- Manufacturer
- Airbus Helicopters
- Type
- Alert Service Bulletin
- Number
- MBB-BK117
- Copies
- 2 files of 1 revision
A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.
ADs that cite it · 3
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 2 proposed ADs.
Text · 29Partly OCR
No revision named, the newest copy. Some pages are OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-1007, the docket of AD 2022-02-20. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'eb39659a3f3972368890ad2d58d2511de53168d2efc98b6915f60bf63ff6da8e' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'eb39659a3f3972368890ad2d58d2511de53168d2efc98b6915f60bf63ff6da8e' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 Valid for Version(s): C-2, C-2e.
ALERT SERVICE BULLETIN
PROTECTIVE MEASURE ROTOR FLIGHT CONTROL - Upper controls Inspection for correct installation of the collective bellcrank For the attention of Revision No. Date of issue Revision O 2021-03-15 Summary:
With this Alert Service Bulletin (ASB), Airbus Helicopters introduces a one-time inspection for correct installation of the collective bellcrank.
Compliance:
It is mandatory to comply with this ASB.
Revision 0, 2021-03-15 PAGE 1 of 17 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 1 PLANNING INFORMATION
1.A EFFECTIVITY
1.A.1 Helicopters/installed equipment and parts
a) MBB-BK117 C-2, C-2e, all S/N up to 9869 inclusive*.
* The S/N 9870 and on are delivered after the release of this ASB and the collective bellcrank-K has not been replaced in service on these S/Ns.
b) Bellcrank-K P/N B670M7021101 P/N B670M7021102
1.A.2 Non-installed equipment and parts Not applicable.
1.B ASSOCIATED REQUIREMENTS None.
1.C REASON A collective bellcrank-K was replaced in service and incorrectly installed (rotated by 180°). This collective bellcrank-K was operated on a helicopter and was found during an inspection. Consequently, with this ASB the installation of the collective bellcrank-K must be inspected and if necessary corrected. In addition, the AMM tasks AMM 67-10-00, 5-3, AMM 67-13-00, 4-3 and AMM 67-13-00, 4-4 were changed to ensure correct installation of the collective bellcrank-K and to ensure free movement after its installation.
1.D DESCRIPTION Examine the documents of the collective bellcrank-K. If necessary, inspect the collective bellcrank-K for correct installation, inspect the affected areas and replace the affected components.
1.E COMPLIANCE
1.E.1 Compliance at H/C manufacturer level Helicopters/installed equipment and parts:
Not affected.
Non-installed equipment and parts:
Not affected.
PAGE 2 of 17 Revision 0, 2021-03-15 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030
1.E.2 Compliance in service Helicopters/installed equipment and parts:
Part I: Examination of the documents of the collective bellcrank-K Examine the documents of the collective bellcrank-K in accordance with Section
3.B. 1 within the next 100 Fh or before the 30 September, 2021 whichever occurs first after receipt of this ASB.
Part II: Inspection of the collective bellcrank-K If necessary based on the results of Part I of this ASB, inspect the collective bellcrank-K in accordance with Section 3.B.2 within the next 100 Fh or before the 30 September, 2021 whichever occurs first after receipt of this ASB.
Part III: Correction of the installation of the collective bellcrank-K If necessary based on the results of Part Il of this ASB, correct the installation of the collective bellcrank-K in accordance with Section 3.B.3 before the next flight.
Part IV: Correction of the position marking of the collective bellcrank-K (already installed in the correct position) Latest during the next disassembly of the bellcrank assembly correct the position marking of the collective bellcrank-K in accordance with Section 3.B.4.
Revision 0, 2021-03-15 PAGE 3 of 17 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 Part I) The collective bel crank-K has been installed in accordance with No AMM 67-13-00, 4-4?
End of Part I y Yes/unknown Part II) The distance Z is < 69 mm as shown No in Figure 1?
Part III Correct the installation of the Yes collective bellcrank-K.
The End of position Part II!
marking of the collective No bellcrank-K is applied as shown in Forecast the compliance time of Figure 1? Part IV and schedule the accomplishment accordingly.
Yes End of End of Part II Part I| (Part IV Correct the position marking of the collective bellcrank-K.
End of Part IV PAGE 4 of 17 Revision 0, 2021-03-15 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 Non-installed equipment and parts:
Not affected.
1.F APPROVAL Approval of this document:
The technical content of this document is approved under the authority of DOA No. EASA.21J.700.
1.G MANPOWER Qualification Mechanic Electrician Pilot Others* approx. 0.5 h approx. 0.5 h (inspection) (inspection) Estimated approx. 8 h Man-hours (removal and installation, if necessary) * CAMO (or equivalent)
1.H WEIGHT AND BALANCE No effect on weight and balance.
1.I POWER CONSUMPTION Not affected.
SOFTWARE UPGRADES/UPDATES Not changed.
1.K REFERENCES AMM MBB-BK117 C-2.
1.L OTHER AFFECTED PUBLICATIONS Publications already updated:
The changes to AMM MBB-BK117 C-2 which were necessary as a result of this ASB are already incorporated.
Publications to be updated:
Not affected.
1.M INTERCHANGEABILITY OR MIXABILITY OF PARTS Interchangeability:
Not affected.
Mixability:
Not affected.
Revision 0, 2021-03-15 PAGE 5 of 17 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 2 MATERIAL INFORMATION
2.A MATERIAL: PRICE - AVAILABILITY - PROCUREMENT None.
2.B LOGISTIC INFORMATION None.
2.C MATERIAL REQUIRED PER HELICOPTER/COMPONENT None.
2.D MATERIAL TO BE RETURNED None.
PAGE 6 of 17 Revision 0, 2021-03-15 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030
ACCOMPLISHMENT INSTRUCTIONS З.А GENERAL Obey the "General Recommendations for Working at Helicopters" (AMM 00-20-02, 2-1).
З.В WORK STEPS Part I: Examination of the documents of the collective bellcrank-K З.В.1 Examination of the documents of the collective bellcrank-K
1. Examine the helicopter documents to determine if the collective bellcrank-K (4, Fig. 1) has been installed in accordance with AMM 67-13-00, 4-4:
a. If the collective bellcrank-K (4, Fig. 1) has been installed in accordance with AMM 67-13-00, 4-4, proceed with Section 3.B.2.
b. If the collective bellcrank-K (4, Fig. 1) has never been removed since build of the helicopter, it is not necessary to accomplish Part II, Part III and Part IV of this ASB. Proceed with Section 3.C to confirm accomplishment of Part I.
c. If it cannot be determined if the collective bellcrank-K (4, Fig. 1) has been installed in accordance with AMM 67-13-00, 4-4, proceed with Section 3.B.2.
Part II: Inspection of the collective bellcrank-K
3.В.2 Inspection of the collective bel crank-K
1. Remove the transmission cowlings (AMM 71-11-00, 4-3).
2. Measure the distance Z, between the front edge of the bearing block (7, Fig. 1) and the front edge of the collective bellcrank-K (4), as shown in Figure 1 to determine if the installation is correct:
a. If the distance Z is less than 69 mm, the installation of the collective bellcrank-K (4, Fig. 1) can be determined as correct. Proceed in accordance with Section 3.B.2.3.
b. If the distance Z is more than or equal to 69 mm, the installation of the collective bellcrank-K (4, Fig. 1) cannot be determined as correct. Proceed in accordance with Section 3.B.3.
3. Make sure that the position marking (5, Fig. 1) is applied as shown in Figure 1:
a. If the position marking (5, Fig. 1) is applied as shown in Figure 1, proceed with Section 3.B.2.4.
b. If the position marking (5, Fig. 1) is not applied as shown in Figure 1:
- Forecast the compliance time of Part IV and schedule the accomplishment accordingly
- Install the transmission cowlings (AMM 71-11-00, 4-3)
- Proceed with Section 3.C to confirm accomplishment of Part I and Part II.
4. Install the transmission cowlings (AMM 71-11-00, 4-3).
5. It is not necessary to accomplish Part III and Part IV of this ASB. Proceed with Section 3.C to confirm accomplishment of Part I and Part II.
Revision 0, 2021-03-15 PAGE 7 of 17 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 View A Detail C View D × 1 68 mm View B > FW D Bolt 2 Bolt З Bellcrank-Q < 69 mm 4 Bel crank-K 6 N 5 Position marking 6 Bel crank-L Bearing block For information only Inspection of the collective bellcrank-K Figure 1 PAGE 8 of 17 Revision 0, 2021-03-15 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 Part III: Correction of the installation of the collective bellcrank-K З.В.З Correction of the installation of the collective bel crank-K
1. Remove the bellcrank-K (4, Fig. 1) (AMM 67-13-00, 4-4).
2. Discard the bellcrank-K (4, Fig. 1) and the bolts (1, 2).
3. Inspect the bearing block (1, Fig. 2), in the affected area, for signs of chafing:
a. If the bearing block (1, Fig. 2) has signs of chafing, replace the bearing block
(1) (AMM 67-13-00, 4-4). Proceed with Section 3.B.3.4.
b. If the bearing block (1, Fig. 2) has no signs of chafing, proceed with Section З.В.3.4.
4. Inspect the control lever (2, Fig. 2), in the affected area, for signs of chafing:
a. If the control lever (2, Fig. 2) has signs of chafing, replace the control lever (2) (AMM 67-13-00, 4-5). Proceed with Section 3.B.3.5.
b. If the control lever (2, Fig. 2) has no signs of chafing, proceed with Section З.В.З.5.
5. Inspect the forked lever (3, Fig. 2), in the affected area, for signs of chafing:
a. If the forked lever (3, Fig. 2) has signs of chafing, replace the forked lever (3) (AMM 67-13-00, 4-6). Proceed with Section 3.B.3.6.
b. If the forked lever (3, Fig. 2) has no signs of chafing, proceed with Section З.В.3.6.
6. Inspect the sliding sleeve (4, Fig. 2), in the affected area, for signs of chafing:
a. If the sliding sleeve (4, Fig. 2) has signs of chafing, replace the sliding sleeve
(4) (AMM 62-31-00, 4-3). Proceed with Section 3.B.3.7.
b. If the sliding sleeve (4, Fig. 2) has no signs of chafing, proceed with Section З.В.3.7.
7. Inspect the bearing ring (5, Fig. 2), in the affected area, for signs of chafing:
a. If the bearing ring (5, Fig. 2) has signs of chafing, replace the bearing ring (5) (AMM 62-31-00, 4-3). Proceed with Section 3.B.3.8.
b. If the bearing ring (5, Fig. 2) has no signs of chafing, proceed with Section
3.В.3.8.
Revision 0, 2021-03-15 PAGE 9 of 17 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030
8. Create a Technical Event (TE) on WebTEK. Airbus Helicopters will analyze the data. Depending on the results, additional limitations are necessary for the affected components:
a. With WebTEK access:
- Create a TE on WebTEK: https://airbusworld.helicopters.airbus.com
- Select the TE business domain: "SB/ASB Feedback"
- Select the request type: "MBB-BK117 C-2-67A-030"
- Insert the data as shown on the reply form sheet on page 15 and 16.
- Send the TE.
b. Without WebTEK access:
- Copy, fill out and send back the reply form sheet on page 15 and 16.
9. Continue as detailed in the support feedback received from Airbus Helicopters.
10. Install a serviceable bellcrank-K (4, Fig. 1) with an applied position marking (5) as shown in Figure 1 and serviceable bolts (1, 2) (AMM 67-13-00, 4-4).
11. Install the transmission cowlings (AMM 71-11-00, 4-3).
12. It is not necessary to accomplish Part IV of this ASB. Proceed with Section 3.C to confirm accomplishment of Part I, Part Il and Part III.
Part IV: Correction of the position marking of the collective bellcrank-K (already installed in the correct position) З.B.4 Correction of the position marking of the collective bellcrank-K (already installed in the correct position)
1. Remove the transmission cowlings (AMM 71-11-00, 4-3).
2. Remove the bellcrank-K (4, Fig. 1) (AMM 67-13-00, 4-4).
3. The bel crank-K (4, Fig. 1) can be reworked or replaced:
a. For the rework of the bellcrank-K (4, Fig. 1) contact Airbus Helicopters via customersupport.helicopters@airbus.com to request rework instructions for the bellcrank-K (4) and continue as detailed in the support feedback received from Airbus Helicopters.
b. For the replacement of the bellcrank-K (4, Fig. 1) proceed with Section 3.B.4.4.
4. Discard the bellcrank-K (4, Fig. 1).
5. Install a serviceable bellcrank-K (4, Fig. 1) with an applied position marking (5) as shown in Figure 1 (AMM 67-13-00, 4-4).
6. Install the transmission cowlings (AMM 71-11-00, 4-3).
7. It is not necessary to accomplish Part IIl of this ASB. Proceed with Section 3.C to confirm accomplishment of Part IV.
PAGE 10 of 17 Revision 0, 2021-03-15 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 View A Detail C View E Detail D View B 1 Bearing block 2 Control lever Forked lever 4 Sliding sleeve 5 Bearing ring Inspection of the affected areas Figure 2 Revision 0, 2021-03-15 PAGE 11 of 17 This document is available on the internet: www.airbushelicopters.com/techpub/
AIRBUS HELICOPTERS ASB MBB-BK117 C-2-67A-030 View A View B 1 Main rotor actuator MHA-collective 2 Tube horizontal control rod (collective) 3 Rod end assy 4 Rod end assy 5 Bolt (bearing block) 6 Tube vertical control rod (collective) 7 Rod end assy 8 Rod end assy Additional affected components Figure 3 PAGE 12 of 17 Revision 0, 2021-03-15 This document is available on the internet: www.airbushelicopters.com/techpub/