Service bulletin · Airbus

On this page

Copies · 2

Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

Revision 02A340-53-4215 R02 · 333 pages · 2.1 MB

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0111; AD 2018-12-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2018-0111 (document 0006) · AD 2018-12-08

Revision 02SB A340-53-4215_R02 · 333 pages · 2.1 MB

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-9192; AD 2017-07-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2016-9192 (document 0005) · AD 2017-07-07

Manufacturer
Airbus
Type
Service Bulletin
Number
A340-53-4215
Latest revision known
A340-53-4215, Revision 02, dated November 23, 2016

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

ADs that cite it · 3

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 2 proposed ADs.

Text · 333

Revision 02, the newest copy. From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0111; AD 2018-12-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '6a4ec939cf249e35ef5eac2288a5cab5035d5d85677cfcd97a8b1b394f6be4ed'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 53 TITLE: FUSELAGE - CENTER FUSEL AGE - INSPECTION OF FR40 SKIN

PANEL JUNCTION MODIFICATION No.: None This page transmits Revision No.02 of Service Bulletin No.A340-53-4215

ADDITIONAL WORK **CONF ALL No additional work is required by this revision for aircraft inspected by any previous issue.

REASON Revision No. 02 issued to extend the effectivity to include aircraft Post-MOD No. 55792S18775. Those aircraft follow the same maintenance program than aircraft in configuration 003 of this Service Bulletin.

CHANGES The main changes of this revision are:

- Effectivity updated

- Consumable material No. 08BBU9 replaced by consumable material No. 08BAA9

- For Config. 002, typo error corrected in the TASK 534215-833-801-001 Repair (kit 534215A02R02 cannot be used as it has not been delivered)

- Maintenance Planning Document (MPD) references added into Publication Affected

- Minor changes applied.

SUMMARY

REASON/DESCRIPTION/OPERATIONAL

CONSEQUENCES

REASON UPDATED R

MATERIAL PRICE INFORMATION

MATERIAL PRICE INFORMATION TABLE

UPDATED R DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 1 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

EFFECTIVITY

OPERATOR LIST UPDATED R

REFERENCES / REPERCUSSIONS

REFERENCES/REPERCUSSIONS TABLE

UPDATED R

APPENDICES

APPENDICES UPDATED R

PLANNING INFORMATION

EFFECTIVITY

EFFECTIVITY RELATED INFORMATION

UPDATED R Configuration definition CONF 001

CONFIGURATION DEFINITION UPDATED

CONFIGURATION DESCRIPTION UPDATED R CONF 002

CONFIGURATION DEFINITION UPDATED

CONFIGURATION DESCRIPTION UPDATED R CONF 003

CONFIGURATION DEFINITION UPDATED

CONFIGURATION DESCRIPTION UPDATED R Material Effectivity

MATERIAL EFFECTIVITY UPDATED

MATERIAL SET QUANTITY UPDATED R

MATERIAL EFFECTIVITY UPDATED

MATERIAL SET QUANTITY UPDATED R

MATERIAL EFFECTIVITY UPDATED

MATERIAL SET QUANTITY UPDATED R REASON History

HISTORY UPDATED R Objective/Action

OBJECTIVE/ACTION UPDATED R Advantages

ADVANTAGES UPDATED R Operational/Maintenance Consequences

OPERATIONAL/MAINTENANCE CONSEQUENCES

UPDATED R

COMPLIANCE Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R

PUBLICATION AFFECTED

PUBLICATIONS AFFECTED UPDATED R

MATERIAL INFORMATION

MATERIAL - PRICE AND AVAILABILITY Procurement Addresses

PROCUREMENT ADDRESSES UPDATED R Price and Availability

PRICE AND AVAILABILITY UPDATED

MATERIAL PRICE UPDATED R

LIST OF COMPONENTS

LIST OF COMPONENTS UPDATED R

LIST OF MATERIALS - OPERATOR

SUPPLIED Consumable Materials Consumable CMLA01

CONSUMABLE MATERIAL SET UPDATED

CONSUMABLE UPDATED R DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 2 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Components

COMPONENTS UPDATED R

TOOLING Tools

TOOLS UPDATED R

ACCOMPLISHMENT INSTRUCTIONS TASK 534215- 832-801-001-Inspection

TASK SOLUTION UPDATED

CAUTION UPDATED

NOTE UPDATED R Subtask 534215-910-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-910-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-910-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-941-001-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-865-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-110-001-001

SUBTASK SOLUTION UPDATED

CONSUMABLE UPDATED

MATERIAL LIST UPDATED R Subtask 534215-941-001-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-865-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-110-001-001

SUBTASK SOLUTION UPDATED

CONSUMABLE UPDATED

MATERIAL LIST UPDATED R Subtask 534215-941-001-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-865-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-110-001-001

SUBTASK SOLUTION UPDATED

CONSUMABLE UPDATED

MATERIAL LIST UPDATED R Subtask 534215-832-001-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-002-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-003-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-004-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-005-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-008-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-009-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 3 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Subtask 534215-832-010-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-011-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-012-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-015-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-016-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-017-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-018-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-019-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-022-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-023-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-024-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-025-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-026-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-006-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-007-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-013-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 4 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Subtask 534215-832-014-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-020-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-021-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-027-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-028-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-006-002

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-007-002

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-013-002

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-014-002

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-020-002

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-021-002

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-027-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R Subtask 534215-832-028-001

SUBTASK SOLUTION UPDATED

CONFIGURATION UPDATED

FIGURE REFERENCE UPDATED R TASK 534215- 833-801-001-Repair

TASK SOLUTION UPDATED

NOTE UPDATED

WARNING UPDATED

CAUTION UPDATED R Subtask 534215-910-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-910-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-910-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-941-003-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-861-002-001

SUBTASK SOLUTION UPDATED R DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 5 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Subtask 534215-865-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-010-004-001

SUBTASK SOLUTION UPDATED R Subtask 534215-941-003-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-861-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-865-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-010-004-001

SUBTASK SOLUTION UPDATED R Subtask 534215-941-003-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-861-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-865-002-001

SUBTASK SOLUTION UPDATED R Subtask 534215-010-004-001

SUBTASK SOLUTION UPDATED R Subtask 534215-833-006-001

SUBTASK SOLUTION UPDATED R Subtask 534215-833-007-001

SUBTASK SOLUTION UPDATED R Subtask 534215-833-020-001

SUBTASK SOLUTION UPDATED R Subtask 534215-833-021-001

SUBTASK SOLUTION UPDATED R Subtask 534215-833-027-001

SUBTASK SOLUTION UPDATED R Subtask 534215-833-028-001

SUBTASK SOLUTION UPDATED R Subtask 534215-700-001-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-700-001-002

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-700-001-003

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 534215-942-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-942-001-001

SUBTASK SOLUTION UPDATED R Subtask 534215-942-001-001

SUBTASK SOLUTION UPDATED R Fig. A-FFAAA

FIGURE SOLUTION UPDATED R Fig. A-FFAAA Sheet 01

SHEET UPDATED R Fig. A-FFAAA Sheet 02

SHEET UPDATED R Fig. A-FFAAA Sheet 03

SHEET UPDATED R Fig. A-FFAAA Sheet 04

SHEET UPDATED R Fig. A-FFAAA Sheet 05

SHEET UPDATED R Fig. A-FFAAA Sheet 06

SHEET UPDATED R Fig. A-FFAAB

FIGURE SOLUTION UPDATED R Fig. A-FFAAB Sheet 01

SHEET UPDATED R Fig. A-FFAAB Sheet 02

SHEET UPDATED R Fig. A-FRA

FIGURE DELETED FOR APPLICABLE MSN D Appendix 01 - Inspection Report

APPENDIX CONTENT

APPENDIX CONTENT ADDED N Fig. A-FAAAA

FIGURE SOLUTION ADDED N Fig. A-FAAAA Sheet 01

SHEET ADDED N Fig. A-FAAAA Sheet 02

SHEET ADDED N Fig. A-FAAAA Sheet 03

SHEET ADDED N Fig. A-FAAAA Sheet 04

SHEET ADDED N DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 6 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Fig. A-FAAAA Sheet 05

SHEET ADDED N Fig. A-FAAAA Sheet 06

SHEET ADDED N Fig. A-FAAAA Sheet 07

SHEET ADDED N Fig. A-FAAAA Sheet 08

SHEET ADDED N Fig. A-FAAAB

FIGURE SOLUTION ADDED N Fig. A-FAAAB Sheet 01

SHEET ADDED N Fig. A-FAAAB Sheet 02

SHEET ADDED N Fig. A-FAAAB Sheet 03

SHEET ADDED N Fig. A-FAAAB Sheet 04

SHEET ADDED N Fig. A-FAAAB Sheet 05

SHEET ADDED N Fig. A-FAAAB Sheet 06

SHEET ADDED N Fig. A-FAAAB Sheet 07

SHEET ADDED N Fig. A-FAAAB Sheet 08

SHEET ADDED N Fig. A-FAAAC

FIGURE SOLUTION ADDED N Fig. A-FAAAC Sheet 01

SHEET ADDED N Fig. A-FAAAC Sheet 02

SHEET ADDED N Fig. A-FAAAC Sheet 03

SHEET ADDED N Fig. A-FAAAC Sheet 04

SHEET ADDED N Fig. A-FAAAC Sheet 05

SHEET ADDED N Fig. A-FAAAC Sheet 06

SHEET ADDED N Fig. A-FAAAC Sheet 07

SHEET ADDED N Fig. A-FAAAC Sheet 08

SHEET ADDED N

FILING INSTRUCTIONS This Service Bulletin has been generated electronically and is reissued as a complete document.

Replace the complete document.

Put this Revision Transmittal Sheet in front of the Service Bulletin.

HISTORY OF PREVIOUS REVISIONS Revision No. 01 issued to modify for Config. 002 and Config. 003 the fasteners installed at holes H341 and H342, and for Config. 001, Config. 002 and Config. 003 the fasteners installed at hole H348.

REVISION SEQUENCE ORIGINAL: Jun 21/13 REVISION No. : 01 - Apr 17/14 REVISION No. : 02 - Nov 23/16 DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 7 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET This Page Intentionally Left Blank DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 8 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

SUMMARY AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1 This summary is for information only and is not approved for modification of the aircraft.

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 53 TITLE: FUSELAGE - CENTER FUSEL AGE - INSPECTION OF FR40 SKIN

PANEL JUNCTION **CONF ALL

MODIFICATIONS None

REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES This Inspection Service Bulletin (ISB) originates from the high rate of findings at F r a m e4 0o nt h el o w e r shell panel junction, around stringer (STGR) 38 level, LH/RH side, in configuration A340 aircraft Premodifications No.

44360S13013 and No.

44360S13482.

This ISB mandates the High Frequency Eddy Current (HFEC) rototest inspection of 10 fastener holes at Frame 40 lower shell panel junction, STGR38 to STGR41, LH and RH side for all aircraft Postmodifications No.

44360S13013 and No.

44360S13482.

For aircraft previously inspected once thru Technical Disposition (TD) Ref. LR57D11023360, next inspection is due based on interval value given in this ISB.

Accomplishment of this ISB will permit early detection of cracks on the Frame 40 lower shell panel junction, LH and RH side at the level of STGR38 to STGR41 and will ensure that the structural integrity of the area is maintained.

The Operational/Maintenance Consequences of this Service Bulletin are covered by the update of the affected publications detailed in ’PLANNING INFORMATION’.

GENERAL EVALUATION

EVALUATION TABLE

COMPLIANCE MANDATORY (1)

CANCELS INSPECTION SB NO

POTENTIAL AD YES

A/C OPERATION AFFECTED NO

RELIABILITY AFFECTED NO

PAX COMFORT AFFECTED NO

COST SAVING NO

LROPS AFFECTED NO

STRUCTURAL LIFE EXTN NO

VENDOR SB INVOLVED NO DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 1 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

SUMMARY NOTE

(1) : Service Bulletin must be accomplished.

MATERIAL PRICE INFORMATION **CONF 001

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 534215A01R03 2 4,040.00 Screws, Washers, Nuts Supplementary kit 534215A01S01 2

171.80 Screws TOTAL 4,211.80 **CONF 002

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 534215A02R03 2 3,880.00 Screws, Washers, Nuts Supplementary kit 534215A02S01 2

676.00 Screws, Washers, Nuts Supplementary kit 534215A02S02 2

171.80 Screws TOTAL 4,727.80 **CONF 003

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Kit 534215A03R03 2 3,880.00 Screws, Washers, Nuts

EFFECTIVITY **CONF ALL This Service Bulletin is applicable to this (these) operator(s) :

09M 83V

ABD ACA

AFR AIB ALD

ARG AXY BEK BOE

CAL CPA

DLH EDW F2I

FIN GAF HFM

HFY IBE IRM

MAU MDG MRJ PAL PUE QQE ROI S3R SAA SAS SLM SVW

SWR THT THY UAE

CONCURRENT REQUIREMENTS None

REFERENCES / REPERCUSSIONS TFU

53.30.00.003 OEB None DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 2 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

SUMMARY AOT None SIL None ISI None

LINE MAINTENANCE AFFECTED No

LIFE LIMIT None OTHER OIT 999.0082/12

NATURE OF THE WORK

AIRCRAFT YES

EQUIPMENT NO HARD NO SOFT NO OBRM NO

MANPOWER **CONF 001 Task 534215-832-801-001: Inspection

TOTAL MANHOURS

42.00

ELAPSED TIME (HOURS)

21.00 Task 534215-833-801-001: Repair

TOTAL MANHOURS

46.00

ELAPSED TIME (HOURS)

23.00 **CONF 002 Task 534215-832-801-001: Inspection

TOTAL MANHOURS

42.00

ELAPSED TIME (HOURS)

21.00 Task 534215-833-801-001: Repair

TOTAL MANHOURS

46.00

ELAPSED TIME (HOURS)

23.00 **CONF 003 Task 534215-832-801-001: Inspection

TOTAL MANHOURS

42.00

ELAPSED TIME (HOURS)

21.00 Task 534215-833-801-001: Repair

TOTAL MANHOURS

46.00

ELAPSED TIME (HOURS)

23.00 DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 3 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A340

SERVICE BULLETIN

SUMMARY

APPENDICES **CONF ALL Appendix 01 - Inspection Report DATE: Jun 21/13 SERVICE BULLETIN No.: A340-53-4215 REVISION No.: 02 - Nov 23/16 Page: 4 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.