Service bulletin · Airbus

No revision namedSB A300-57-6117 · 538 pages · 4.4 MB

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-0084; AD 2017-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2015-0084 (document 0008) · AD 2017-10-05

Manufacturer
Airbus
Type
Service Bulletin
Number
A300-57-6117

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 538Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-0084; AD 2017-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '6f2d2bec95ce78d37504851be343f4710b2cf806f91050a67dc7668edbde0f6d'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

@A300-600

SERVICE BULLETIN

SUMMARY AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1 This summary is for information only and is not approved for modification of the aircraft.

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 57 TITLE: WINGS - CENTER WINGS - INSPECTION OF FRAME 40 LOWER

OUTBOARD RADIUS FOR CRACKS **CONF ALL

MODIFICATIONS None

REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES Further to in-service findings, mandatory Inspection Service Bulletin No. A300-57-6052 was issued to inspect the lower outboard radius of frame 40 forward fitting. In addition, Modification Service Bulletin No. A300-57-6053 was proposed as a terminating action of Inspection Service Bulletin No.

A300-57-6052, either as a corrective or preventive action. Recent crack findings on post-Service Bulletin No. A300-57-6053 aircraft and a new extensive study led Airbus to define new inspection for all aircraft with or without Service Bulletin No. A300-57-6053 applied.

The Service Bulletin No. A300-57-6053 is no longer considered as a terminative action of Inspection Service Bulletin No. A300-57-6052.

This new Inspection Service Bulletin cancels and supersedes the Inspection Service Bulletin No.

A300-57-6052. It proposes repair solutions depending on crack length, and their associated inspection program. In addition new areas must also be inspected inside the Center Wing Box for aircraft with Service Bulletin No. A300-57-6053 embodied.

Accomplishment of this Inspection Service Bulletin will allow early detection of cracks avoiding long cracks which can lead to costly and time-consuming repairs.

GENERAL EVALUATION

EVALUATION TABLE

COMPLIANCE MANDATORY (1)

CANCELS INSPECTION SB NO

POTENTIAL AD YES

A/C OPERATION AFFECTED NO

RELIABILITY AFFECTED NO

PAX COMFORT AFFECTED NO

COST SAVING NO

ETOPS AFFECTED NO

STRUCTURAL LIFE EXTN NO

VENDOR SB INVOLVED NO DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 1 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY

EVALUATION TABLE

DE-FUELING/VENTILATION YES NOTE

(1) : Service Bulletin must be accomplished.

MATERIAL PRICE INFORMATION **CONF 001

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 576117A01R00 2

314.00 Bolt, Nut Kit 576117A02R00 2 1,132.00 Bolt, Nut Kit 576117A03R00 2 3,580.00 Bolt, Nut Kit 576117A04R00 2 1,236.00 Bolt, Nut Kit 576117A05R00 2

754.00 Bolt, Nut Kit 576117A06R00 1

293.00 Bolt, Nut Kit 576117A07R00 2

356.00 Bolt, Nut Kit 576117A08R00 2 1,236.00 Bolt, Nut Kit 576117A09R00 1

335.00 Bolt, Nut Kit 576117A10R00 2

104.80 Bolt, Nut TOTAL 9,340.80 **CONF 002

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 576117A06R00 1

293.00 Bolt, Nut Kit 576117A05R00 2

754.00 Bolt, Nut Kit 576117A09R00 1

335.00 Bolt, Nut Kit 576117A10R00 2

104.80 Bolt, Nut TOTAL 1,486.80 **CONF 003

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 576117A06R00 1

293.00 Bolt, Nut Kit 576117A05R00 2

754.00 Bolt, Nut Kit 576117A09R00 1

335.00 Bolt, Nut TOTAL 1,382.00 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 2 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY **CONF 004

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 576117A01R00 2

314.00 Bolt, Nut Kit 576117A02R00 2 1,132.00 Bolt, Nut Kit 576117A03R00 2 3,580.00 Bolt, Nut Kit 576117A04R00 2 1,236.00 Bolt, Nut Kit 576117A05R00 2

754.00 Bolt, Nut Kit 576117A06R00 1

293.00 Bolt, Nut Kit 576117A07R00 2

356.00 Bolt, Nut Kit 576117A08R00 2 1,236.00 Bolt, Nut Kit 576117A09R00 1

335.00 Bolt, Nut Kit 576117A10R00 2

104.80 Bolt, Nut TOTAL 9,340.80 **CONF 005

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 576117A06R00 1

293.00 Bolt, Nut Kit 576117A05R00 2

754.00 Bolt, Nut Kit 576117A09R00 1

335.00 Bolt, Nut TOTAL 1,382.00 **CONF 006 No Material

EFFECTIVITY **CONF ALL This Service Bulletin is applicable to this (these) operator(s) :

67Q ABR AHK BCS F2I FDX IRA IRM KAC MNB MSR SUD TAR

T H AU Q A U T PU Z B

CONCURRENT REQUIREMENTS None

REFERENCES / REPERCUSSIONS TFU

57.10.00.006 OEB None AOT None DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 3 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY SIL None

LINE MAINTENANCE AFFECTED No

LIFE LIMIT None OTHER None

NATURE OF THE WORK

AIRCRAFT YES

EQUIPMENT NO HARD NO SOFT NO OBRM NO

MANPOWER **CONF 001 Task 576117-839-801-001: Contact and Report to AIRBUS

TOTAL MANHOURS

0.00 Task 576117-832-801-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius For Cracks for LH and RH Sides

TOTAL MANHOURS

91.00

ELAPSED TIME (HOURS)

45.00 Task 576117-832-802-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius for Cracks After Repair for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 Task 576117-832-804-001: Special Detailed Inspections of the Surrounding Area of the Repair for Cracks for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-805-001: Special Detailed Inspection of the Surrounding Area of the Rework for Cracks for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-808-001: Rototest Inspection of Fastener Hole in Area of Rib 1 Triform in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-806-001: Rototest Inspection of Fastener Holes in the Front Spar Lower Flange area in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

39.00

ELAPSED TIME (HOURS)

19.50 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 4 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY Task 576117-832-809-001: Ultrasonic Inspection of Center Wing Box Lower Panel Area for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 **CONF 002 Task 576117-839-801-001: Contact and Report to AIRBUS

TOTAL MANHOURS

0.00 Task 576117-832-801-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius For Cracks for LH and RH Sides

TOTAL MANHOURS

35.00

ELAPSED TIME (HOURS)

17.50 Task 576117-832-804-001: Special Detailed Inspections of the Surrounding Area of the Repair for Cracks for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-808-001: Rototest Inspection of Fastener Hole in Area of Rib 1 Triform in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-806-001: Rototest Inspection of Fastener Holes in the Front Spar Lower Flange area in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

39.00

ELAPSED TIME (HOURS)

19.50 Task 576117-832-809-001: Ultrasonic Inspection of Center Wing Box Lower Panel Area for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 **CONF 003 Task 576117-839-801-001: Contact and Report to AIRBUS

TOTAL MANHOURS

0.00 Task 576117-832-801-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius For Cracks for LH and RH Sides

TOTAL MANHOURS

35.00

ELAPSED TIME (HOURS)

17.50 Task 576117-832-805-001: Special Detailed Inspection of the Surrounding Area of the Rework for Cracks for LH and RH Sides

TOTAL MANHOURS

34.00 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 5 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY Task 576117-832-805-001: Special Detailed Inspection of the Surrounding Area of the Rework for Cracks for LH and RH Sides

ELAPSED TIME (HOURS)

17.00 Task 576117-832-808-001: Rototest Inspection of Fastener Hole in Area of Rib 1 Triform in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-806-001: Rototest Inspection of Fastener Holes in the Front Spar Lower Flange area in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

39.00

ELAPSED TIME (HOURS)

19.50 Task 576117-832-809-001: Ultrasonic Inspection of Center Wing Box Lower Panel Area for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 **CONF 004 Task 576117-839-801-001: Contact and Report to AIRBUS

TOTAL MANHOURS

0.00 Task 576117-832-801-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius For Cracks for LH and RH Sides

TOTAL MANHOURS

90.75

ELAPSED TIME (HOURS)

45.00 Task 576117-832-802-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius for Cracks After Repair for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 Task 576117-832-804-001: Special Detailed Inspections of the Surrounding Area of the Repair for Cracks for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-805-001: Special Detailed Inspection of the Surrounding Area of the Rework for Cracks for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-808-001: Rototest Inspection of Fastener Hole in Area of Rib 1 Triform in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 6 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY Task 576117-832-806-001: Rototest Inspection of Fastener Holes in the Front Spar Lower Flange area in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

39.00

ELAPSED TIME (HOURS)

19.50 Task 576117-832-809-001: Ultrasonic Inspection of Center Wing Box Lower Panel Area for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 **CONF 005 Task 576117-839-801-001: Contact and Report to AIRBUS

TOTAL MANHOURS

0.00 Task 576117-832-801-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius For Cracks for LH and RH Sides

TOTAL MANHOURS

33.00

ELAPSED TIME (HOURS)

16.50 Task 576117-832-802-001: Special Detailed Inspection of Frame 40 Lower Outboard Radius for Cracks After Repair for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 Task 576117-832-808-001: Rototest Inspection of Fastener Hole in Area of Rib 1 Triform in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

34.00

ELAPSED TIME (HOURS)

17.00 Task 576117-832-806-001: Rototest Inspection of Fastener Holes in the Front Spar Lower Flange area in the Center Wing Box for LH and RH Sides

TOTAL MANHOURS

39.00

ELAPSED TIME (HOURS)

19.50 Task 576117-832-809-001: Ultrasonic Inspection of Center Wing Box Lower Panel Area for LH and RH Sides

TOTAL MANHOURS

32.00

ELAPSED TIME (HOURS)

16.00 **CONF 006 Task 576117-839-801-001: Contact and Report to AIRBUS

TOTAL MANHOURS

0.50

ELAPSED TIME (HOURS)

0.50 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 7 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY

APPENDICES **CONF ALL Appendix 01 - NTM Task 57-10-36 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 8 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY **CONF 001, 004 B B B

RH SHOWN

LH SYMMETRICAL

FRONT SPAR DATUM RIB1 DATUM FR40 FR47 A FR40 C Z140 A D_SB_576117_5_SAAA_01_00 Figure A-FSAAA - Sheet 01 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 9 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY **CONF 001, 004 C

VIEW LOOKING AFT

RH SHOWN

LH SYMMETRICAL STGR33 STGR32

AREA TO BE INSPECTED

DO A ROTOTEST INSPECTION OF THE HOLE NOTE:

AREA AAREA B

TYPICAL CRACK D_SB_576117_5_SAAA_02_01 Figure A-FSAAA - Sheet 02 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 10 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY **CONF 002 thru 005 B B FR40 FR47 A

RH SHOWN

LH SYMMETRICAL B

RH SHOWN

LH SYMMETRICAL

FRONT SPAR DATUM RIB1 DATUM FR40 C C FR40 Z140 A D E D_SB_576117_5_SBAA_01_00 Figure A-FSBAA - Sheet 01 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 11 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A300-600

SERVICE BULLETIN

SUMMARY **CONF 002 thru 005

VIEW LOOKING FWD

LH SHOWN

RH SYMMETRICAL OUTBD

DO A ROTOTEST INSPECTION OF THE HOLE

FASTENERS NOT AFFECTED NOTE:

H1 H2 H3 H4 H6 H5

VIEW LOOKING DOWN OUTBD H7

AREA TO BE INSPECTED F W D D E

RH SYMMETRICAL

LH SHOWN D_SB_576117_5_SBAA_02_00 Figure A-FSBAA - Sheet 02 DATE: May 28/15 SERVICE BULLETIN No.: A300-57-6117 REVISION No.: 00 - May 28/15 Page: 12 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.