On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD.
Text · 13OCR
This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0020; AD 2021-10-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6981841926d00ec165bbf394081f79807157702d4daef4a308e91f847bb7d55e' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6981841926d00ec165bbf394081f79807157702d4daef4a308e91f847bb7d55e' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
AIRBUS HELICOPTERS ASB No. EC225-25A211 Civil version: LP
ALERT SERVICE BULLETIN
CORRECTIVE MEASURE EQUIPMENT AND FURNISHINGS - Life rafts in multipurpose sponsons Replacement of LH and RH life raft release bellcranks Corresponds to modification 0728457 For the attention of Revision No. Date of issue Revision 0 2019-04-03 Revision 1 2019-10-23 Summary:
The purpose of this ALERT SERVICE BULLETIN is to improve the reliability of the percussion control for the LH and RH life raft inflation cylinders.
Reason for last revision:
The purpose of revision 1 of this ALERT SERVICE BULLETIN is to extend effectivity by removing the prerequisite modification (MOD 0725749) not applicable to EC225 LP version and to allow the control bellcrank spring to be reused.
Compliance:
Airbus Helicopters renders compliance with this ALERT SERVICE BULLETIN mandatory.
Revision 0 2019-04-03 Page 1/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB No. EC225-25A211
1. PLANNING INFORMATION
1.A. EFFECTIVITY
1.A.1. Helicopters/installed equipment or parts Helicopters fitted with the installation "emergency life rafts in the multipurpose sponsons" PRE-MOD 0728457.
NOTE Refer to the Individual Inspection Record (RIC AMS) to identify the actual configuration of the helicopter.
1.A.2. Non-installed equipment or parts
- LH bellcranks, P/N 332A41-4396-20,
- RH be cranks, P/N 332A41-4396-21.
1.B. ASSOCIATED REQUIREMENTS Not applicable
1.C. REASON Airbus Helicopters has been informed that during the first application of the maintenance task of adjustment and test of the emergency life rafts at the client's premises, the bellcranks of the raft inflation cylinders were jammed due to galvanic corrosion, so that deployment was not possible.
In order to prevent this risk of getting jammed Airbus Helicopters has developed modification 0728457, which involves replacing the existing bellcranks (Aluminum 2024 with Alodine treatment) with new bellcranks (Anodized aluminum 717517351) fitted with a polyamide bush.
Compliance with this ALERT SERVICE BULLETIN cancels the instructions imposed by EMERGENCY ALERT SERVICE BULLETINS EC225-05A048 and EC225-05A050.
The purpose of this ALERT SERVICE BULLETIN is to restore the reliability of the percussion control for the LH and RH life raft inflation cylinders.
Airbus Helicopters renders compliance with this ALERT SERVICE BULLETIN mandatory.
Reason for revision 1 The purpose of revision 1 of this ALERT SERVICE BULLETIN is to extend effectivity by removing the prerequisite modification (MOD 0725749) not applicable to EC225 LP version and to allow the control bellcrank spring to be reused.
Revision 1 of this ALERT SERVICE BULLETIN does not affect compliance with revision O.
Revision 0 2019-04-03 Page 2/13 Revision 1 2019-10-23 This document is available on the internet: www.a licopters.com/techpub/
AIRBUS HELICOPTERS ASB No. EC225-25A211
1.D. DESCRIPTION Modification 0728457 consists in:
- removing the cylinder holders from the multi-purpose sponsons,
- removing the support assemblies from the cylinder holders,
- on the existing pivot shafts of the support assemblies, replacing the bellcranks with new levers fitted with a polyamide bush,
- installing the support assemblies,
- installing the cylinder holders.
Addition of material to the new bellcrank to enable the bush Support assembly installation Pivot shaft Bush Front view of LH cylinder holder New bellcrank Cross-section of bellcrank
1.E. COMPLIANCE
1.E.1. Compliance at H/C manufacturer level Airbus Helicopters makes compliance with the instructions given in paragraph 3. of this ALERT SERVICE BULLETIN mandatory before delivery of the helicopter.
1.E.2. Compliance in service The work on the helicopter and on non-installed equipment or parts must be performed by the operator.
Helicopters/ installed equipment or parts:
Comply with paragraph 3., within 6 months following receipt of this ALERT SERVICE BULLETIN revision 1 issued on the date indicated at the bottom of the page.
Non-installed equipment or parts:
After compliance with this ALERT SERVICE BULLETIN, scrap the stock of bellcranks specified in paragraph 1.A.2.
Building-up stocks of spare parts related to compliance with this ALERT SERVICE BULLETIN is left to the operator's initiative.
Revision 0 2019-04-03 Page 3/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB No. EC225-25A211
1.F. APPROVAL Approval of modifications:
The information or instructions relate to modification 0728457, which was approved on July 19, 2019 by EASA for civil version helicopters subject to an Airworthiness Certificate.
Approval of this document:
The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on January 30, 2019 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on January 30, 2019 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.
The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on October 22, 2019 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.
The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on October 22, 2019 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.
1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the use of personnel with the following qualifications:
Qualification:
- 1 Mechanical Engineering Technician.
The times for the operations is given for reference purposes, for a standard configuration.
Time for the operations:
- approximately 1 day for each side for 1 Mechanical Engineering Technician.
The estimated helicopter downtime is 2 days for having the LH and RH bellcranks replaced by 1 Mechanical Engineering Technician.
1.H. WEIGHT AND BALANCE Negligible.
1.I. POWER CONSUMPTION Not applicable Revision 0 2019-04-03 Page 4/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB No. EC225-25A211
1.J. SOFTWARE UPGRADES/UPDATES Not applicable
1.K. REFERENCES The following documents are necessary for compliance with this ALERT SERVICE BULLETIN
- MMA: 25-66-01-021: Removal of Life Raft POST MOD 0726590.
- MMA: 25-66-01-061: Emergency Life Raft in Multipurpose Sponson.
- MMA: 25-66-01-421: Installation of Life Raft POST MOD 0726590.
- MMA: 25-66-01-821: Adjustment - Ground Test of Life Raft Inflation Control POST MOD 0726590.
- MTC: 20.02.05.404: Joining by bolts and nuts.
- MTC: 20.02.06.404: Safetying with cotter pins.
- MTC: 20.04.01.102: Use of cleaning products on individual parts and on aircraft.
- MTC: 20.07.01.201: Handling of helicopters in a hangar and in a prepared area.
- MTC: 20.07.02.201: Helicopter parked in a repair shop.
- MTC: 20.07.03.408: Appearance checks on an aircraft after an inspection or repair.
1.L. OTHER AFFECTED PUBLICATIONS The modification shall be incorporated into:
- Index of modifications (SIM),
- Illustrated Parts Catalog (IPC),
- Aircraft Maintenance Manual (MMA).
Updates to these documents will be distributed later.
1.M. PART INTERCHANGEABILITY OR MIXABILITY Interchangeability:
PRE MOD and POST MOD bellcranks are not interchangeable.
Mixability:
It is prohibited to mix PRE MOD and POST MOD parts: full embodiment of modification 0728457 is mandatory (RH AND LH sides).
Revision 0 2019-04-03 Page 5/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB No. EC225-25A211
2. EQUIPMENT OR PARTS INFORMATION
2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT The Airbus Helicopters Super Puma Program Department will inform customers of the availability times of kits or components.
Airbus Helicopters Etablissement de Marignane Direction Ventes et Relations Client 13725 MARIGNANE CEDEX France NOTE 1 On the purchase order, please specify the mode of transport, the destination and the serial numbers of the helicopters to be modified.
NOTE 2 Order ALERT SERVICE BULLETINS via:
Telex: HELICOP 410 969F Fax: +33 (0)4.42.85.99.96.
2.B. LOGISTIC INFORMATION Not applicable.
Revision 0 2019-04-03 Page 6/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB No. EC225-25A211
2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT Kit to be ordered for one helicopter:
Former Description Qty New P/N Item PIN Instruction Life raft release bushed lever kit 332A72-8457-0071 comprising:
LH bellcrank 332A41-4396-22 332A41-4396-20 Scrap RH bellcrank 1 332A41-4396-23 332A41-4396-21 Scrap Bush 2 332A41-4397-20 Cotter pin 6 MS24665-151 Plain pin 4 22719BC050012L Washer 4 23111CA050 Spring 2 332A41-4445-20 See NOTA 3 Hex head screw 22201BC060024L Flat washer 23116AG060LE 9 Flat washer 23111AG060LE 10 Castellated hex nut 22453BC060L 11 Rivet washer 2 ASNA011340ADL 12 Plain pin 2 22719BC040015L 13 NOTE 3 The springs (7) must be stored because they are not used in this ALERT SERVICE BULLETIN.
Consumables to be ordered separately:
In accordance with the Work Cards and Tasks specified in this ALERT SERVICE BULLETIN.
The consumables can be ordered separately from the following companies:
Aviatec global aviation Gaches chimie Website: www.aviatec.net Telephone: +33 1.34.46.45.24 or +49 4193 8803 630 Fax: +33 1.34.46.45.26 or +49 4193 8803 699 AOG: +49 4193 8803 660 AOG email: aog@aviatec.aero Website: www.gaches.com Telephone: +33 5 61 31 64 45 Fax: +33 5.61.40.98.63 AOG email: marketplace@gaches.com BDSI Website: https://www.boeingdistribution.com Telephone: +1.305.925.2600 Fax: +1.305.507.7191 AOG: +1.305.471.8888 AOG email: AOGdesk@Boeingdistribution.com
2.D. EQUIPMENT OR PARTS TO BE RETURNED Not applicable.
Revision 0 2019-04-03 Page 7/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB No. EC225-25A211
3. ACCOMPLISHMENT INSTRUCTIONS
3.A. GENERAL
- Read and comply with the instructions for handling helicopters in a repair workshop as per Work Card 20.07.01.201 (MTC).
- Read and comply with the instructions for parking helicopters in a repair workshop as per Work Card 20.07.02.201 (MTC).
- Unless otherwise indicated, comply with the instructions for joining by bolts and nuts as per Work Card 20.02.05.404 (MTC).
3.B. WORK STEPS NOTE 1 Only the procedure for installing LH bellcrank (1) is described; install the RH bellcrank (2) by performing the same work steps.
3.B.1. Preliminary steps
- Install appropriate access means.
CAUTION
BEFORE ANY WORK ON THE SYSTEM, MAKE
SURE THAT THE CYLINDER SAFETY PINS ARE IN POSITION.
Depending on configuration:
- Remove:
. the cover in accordance with Sub-task 25-66-01-031-001 of Task 25-66-01-061 (MMA), . the cylinder in accordance with Sub-task 25-66-01-031-002 of Task 25-66-01-061 (MMA), . the survival kit in accordance with Sub-task 25-66-01-031-003 of Task 25-66-01-061 (MMA), . the raft in accordance with Sub-task 25-66-01-031-004 of Task 25-66-01-061 (MMA), Or
- Remove the life raft assembly POST MOD 0726590 in accordance with Task 25-66-01-021 (MMA).
Revision 0 2019-04-03 Page 8/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub
AIRBUS HELICOPTERS ASB No. EC225-25A211
3.B.2. Procedure
3.B.2.a. Removing the bellcrank (Figure 1)
CAUTION
BEFORE REMOVING THE COTTER PINS, MAKE
THAT THE AREA IS PROPERLY
PROTECTED TO PREVENT DROPPING THE
WASHERS AND PINS INTO THE SPONSON OF THE LIFE RAFT.
- Remove and scrap cotter pin (a), pin (b), and washer (c).
- Remove and scrap cotter pin (a), pin (d), and washer (e).
NOTE 2 When removing rod (f) take care not to alter the setting.
- Remove and retain rod (f).
- Remove and retain spring (g).
- Remove and scrap cotter pin (a), castellated nut (h), washer (k), screw (l) and washer (m).
- Remove and scrap bel crank (n).
- Clean the pivot shaft of support assembly (p) in accordance with Work Card 20.04.01.102 (MTC).
3.B.2.b. Installing the bush and be crank (Figure 2)
- Install bush (3) and bellcrank (1) ((2) for RH side) on the shaft of support assembly (p) using screw (8), washers (9) and (10) and castellated nut (11) (Cross-section C-C).
- Tighten nut (11) to standard torque.
CAUTION TO LOCK NUT (11) USING COTTER PIN (4), DRILL A 2 MM DIA. HOLE IN SCREW (8) (SEE PHOTO BELOW).
11 Ø 2 mm (.079 in.)
- Lock nut (11) using cotter pin (4) in accordance with Work Card 20.02.06.404 (MTC).
- Install spring (g).
- Position rod (f), washer (6), pin (5) and cotter pin (4).
- Install cable (q) using washer (12), pin (13) and cotter pin (4) (Detail B).
Revision 0 2019-04-03 Page 9/13 Revision 1 2019-10-23 This document is available on the internet: www.airbu ushelicopters.com/techpub
AIRBUS HELICOPTERS ASB No. EC225-25A211
3.B.3. Final steps
CAUTION
MAKE SURE THAT THE CYLINDER SAFETY PINS
ARE IN POSITION BEFORE STARTING ANY WORK ON THE SYSTEM.
Depending on configuration:
- Install:
. the raft in accordance with Sub-task 25-66-01-421-001 of Task 25-66-01-421 (MMA), . the cylinder in accordance with Sub-task 25-66-01-421-002 of Task 25-66-01-421 (MMA), . the survival kit in accordance with Sub-task 25-66-01-421-003 of Task 25-66-01-421 (MMA), . the cable in accordance with Sub-task 25-66-01-421-004 of Task 25-66-01-421 (MMA), Or
- Install the life raft assembly POST MOD 0726590 in accordance with Task 25-66-01-421 (MMA).
- Remove the access equipment.
- Check the appearance of the work area in accordance with Work Card 20.07.03.408 (MTC).
3.B.4. Tests
- Carry out the adjustments and ground tests for the life raft percussion control as per Task 25-66-01-821 (MMA)
- Install the cover in accordance with Sub-task 25-66-01-421-005 of Task 25-66-01-421 (MMA).
3.C. COMPLIANCE CONFIRMATION Compliance with this document:
Record compliance with this document, with the revision number, in the helicopter documentation.
Tracking of modifications in the documentation:
Record the embodiment of modification 0728457 in the helicopter documentation.
3.D. OPERATING AND MAINTENANCE INSTRUCTIONS Not applicable.
Revision 0 2019-04-03 Page 10/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub
AIRBUS HELICOPTERS ASB No. EC225-25A211
PRE MOD
FRONT VIEW
DETAIL B CDı
CROSS-SECTION c-c Figure 1 Revision 0 2019-04-03 Page 11/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub
AIRBUS HELICOPTERS ASB No. EC225-25A211
PAGE LEFT BLANK INTENTIONALLY Revision 0 2019-04-03 Page 12/13 Revision 1 2019-10-23 This document is available on the internet: www.airbushelicopters.com/techpub