Service bulletin · Airbus Helicopters

Revision 1Airbus Helicopters ASB EC225-63A031 Rev 1 · 68 pages · 4.7 MB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0016, the docket of AD 2021-11-05. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0016 (document 0004) · AD 2021-11-05

Manufacturer
Airbus Helicopters
Type
Alert Service Bulletin
Number
EC225-63A031
Latest revision known
EC225-63A031, Revision 1

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

Text · 68OCR

This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0016, the docket of AD 2021-11-05. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '514644d8db900720ae364ffaea7fcadb228cd0cbfe62cb1436f3cacd7cec891b'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031 Civil version: LP

ALERT SERVICE BULLETIN SUBJECT: MAIN ROTOR DRIVE - MGB emergency spraying system Increase in the reliability of the EMLUB system by addition of a relay Corresponds to modification 0728369 For the attention of Revision No. Date of issue Revision 0 2016-08-31 Revision 1 2016-10-07 Summary:

This ALERT SERVICE BULLETIN consists in adding a relay to the EMLUB system in order to increase its reliability.

Reason for last Revision:

After the grounding order for EC225 LP version helicopters has been lifted by EASA, Airbus Helicopters extends the effectivity of this ALERT SERVICE BULLETIN to all EC225 LP version helicopters (subject to airworthiness directive (AD) EASA2016-0104-E or not).

Compliance:

Airbus Helicopters makes compliance with this ALERT SERVICE BULLETIN mandatory.

Revision 0 2016-08-31 Page 1/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 2OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031 1- PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment or parts EC225 LP version helicopters that do not embody modification 0728369.

NOTE Refer to the Aircraft Individual Inspection Record (or RIC AMS) to identify the actual modification status of the aircraft.

1.A.2. Non-installed equipment or parts Not applicable.

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON Revision 0:

Airbus Helicopters has been informed of several occurrences of oil seepage on the ground from the Main GearBox (MGB), detected on the upper deck and fuselage surfaces. The subsequent investigation revealed that:

- In all cases, MGB oil seepage resulted from pressurization of the MGB by compressed air produced by the engine during start-up (on the ground), because the Emergency Lubrication System (EMLUB) "P 2.4"valve was inadvertently opened in response to a signal from the EMLUB electronic control card.

The signal to open the valve was triggered by an electrical power interruption when changing from ground to aircraft power.

- Pressurization of the MGB could result in a total loss of MGB oil.

To prevent inadvertent pressurization of the MGB and loss of MGB oil, Airbus Helicopters has issued this mandatory ALERT SERVICE BULLETIN.

This ALERT SERVICE BULLETIN requires the addition of an electrical relay whose function is to confirm the presence of the EMLUB electronic control card signal which is generated by the crew by manually pressing the "SHOT" button, thus activating the EMLUB system.

In addition, in order to ensure full compliance of the fleet within a controlled calendar time, Airbus Helicopters requests compliance with paragraph 3. of this ALERT SERVICE BULLETIN not later than May 2017.

Revision 1:

After the grounding order for EC225 LP version helicopters has been lifted by EASA, Airbus Helicopters extends the effectivity of this ALERT SERVICE BULLETIN to all EC225 LP version helicopters (subject to airworthiness directive (AD) EASA2016-0104-E or not).

ALERT SERVICE BULLETIN No. 63A028 is superseded by this ALERT SERVICE BULLETIN.

Revision 1 of this ALERT SERVICE BULLETIN does not affect compliance with the previous revision.

Revision 0 2016-08-31 Page 2/68 Revision 1 2016-10-07 This document is available on the Internet: www.airb ishelicopters.com/techpub

Page 3OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031

1.D. DESCRIPTION This ALERT SERVICE BULLETIN consists in adding a relay to the EMLUB system in order to increase its reliability.

1.E. COMPLIANCE

1.E.1. Compliance at H/C manufacturer level Airbus Helicopters imposes compliance with the instructions given in paragraph 3. of this Service Bulletin, betore delivery.

1.E.2. Compliance in service The works must be performed on helicopter by the Operator.

Helicopters/installed equipment or parts:

Comply with paragraph 3. within 500 flight hours following receipt of this ALERT SERVICE BULLETIN Revision 0, issued on August 31, 2016.

In addition, in order to ensure full compliance of the fleet within a controlled calendar time, Airbus Helicopters requests compliance with paragraph 3. of this ALERT SERVICE BULLETIN not later than May 31, 2017.

THEN, Comply with Task 63-26-00-721 in APPENDIX 4 of this ALERT SERVICE BULLETIN or any subsequent revision of this Task every 600 flight hours (margin of 225 flight hours) and insert it in the Aircraft Maintenance Manual (MMA).

CAUTION

PENDING THE UPDATE OF THE MMA WORK CARDS, PAGES OF TASK 63-26-00-721 OF APPENDIX 4.A OF

THIS ALERT SERVICE BULLETIN SUPERSEDE THE PAGES OF TASK 63-26-00-721 DATED DECEMBER 03, 2015.

Non-installed equipment or parts:

Not applicable.

1.F. APPROVAL Approval of modifications:

The information or instructions relate to modification 0728369 which was approved on May 06, 2016 under the authority of EASA Design Organization Approval No. 21J.056 for helicopters of civil versions subject to an Airworthiness Certificate.

The information or instructions relate to modification 0728369 which was approved on May 06, 2016 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.

Revision 0 2016-08-31 Page 3/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 4OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031 Approval of this document:

The technical information contained in this ALERT SERVICE BULLETIN revision 0 was approved on July 27, 2016 by the Airbus Helicopter Airworthiness Department for helicopters of civil versions not subject to Airworthiness Directive EASA 2016-0104-E.

The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on July 27, 2016 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.

The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on October 07, 2016 under the autority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on October 07, 2016 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.

1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following personnel qualifications:

Qualification: - 1 Avionics Technician

- 1 Airframe Technician.

Time for the operations is indicated for reference, for a standard configuration.

Time for the operations: - approximately 20 hours for 1 Avionics Technician.

- approximately 2 hours for 1 Airframe Technician for the relay support installation.

The estimated helicopter downtime is approximately 4 days.

1.H. WEIGHT AND BALANCE Weight: + 0.05 kg Longitudinal moment: +0.09 m.kg Lateral moment: -0.04 m.kg On completion of the work, record weights and moments in the "Weight & Balance" sheet of the Flight Manual.

1.I. POWER CONSUMPTION Not applicable.

1.J. SOFTWARE OPGRADES/UPDATES Not applicable.

Revision 0 2016-08-31 Page 4/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 5OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031 1 K. REFERENCES The following documents are necessary for compliance with this ALERT SERVICE BULLETIN:

Aircraft Maintenance Manual:

MMA: 24-00-00-611: Electric power - General instructions MMA: 24-20-00-061: AC POWER SYSTEM - Removal-Installation of A/C electrical master box MMA: 31-60-00-062: Vehicle monitoring system - Removal-installation of AMC unit (PRE MOD 0726845) MMA: 31-60-00-063: Vehicle monitoring system - Removal-installation of AMC unit (POST MOD 0726845) MMA: 34-70-00-062: Navigation system - Removal-installation of PU 1 and PU 4 units Standard Practices Manual:

MTC: 20.02.01.102: General - Identification of electrical installations MTC: 20.02.01.418: General - Protection of electrical wiring during maint. operations MTC: 20.02.04.401: Riveting - Installation of rivets - pitch and edge distance MTC: 20.02.04.601: Riveting - General riveting acceptance requirements MTC: 20.02.05.401: Assembly - Joining by riveting MTC: 20.02.07.101: Electrical bonding - General MTC: 20.02.07.401: Electrical bonding - Bonding procedure MTC: 20.02.07.407: Electrical bonding - Applying CHO-LUB 117 conductive paste MTC: 20.07.02.201: Safety instructions - Helicopter parked inside a hangar MTC: 20.07.03.408: Technical instructions - Appearance checks on an aircraft after an inspection or repair MTC: 20.80.20.101: Standard Practices, Electricity - Contact Insertion and Extraction Method and Tools MTC: 20.80.20.402: Standard Practices, Electricity - Removal / Installation of Cables Ties MTC: 20.80.20.407: Standard Practices, Electricity - Tools and Processes for Stripping Cables MTC: 20.80.20.408: Standard Practices, Electricity - Method for crimping of electrical contacts for a connector MTC: 20.80.20.413: Standard Practices, Electricity - Installation of relays and junction modules MTC: 20.80.20.425: Standard Practices, Electricity - Tools and Settings Associated with the Crimping of Contacts MTC: 20.80.20.601: Standard Practices, Electricity - Rules and inspection of attachment of terminal lugs on hardware MTC: 20.80.20.441: Standard Practices, Electricity - Installation of electrical harnesses MTC: 20.80.20.603: Standard Practices, Electricity - Securing Rules for Electrical Harnesses MTC: 20.80.20.604: Standard Practices, Electricity - Check of Crimping of Contacts

1.L. OTHER AFFECTED PUBLICATIONS This ALERT SERVICE BULLETIN will give rise to amendment of the following documents by Airbus Helicopters:

- Aircraft Maintenance Manual: MMA,

- Wiring Diagram Manual: WDM,

- System Description Section: SDS.

These documents will be circulated at a later date.

1.M. PART INTERCHANGEABILITY OR MIXABILITY Not applicable.

Revision 0 2016-08-31 Page 5/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 6OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031

2. EQUIPMENT OR PARTS INFORMATION

2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT Airbus Helicopters Super Puma Program Department will advise Customer of availability deadlines for kits or components.

Airbus Helicopters Etablissement de Marignane Direction Ventes et Relations Client 13725 MARIGNANE CEDEX FRANCE NOTE 1 On the purchase order, please always specify the mode of transport, the destination and the serial numbers of the helicopters to be modified.

NOTE 2 For ALERT SERVICE BULLETINS, order by:

Telex: HELICOP 410 969F Fax: +33 (0)4.42.85.99.96.

2.B. LOGISTIC INFORMATION For any information concerning modification kits and/or components or for assistance, contact the Sales and Customer Relations Department.

Revision 0 2016-08-31 Page 6/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 7OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031

2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT Kits to be ordered for one helicopter or one assembly:

New Former Designation Qty P/N Item P/N → Instruction Improvement of the EMLUB system reliability:

332A0728369071 Relay, plug-in M6106/38-002 Base, relay M12883/45-04 Module, shunt NSA937901M22-04 Module, diode E0566-20-01 Set, wires and markers 332A0889130097 Set of markers 332A6167460099 Set of markers 332A0889180099 Lug, round, pre-insulated NSA936501TA2206 Nut, self-locking 52350CBD050N Rivet, blind NAS1399CW3A2 10 Screw 22208BC050012L 11 Washer, flat 23111AG050LE 12 Contact, swaged EN3155-016M2018 13 Contact, swaged 13 EN3155-016M2222 14 Contact, swaged 5 EN3155-003F2222 15 Contact, swaged 2 EN3155-018M2020 16 Contact, swaged 2 EN3155-019F2018 17 Contact M39029/101-552 18 Coil Contact 4 M39029/101-553 19 Switch Washer 2 23111AG040LE 21 Rivet, flat round head 4 21215DC3208J 22 Nut, hexagonal, self- ASN52320BH040N locking 2 23 Bolt, round head 2 22272BC040010L 24 Support, individual, NSA937915-20 module 25 Support, individual, NSA937915-16 module 26 Support, relay 332A616460.20 27 Consumables to be ordered separately:

As per Work Cards and Tasks mentioned in this ALERT SERVICE BULLETIN:

The consumables can be ordered separately from the INTERTURBINE AVIATION LOGISTICS company.

Website: http://www.interturbine.com Telephone: +49.41.91.809.300 AOG: +49.41.91.809.444

2.D. EQUIPMENT OR PARTS TO BE RETURNED Not applicable.

Revision 0 2016-08-31 Page 7/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 8OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031

3. ACCOMPLISHMENT INSTRUCTIONS

3.A. GENERAL

- Read and comply with the general electrical instructions as per MMA Task 24-00-00-611.

- Read and comply with safety instructions for aircraft parked inside a hangar as per MTC Work Card

20.07.02.201.

- Read and comply with general instructions on the identification of electrical installations as per MTC Work Card 20.02.01.102.

- Read and comply with general instructions for electrical bonding as per MTC Work Card 20.02.07.101.

- Read and comply with general instructions for protection of electrical wiring during maintenance operations as per MTC Work Card 20.02.01.418.

- Read and comply with instructions on electricity standard practices for removal/installation of cable ties as per MTC Work Card 20.80.20.402.

- Read and comply with instructions on electricity standard practices for installation of electrical harnesses as per MTC Work Card 20.80.20.441.

- Read and comply with instructions on electricity standard practices concerning tools and processes associated with cables stripping as per MTC Work Card 20.80.20.407.

- Read and comply with instructions on electricity standard practices concerning tools and settings associated with the crimping of contacts as per MTC Work Card 20.80.20.425.

- Read and comply with instructions on electricity standard practices concerning check of contact stripping as per MTC Work Card 20.80.20.604.

- Read and comply with instructions on electricity standard practices for installation of relays and junction modules as per MTC Work Card 20.80.20.413.

- Read and comply with instructions on electricity standard practices on the method and insertion and extraction tools for contacts as per MTC Work Card 20.80.20.101.

- Read and comply with instructions on electricity standard practices for securing rules of electrical harnesses as per MTC Work Card 20.80.20.603.

- Read and comply with standard practices instructions on riveting instructions - pitch and edge distance - as per MTC Work Card 20.02.04.401.

- Read and comply with the general riveting acceptance instructions as per MTC Work Card 20.02.04.601.

- Read and comply with standard practices instructions for joining by riveting as per MTC Work Card

20.02.05.401.

- Read and comply with rules and inspection on attachment of terminal lugs on hardware as per MTC Work Card 20.80.20.601.

3.B. WORK STEPS

3.B.1. Preliminary steps

- Remove and/or open all cowlings, panels, doors and all equipment as required for access to work zones.

- Remove A/C electrical master box as per MMA Task 24-20-00-061.

- Remove AMC computer as per MMA Task 31-60-00-062 or 31-60-00-063.

- Remove Processor Units 1 and 4 (PU 1 and PU 4) as per MMA Task 34-70-00-062.

- Protect electrical wiring in the work area as per MTC Work Card 20.02.01.418.

Revision 0 2016-08-31 Page 8/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 9OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031

3.B.2. Procedure

3.B.2.a. Installation of relay support (27) (Figure 1)

- Obey dimensions of Figure 1:

. Drill and deburr holes as per detail B.

Do the electrical bonding as per Detail D and as per MTC Work Card 20.02.07.401.

. using rivets (22), install relay support (27).

- Install module individual supports (25) and (26).

- Install relay base (2).

- Do the electrical bonding as per detail E and as per MTC Work Card 20.02.07.407.

- Using screws (24), washers (21) and nuts (23), install diode module (4).

3.B.2.b. Installation of ground point "686VN" (Figure 4)

- Install ground point "686VN" (Figure 4)

• Obey dimensions of Detail F, Figure 4:

.. Drill and deburr holes as per detail A.

.. Do the electrical bonding as per Detail A and as per MTC Work Card 20.02.07.401.

.. Install self-locking nut (9) using blind rivets (10).

3.B.2.c. Installation of set of wires (5) (Figures 1 to 4)

- Route set of wires (5) using Figures 2 and 3.

- Install identification sleeves on wires.

- Using contacts (13), (14), (15), (16), (17), (18) and (19), connect:

• Relay base (2).

. Diode module (4) identified "897VT1".

• PCB rack identified "16WW".

Shunt module (3) identified "897VT2".

. Strips identified "40VCC" and "79VCD".

Test electrical continuity of installed wiring.

- Bold male 140k: i and 10g/i 2. from se of markers (7).

- Install identification sleeve on wire "6324-0150".

- Install pre-insulated lug (8) on marker identified "6324-0150".

- Using flat washer (12), screw (11), connect ground identified "686VN" as per Figures 3 and 4.

- Bond mark "686VN" from set of markers (6).

- Install AMC computer as per MMA Task 31-60-00-062 or 31-60-00-063.

- Install PU 1 and PU 4 units as per MMA Task 34-70-00-062.

- Install A/C electrical master box as per MMA Task 24-20-00-061.

3.B.3. Tests

- Perform a functional test of the installations which were disconnected or removed for access.

- Perform an electrical operational test of the emergency spraying system as per sub-task 63-26-00-721-004 of MMA Task 63-26-00-721 in APPENDIX 4 and repair if necessary.

- Carry out an appearance check of an aircraft after an inspection or repair as per MTC Work Card

20.07.03.408.

3.B.4. Final steps

- Install and/or close all cowlings, panels, doors and all equipment removed and/or opened during preliminary steps (paragraph 3.B.1.).

Revision 0 2016-08-31 Page 9/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 10OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031

3.C. COMPLIANCE CONFIRMATION Compliance with instructions of this document:

Record compliance with this Service Bulletin with the Revision number in the aircraft documents.

Tracking of modifications in the documentation:

Record compliance with modification 0728369 in the aircraft documents.

3.D. OPERATING AND MAINTENANCE INSTRUCTIONS Operating instructions:

Not applicable.

Maintenance instructions:

Pending updates of the work cards, at each replacement (Removal/Installation) of the emergency spraying system as mentioned in MMA Task 63-26-00-061, comply with Task 63-26-00-721 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for MMA Task 63-26-00-721 issued on December 03, 2015.

Pending updates of the work cards, at each replacement (Removal/Installation) of the glycol reservoir as mentioned in MMA Task 63-26-00-062, comply with sub-task 63-26-00-721-002 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for MMA Task 63-26-00-721 issued on December 03, 2015.

Pending updates of the work cards, at each replacement (Removal/Installation) of the glycol motorpump as mentioned in MMA Task 63-26-00-063, comply with sub-task 63-26-00-721-002 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for sub-task 63-26-00-721-002 of MMA Task 63-26-00-721 issued on December 03, 2015.

Pending updates of the work cards, at each replacement (Removal/Installation) of the electric actuator as mentioned in MMA Task 63-26-00-067, comply with sub-task 63-26-00-721-002 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for sub-task 63-26-00-721-002 of MMA Task 63-26-00-721 issued on December 03, 2015.

Pending updates of the work cards, at each filling of the GLYCOL reservoir as mentioned in MMA Task 63-26-00-871, comply with sub-task 63-26-00-721-002 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for sub-task 63-26-00-721-002 of MMA Task 63-26-00-721 issued on December 03, 2015.

Pending updates of the work cards, at each replacement (Removal/Installation) of the pressure sensors (AIR/GLYCOL) as mentioned in MMA Task 63-26-00-065, comply with sub-tasks 63-26-00-721-003 and 63-26-00-721-004 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for MMA Task 63-26-00-721 issued on December 03, 2015.

Pending updates of the work cards, at each replacement (Removal/Installation) of the electrovalve as mentioned in MMA Task 63-26-00-064, comply with sub-task 63-26-00-721-005 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for sub-task 63-26-00-721-003 of MMA Task 63-26-00-721 issued on December 03, 2015.

Revision 0 2016-08-31 Page 10/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 11OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031 Pending updates of the work cards, at each replacement (Removal/Installation) of the air cooler as mentioned in MMA Task 63-26-00-066, comply with sub-task 63-26-00-721-005 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for MMA Task 63-26-00-721 issued on December 03, 2015.

Pending updates of the work cards, at each compliance with MMA Task 05-53-00-231, comply with sub-task 63-26-00-721-005 in APPENDIX 4 of this ALERT SERVICE BULLETIN as replacement for sub-task 63-26-00-721-003 of MMA Task 63-26-00-721 issued on December 03, 2015.

The Aircraft Maintenance Manual (MMA) will include these instructions in a future revision. Once these instructions are included in the MMA, refer to it.

Revision 0 2016-08-31 Page 11/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub

Page 12OCROpen in PDF

AIRBUS HELICOPTERS ASB No. EC225-63A031

PAGE LEFT BLANK INTENTIONALLY Revision 0 2016-08-31 Page 12/68 Revision 1 2016-10-07 This document is available on the Internet: www.airbushelicopters.com/techpub