since the last check (Sub-Task 62-20-00-213-091 of the Task 62-20-00-213 (MMA)) Compliance time Periodicity or Since new Comply with paragraph 3.

within 50 flight hours following the receipt of this

ALERT SERVICE More than 100 flight hours BULLETIN without hours since the last check exceeding 1100 flight paragraph 3. at Comply with Comply with paragraph 3. since new. or exceeding 150 interval not flight hours without exceeding 150 flight 100 flight hours or less hours since the last check or since new.

Non-installed equipment or parts:

Comply with Sub-Task 62-20-00-213-091 of the Task 62-20-00-213 (MMA) before installation on helicopter.

Revision 0 2020-03-31 Page 3/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 4OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

1.F. APPROVAL Approval of modifications:

Not applicable.

Approval of this document:

The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on March 30, 2020 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision O was approved on March 30, 2020 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.

1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following staff qualification:

Qualification: 2 Mechanical Technicians.

The Estimated Man-hours are indicated for reference purposes only and based on a standard helicopter configuration.

Estimated Man-hours:

4 hours for one Mechanical Technician.

The estimated helicopter downtime is indicated for reference purposes only, based on a standard helicopter configuration.

Helicopter downtime is estimated half a day.

1.H. WEIGHT AND BALANCE Not applicable.

1.I. POWER CONSUMPTION Not applicable.

1.J. SOFTWARE UPGRADES/UPDATES Not applicable.

Revision 0 2020-03-31 Page 4/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 5OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

1.K. REFERENCES Aircraft Maintenance Manual (MMA) MMA: 62-10-00-061: Removal - Installation - MAIN ROTOR BLADES MMA: 62-20-00-021: Removal - Main rotor mast - MAIN ROTOR MAST ASSEMBLY MMA: 62-20-00-213: Removal - Check - MAIN ROTOR MAST ASSEMBLY MMA: 62-23-00-061: Rotating or Non-Rotating Scissors Removal-Installation - CONTROL SYSTEM MMA: 62-23-00-062: Pitch-Change Rod Removal-Installation - CONTROL SYSTEM Standard Practices Manual (MTC) MTC: 20-07-03-406: Instructions applicable when working on an aircraft electrical circuit and power generating systems - Technical instructions MTC: 20-07-03-408: Appearance Checks on an aircraft after an inspection or repair - Technical instructions

1.L. OTHER AFFECTED PUBLICATIONS Not applicable.

1.M. PART INTERCHANGEABILITY OR MIXABILITY Not applicable.

Revision 0 2020-03-31 Page 5/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 6OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

2. EQUIPMENT OR PARTS INFORMATION

2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT Price For any information on the price of modification kits and/or components or for assistance, contact the Airbus Helicopters Network Sales and Customer Relations Department.

Availability Delivery lead times will be indicated by the Sales and Customer Relations Department on the operator's request.

Procurement Order the required quantity from the Airbus Helicopters Network Sales and Customer Relations Department:

Airbus Helicopters Etablissement de Marignane Direction Ventes et Relations Client 13725 MARIGNANE CEDEX FRANCE NOTE 1 On the purchase order, please specify the mode of transport, the destination and the serial numbers of the helicopters to be modified.

NOTE 2 For ALERT SERVICE BULLETINS, order by:

Telex: HELICOP 410 969F Fax: +33 (0)4.42.85.99.96

2.B. LOGISTIC INFORMATION Not applicable.

Revision 0 2020-03-31 Page 6/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 7OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT Equipment or parts to be ordered separately:

Old Key Word Qty New P/N Item PIN →→ Instruction Main rotor mast assy 1 332A31-3001-01M 1 332A31-3001-01M Replace if necessary Main rotor mast assy 1 332A31-3001-02M 2 332A31-3001-02M Replace if necessary Main rotor mast assy 332A31-3002-00M 3 332A31-3002-00M Replace if necessary Main rotor mast assy 332A31-3002-01M 4 332A31-3002-01M Replace if necessary Main rotor mast assy 1 332A31-3002-02M 5 332A31-3002-02M Replace if necessary Main rotor mast assy 1 332A31-3032-00M 6 332A31-3032-00M Replace if necessary Main rotor mast assy 1 332A31-3032-01M 7 332A31-3032-01M Replace if necessary Revision 0 2020-03-31 Page 7/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 8OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053 Consumables to be ordered separately:

As per the Work Cards and Tasks indicated in this ALERT SERVICE BULLETIN.

Aviatec global aviation Website: https://www.aviatec.net Telephone: +33 1.34.46.45.25 or +49 4193.8803.630 Fax: +33 1 34.46.45.26 or +49 4193.8803.699 AOG: +49 4193.8803.660 AOG email: aog@aviatec.aero Gaches chimie Website: www.gaches.com Telephone: +33 5.61.31.64.45 Fax: +33 5.61.40.98.63 AOG email: marketplace@gaches.com BDSI Website: https://www.boeingdistribution.com Telephone: +1.305.925.2600 Fax: +1.305.507.7191 AOG: +1.305.471.8888 AOG email: AOGdesk@Boeingdistribution.com Special tools:

Key Word Qty Tool P/N or equivalent Item Commercial Strap (Load capacity of 2500 daN ZZ minimum) Commercial Rubber sleeve (Length 600 mm and thickness УУ 2mm)

2.D. EQUIPMENT OR PARTS TO BE RETURNED

- Return main rotor mast assembly as per the procedure described in Information Notice No. 2832-1-00.

- Inform Airbus Helicopters to the following address:

https://keycopter.airbushelicopters.com Revision 0 2020-03-31 Page 8/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 9OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

3. ACCOMPLISHMENT INSTRUCTIONS

3.A. GENERAL Not applicable.

3.B. WORK STEPS

3.B.1. Preliminary steps

- Disconnect all the electrical power supplies as per Work Card 20-07-03-406 (MTC).

- Install appropriate access equipment.

3.B.2.a. Disconnect of the pitch rods and scissor rods

- Remove main rotor blades as per Task 62-10-00-061(MMA).

- Disconnect the pitch rods as per Sub-Task 62-23-00-032-001 of the Task 62-23-00-062 (MMA).

- Disconnect the rotating scissors from the swashplates as per Sub-Task 62-23-00-031-001 of the Task 62-23-00-061 (MMA).

3.B.2.b. Check of the ball bearing of the swashplate assembly Compliance with the work steps concerned with the check is described in a video which is accessible by following the link below:

https://dai.ly/k4G3nKqpHcsyDyvUY6B

- Perform a check of the ball bearing of the swashplate assembly as per Sub-Task 62-20-00-213-091 of the Task 62-20-00-213 (MMA).

- Interpret results as per paragraph 3.B.2.c.

Revision 0 2020-03-31 Page 9/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 10OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

3.B.2.c. Interpretation of the results

- If there is a hard point and/or a sensitive axial play as per Sub-Task 62-20-00-213-091 of the Task 62-20-00-213 (MMA):

. Remove the main rotor mast assembly as per Task 62-20-00-021 (MMA).

• Install a new main rotor mast assembly (1) or (2) or (3) or (4) or (5) or (6) or (7) as per Task 62-20-00-021 (MMA).

. Return the main rotor mast assembly (a) (not shown) to Airbus Helicopters as per paragraph 2.D.

- If there is no hard point and/or a sensitive axial play:

. Comply with paragraphs 3.B.2.d.

3.B.2.d. Installation of the pitch rods and scissor rods

- Connect the rotating scissors from the swashplates as per Sub-Task 62-23-00-431-001 of the Task 62-23-00-061 (MMA).

- Install a strap (zz) (not shown) with two rubber sleeves (yy) (not shown) between the non-rotating swashplate (not shown) and the main rotor sleeve (not shown).

- Position the rubber sleeves (yy) at contact area with the non-rotating swashplate (not shown) and the main rotor blade sleeve (not shown) to prevent damage.

NOTE 1 The use of the strap (zz) makes it possible to align one axe of one pitch rods with one axe of the swashplate (a) or (1) or

- Connect the pitch rods as per sub-task 62-23-00-432-001 of the Task 62-23-00-062 (MMA).

NOTE 2 Make sure to actuate slowly the pawl of the strap (zz) to avoid interference between the pitch-rod and the swashplate

(a) or (1) or (2) or (3) or (4) or (5) or (6) or (7).

- Remove the strap (zz) and the rubber sleeves (yy).

- Install main rotor blades as per Task 62-10-00-061(MMA).

3.B.4. Final steps

- Clean the work areas and the helicopter and return them to their initial condition as per Work Card 20-07-03-408 (MTC).

- Remove the access equipment.

- Connect all electrical power supplies as per Work Card 20-07-03-406 (MTC).

Revision 0 2020-03-31 Page 10/11 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 11OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-05A053

3.C. RECORD OF COMPLIANCE Compliance with this document:

Record full compliance with this ALERT SERVICE BULLETIN, with the revision number in the log card (FM) of the swashplate assembly.

Please confirm compliance with this ALERT SERVICE BULLETIN:

QR-Code or hypertext link NOTE 3 The recording of compliance with ALERT SERVICE BULLETIN in the R-Tex tool does not replace the recording in the helicopter documents.

ASB EC225 05A053

3.D. OPERATING AND MAINTENANCE INSTRUCTIONS Not applicable.

Revision 0 2020-03-31 Page 11/11 This document is available on the Internet: www.airbushelicopters.com/techpub