Other document · Airbus

No revision namedA24R009-20 R00 with Appx 1 and 2 · 13 pages · 219 KB

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0547, the docket of AD 2021-21-02. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0547 (document 0008) · AD 2021-21-02

Manufacturer
Airbus
Type
All Operators Transmission
Number
A24R009-20

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

Also cited in 1 proposed AD.

Text · 13

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0547, the docket of AD 2021-21-02. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'da77f457011660d09291ded6770ce3405704ba32dd7221cc07a5be045d3459ad'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

CUSTOMER SERVICES DIRECTORATE 2 ROND POINT EMILE DEWOITINE 31700 BLAGNAC FRANCE TELEPHONE + 33 (0)5 61 93 33 33

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A24R009-20 Rev 00 Page 1 of 6 Date: 23-SEP-2020 © AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT SUBJECT: ATA 24 – Ni-Cd Batteries - Risk of capacity reduction during aircraft parking AIRCRAFT TYPE: A380 OUR REF.: A24R009-20 Rev 00 dated 23-SEP-2020 EFFECTIVITY DATE: 23-SEP-2020

1. AIRCRAFT AFFECTED All Aircraft

2. REFERENCED DOCUMENTATION

2.1 APPENDIX Appendix 1: Short term action

Appendix 2: On-wing battery preservation procedure

2.2 REFERENCES Ref 1: ISI 24.00.00046 (ATA 24 - Recommendations for parking & storage during COVID19 period) Ref 2: Task in AMM PB 10-10-00 (Parking and storage procedure) Ref 3: Task in AMM PB 10-11-00 (Parking periodic ground checks) Ref 4: Task in AMM PB 10-30-00 (Return to operation after a parking period) Ref 5: Task in AMM PB 24-38-51, 24-38-52 & 24-38-41 (Removal of the battery) Ref 6: Task in AMM PB 24-38-51, 24-38-52 & 24-38-41 (Installation of the battery) Ref 7: Task in AMM PB 31-21-00 (Setting of the clock) Ref 8: Task in AMM PB 24-41-00 (Energize the aircraft electrical circuits) Ref 9: Task in AMM PB 24-41-00 (De-energize the aircraft electrical circuits) Ref 10: Task in AMM PB 24-42-00 (Energize the ground service network) Ref 11: Task in AMM PB 24-42-00 (De-Energize the ground service network) Ref 12: SAFT Battery CMM 24-38-55 (Battery PN 505CH2)

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A24R009-20 Rev 00 Page 2 of 6 Date: 23-SEP-2020 © AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

3. REASON The purpose of this AOT is to inform the operators:

that the capacity of the batteries (FINs 3PB1, 3PB2, 3PB3 and 3PB4) may be reduced due to repetitive disconnections and connections during an aircraft parking period, as detailed in § 3.1 and § 4.2.1 of this AOT and of the need of restoring the capacity of these batteries per ref 12, within a defined time frame.

3.1 FACTS In the frame of massive aircraft grounding due to COVID-19 pandemic, several engineering reviews have been organised between Airbus and the battery supplier SAFT. During these reviews, it was highlighted that the current AMM aircraft parking procedures (per ref 2 & ref 3) requiring physical disconnection and periodic reconnection of batteries may induce a reduction in capacity for Ni-Cd batteries, when repetitively done.

The current AMM Aircraft Parking Procedures require:

to disconnect the batteries when the aircraft is parked and de-energized for more than 2 days (per ref 2).

to reconnect the batteries when aircraft is energized during aircraft periodic ground checks (per ref 3).

to disconnect the batteries again at the end of the aircraft periodic ground check (per ref 3).

When a Ni-Cd battery is physically disconnected from the aircraft loads, it self-discharges, due to an electrochemical phenomenon, thus, inducing a reduction of battery capacity.

After each cycle of battery self-discharge, the available battery capacity will decrease progressively and will not be recovered to 100% of its initial capacity even when the battery is charged again from the aircraft electrical network during the periodic ground checks per ref 3.

In order to restore the battery capacity, the battery must be sent to an approved battery shop for a periodical check or a battery regular check or a battery general overhaul per ref 12.

Note 1: This action in shop includes a battery charge at constant current which allows to restore the battery capacity.

Note 2: On aircraft, it is not possible to:

restore the battery capacity as the battery is charged at constant voltage.

check the battery capacity.

3.2 CONSEQUENCES As the battery capacity may be significantly reduced, the battery performance may be affected and hence, the battery functions may be not fully guaranteed.

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A24R009-20 Rev 00 Page 3 of 6 Date: 23-SEP-2020 © AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

4. SHORT TERM ACTION NOTE: This AOT is classified mandatory or expected to be classified mandatory by an Airworthiness Directive (AD). The accomplishment instructions marked as Required for Compliance (RC) must be done to comply with the AD. “RC” is indicating these paragraphs accordingly. If an AD is issued, reference should be made to the AD for the mandated accomplishment timescale.

NOTE: The accomplishment instructions of this AOT include procedures given in other documents or in other sections of the AOT. When the words ’refer to’ are used and the operator has a procedure accepted by the local authority he belongs to, the accepted alternative procedure can be used. When the words ’in accordance with’ are used then the given procedure must be followed.

NOTE: The access and close-up instructions, not comprising return to service tests, in this AOT do not constitute or affect the technical intent of the AOT. Operators can therefore, as deemed necessary, omit or add access and/or close-up steps to add flexibility to their maintenance operations as long as the technical intent of the AOT is met within the set parameters.

4.1 PLANNING AND MANPOWER

4.1.1 ACCOMPLISHMENT TIMESCALE (RC) The compliance time for this AOT is defined as follows:

Within 6 months after the AOT effective date or prior to next flight, whichever occurs latest.

For additional information, refer to appendix 1 of this AOT.

4.1.2 MANPOWER N/A

4.2 DESCRIPTION

4.2.1 APPLICABILITY Group A This AOT is applicable to Ni-Cd batteries (PN 505CH2) which have been disconnected, kept (on aircraft) and reconnected on aircraft per ref 2 and ref 3 more than 4 times during an aircraft parking period since last battery periodical check, battery regular check or battery general overhaul per ref 12, and which are still installed on aircraft, at the effectivity date of this AOT.

Refer to § 4.2.2 and § 4.2.3.1 of this AOT for the accomplishment of the required actions.

Group B This AOT is also applicable to all other Ni-Cd batteries (PN 505CH2) not identified in group A.

Refer to § 4.2.3.2 of this AOT for the accomplishment of the required actions.

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A24R009-20 Rev 00 Page 4 of 6 Date: 23-SEP-2020 © AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

4.2.2 TERMINATING ACTIONS (RC) The restoration of the capacity of the batteries, identified in group A in § 4.2.1 of this AOT, is the terminating action for this AOT and is defined as follows:

- Do a battery periodical check or a battery regular check or a battery general overhaul per ref 12 in an approved battery shop.

Note: This action in shop includes a battery charge at constant current allowing to restore the battery capacity.

4.2.3 APPLICATION OF NEW AMM PROCEDURES (RC) In order to preserve batteries, when the aircraft is parked and de-energized for more than 2 days, the AMM will be revised to introduce, as detailed in § 5.2 of this AOT, the off-wing battery preservation or the on-wing battery preservation.

4.2.3.1. For batteries identified in group A in § 4.2.1 of this AOT and installed on aircraft After the terminating action, as detailed in § 4.2.2 of this AOT, is completed, the off-wing battery preservation or the on-wing battery preservation, as detailed in § 5.2 of this AOT, must be applied when the aircraft is parked and de-energized for more than 2 days.

From the effectivity date of this AOT, operators can start applying the off-wing battery preservation or the on-wing battery preservation when the aircraft is parked and de-energized more than 2 days.

However, it is recommended that the battery capacity restoration, as detailed in § 4.2.2 of this AOT, is performed before the application of the on-wing battery preservation.

Note 1: A battery, affected by the issue detailed in § 3.1 of this AOT, cannot be restored through the application of the on-wing battery preservation.

Note 2: If the on-wing preservation procedure is applied for batteries with a reduced capacity, there is a risk that these batteries are over discharged before the aircraft is energized again per ref 3. This situation may prevent the battery from being recharged on aircraft.

4.2.3.2 For batteries identified in group B in § 4.2.1 of this AOT and installed on aircraft After effectivity date of this AOT, the off-wing battery preservation or the on-wing battery preservation, as detailed in § 5.2 of this AOT, must be applied when the aircraft is parked and de-energized more than 2 days.

4.2.4 ACCESS N/A

4.2.5 INSPECTION REQUIREMENTS N/A

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A24R009-20 Rev 00 Page 5 of 6 Date: 23-SEP-2020 © AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

4.2.6 FINDINGS N/A

4.3 SPARES AND TOOLING N/A

5. FURTHER INFORMATION

5.1 FOLLOW-UP PLAN A webinar will be organized within two weeks after the publication of this AOT to answer all questions pertaining to this AOT.

Additional information related to this AOT (for instance, frequently asked questions, complementary recommendations if any) will be provided through ref 1.

5.2 IMPACTED DOCUMENTATION The AMM will be revised (currently planned for JAN-2021) to introduce, as detailed below, the off-wing battery preservation or the on-wing battery preservation. The availability of the AMM advance copies is currently planned for 26-NOV-2020.

A - Off Wing Battery Preservation If the aircraft is parked and de-energized more than 2 days, the batteries have to be disconnected and removed from aircraft per ref 5.

Note 1: To allow ground periodic checks per ref 3 during an aircraft parking period, batteries must be re-installed on aircraft and re-connected to the aircraft electrical network Note 2: Batteries removed from aircraft in parking or storage have to be stored per ref 12.

B - On-Wing Battery Preservation The on-wing battery preservation is a new procedure consisting in leaving the battery physically connected to the aircraft electrical network and keeping a minimum battery hot bus consumption, when the aircraft is parked and de-energized more than 2 days. This is achieved by pulling the circuit breakers of some loads supplied by the battery hot buses, as detailed in the appendix 2 of this AOT. In this configuration, there is no battery self-discharge, and hence the progressive and permanent reduction of the capacity of the batteries is avoided.

When the on-wing preservation procedure is applied, batteries must be sent to an approved battery shop for a battery regular check per ref 12, every six months during the aircraft parking period.

6. AOT APPROVAL The technical content of this document is approved under the authority of the DOA ref.EASA.21J.031.

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A24R009-20 Rev 00 Page 6 of 6 Date: 23-SEP-2020 © AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

7. REPORTING Questions about this AOT are to be addressed to Airbus Customer Services through TechRequest on Airbus World, selecting Maintenance Engineering Domain, Engineering Support Section and ATA 24-

38.

As per latest reporting policy (Ref to OIT 999.0018/16), inspection results (with or without findings) are to be addressed to Airbus Customer Services through the generic e-mail address: inspection.results@airbus.com.

Best Regards, Christian FREMONT

VICE PRESIDENT ENGINEERING SUPPORT

CUSTOMER SERVICES Jean-Luc MOUYSSET VICE PRESIDENT A380 PROGRAMME

CUSTOMER SERVICES

Appendix 1 : Short Term Action

Figure 1

Examples as

per Figure 1

AOT

Applicability

Terminating action needed?

When?

Application of new AMM procedures

needed, if aircraft is parked again or remain

in parking?

Example 1

Group A

Yes

T ​ CT ​ , at the latest

Recommended before AOT terminating action

Required after AOT terminating action

Example 2 Group A

Yes

T ​ CT ​ , at the latest

Recommended before AOT terminating action

Required after AOT terminating action

Example 3

Group A

Yes

Prior to next flight

Recommended before AOT terminating action

Required after AOT terminating action

Example 1

Group B

No

Required after AOT effectivity date

Example 2

Group B

No

Required after AOT effectivity date

Example 3 Group B

No

Required after AOT effectivity date

AOT ref:

​ A24R009-20 Rev 00

Page 1 of 1

Date:

​ 23-SEP-2020

Appendix 2 : On-wing battery preservation procedure

CAUTION ​ :

If on-wing battery preservation procedure is applied, during parking period, Battery APU

must not be swapped with another position or with another aircraft.

The procedures per ref 2, ref 3 and ref 4 are modified to include the instructions for the on-wing

battery preservation, as detailed below:

A/ The parking and storage procedure (ref 2) is modified as follows:

● Perform all steps from step 3.A.(1) to step 4.T.(1) of ref 2.

● If the parking period is more than 2 days, ​ perform the following steps instead of step

4.T.(2) of ref

2 :

(1) In the cockpit, on ELEC section of panel 1225VM, release the pushbutton switches of BAT

1(2)(APU)(ESS).

(2) In the cockpit, on ELEC section of panel 1225VM, check the voltage of the BAT

1(2)(APU)(ESS):

(a) If one of the battery voltages is less than 26V, perform a cycle of battery charge as

follows:

○ On the ECAM control panel:

- Push the ELEC DC key to get the ELEC DC system page.

○ On ELEC section of panel 1225VM:

- Push the related BAT 1(2)(APU)(ESS) pushbutton switch (OFF and FAULT

legends off) to start the charging cycle of the battery 1(2)(APU)(ESS).

○ On the lower ECAM DU, wait until the current value shown on the "ELEC DC" page is

less than 1 A to charge the battery.

Note:

​ The time for the battery to charge can be approximately 30 minutes.

(b) Otherwise, push the BAT 1(2)(APU)(ESS) pushbutton switches.

● Perform all steps from step 4.T.(3) to step 4.T.(4) of ref 2.

● If the parking period is more than 2 days, ​

​ perform the following steps after step 4.T.(4) of ref 2:

(1) Energize the ground service network from the external power per ref 10.

Note:

​ This step is necessary only to have light in the avionic bay and in the cockpit.

​ If a torch

is used to perform steps (2) to (4) below, step (1) above can be disregarded.

(2) In the cockpit, on ELEC section of panel 1225VM, put the

WARNING

NOTICE(S) in position

“Do not to operate the batteries”.

AOT ref:

​ A24R009-20 Rev 00

Page 1 of 6

Date:

​ 23-SEP-2020

(3) Immediately open, safety and tag these circuit breakers after the aircraft is de-energized :

Panel

Designation

FIN

Location

2500VU

C/B-ELEC RAT SOL 1 SPLY

13XE

2149

2500VU

C/B-ELEC RAT SOL 2 SPLY

14XE

2049

2500VU

C/B-A/C ON GND INDIC IRDC

50XR

2047 (or 0849)

2500VU

C/B-EBCU BAT SPLY

25GY

2061

2500VU

C/B-ADIRU 3 28VDC BKUP

42FP

2055

2500VU

C/B-CLOCK TBU

4FS

2165

(4) On the overhead panel (1225VM), put the Battery ​ ESS/APU/OFF/1/2 switch in the BAT2

position.

(5) De-energize the ground service network from the external power per ref 11.

Note:

​ If a torch has been used to perform steps

(2) to

(4) above, step

(5) above can be

disregarded.

● Perform all steps from step 4.T.(5) to step 5.B.(2) of ref 2.

AOT ref:

​ A24R009-20 Rev 00

Page 2 of 6

Date:

​ 23-SEP-2020

B/ The parking periodic ground checks procedure (ref 3) is modified as

follows:

● Perform all steps from step 3.A.(1) to step 3.B.(3).(a) of ref 3.

● If the parking period is more than 2 days, ​

​ perform the following steps after step 3.B.(3).(a) of ref 3:

(1) Energize the ground service network from the external power per ref 10.

Note:

​ This step is necessary only to have light in the avionic bay and in the cockpit.

​ If a torch

is used to perform steps (2) to (4) below, step (1) above can be disregarded.

(2) Remove safety clips and tags and close these circuit breakers:

Panel

Designation

FIN

Location

2500VU

C/B-ELEC RAT SOL 1 SPLY

13XE

2149

2500VU

C/B-ELEC RAT SOL 2 SPLY

14XE

2049

2500VU

C/B-A/C ON GND INDIC IRDC

50XR

2047 (or 0849)

2500VU

C/B-EBCU BAT SPLY

25GY

2061

2500VU

C/B-ADIRU 3 28VDC BKUP

42FP

2055

2500VU

C/B-CLOCK TBU

4FS

2165

(3) In the cockpit, on ELEC section of panel 1225VM, remove the

WARNING

NOTICE(S) in

position “Do not to operate the batteries”.

(4) De-energize the ground service network from the external power per ref 11.

Note:

​ If a torch has been used to perform steps (2) to (4) above, step (4) can be disregarded.

(5) Adjust the clock per ref 7.

● Perform all steps from step 3.B.(3).(b) to step 3.B.(3).(d) of ref 3.

● Do not perform step 3.B.(3).(e) of ref 3.

● Perform all steps from step 3.C.(1) to step 4.M.(2) of ref 3.

● If the parking period is more than 2 days, ​ perform the following steps instead of step

4.M.(3) of ref

3:

(1) In the cockpit, on ELEC section of panel 1225VM, release the pushbutton switches of BAT

1(2)(APU)(ESS).

(2) In the cockpit, on ELEC section of panel 1225VM, check the voltage of the BAT

1(2)(APU)(ESS):

(a) If one of the battery voltages is less than 26V, perform a cycle of battery charge as

follows:

AOT ref:

​ A24R009-20 Rev 00

Page 3 of 6

Date:

​ 23-SEP-2020

○ On the ECAM control panel:

- Push the ELEC DC key to get the ELEC DC system page.

○ On ELEC section of panel 1225VM:

- Push the related BAT 1(2)(APU)(ESS) pushbutton switch (OFF and FAULT

legends off) to start the charging cycle of the battery 1(2)(APU)(ESS).

○ On the lower ECAM DU, wait until the current value shown on the "ELEC DC" page is

less than 1 A to charge the battery.

Note:

​ The time for the battery to charge can be approximately 30 minutes.

(b) Otherwise, push the BAT 1(2)(APU)(ESS) pushbutton switches.

● Perform step 4.M.(4) of ref 3.

● If the parking period is more than 2 days, ​

​ perform the following steps after step 4.M.(4) of ref 3 :

(1) Energize the ground service network from the external power per ref 10.

Note:

​ This step is necessary only to have light in the avionic bay and in the cockpit.

​ If a torch

is used to perform steps (2) to (4) below, step (1) above can be disregarded.

(2) In the cockpit, on ELEC section of panel 1225VM, put the

WARNING

NOTICE(S) in position

“Do not to operate the batteries”.

(3) Immediately open, safety and tag these circuit breakers after the aircraft is de-energized :

Panel

Designation

FIN

Location

2500VU

C/B-ELEC RAT SOL 1 SPLY

13XE

2149

2500VU

C/B-ELEC RAT SOL 2 SPLY

14XE

2049

2500VU

C/B-A/C ON GND INDIC IRDC

50XR

2047 (or 0849)

2500VU

C/B-EBCU BAT SPLY

25GY

2061

2500VU

C/B-ADIRU 3 28VDC BKUP

42FP

2055

2500VU

C/B-CLOCK TBU

4FS

2165

(4) On the overhead panel (1225VM), put the Battery ​ ESS/APU/OFF/1/2 switch in the BAT 2

position (if not already done).

(5) De-energize the ground service network from the external power per ref 11.

Note:

​ If a torch has been used to perform steps

(2) to

(4) above, step

(5) above can be

disregarded.

● Perform all steps from step 4.M.(5) to step 5.A.(6) of ref 3.

AOT ref:

​ A24R009-20 Rev 00

Page 4 of 6

Date:

​ 23-SEP-2020

C/ The return to operation after a parking period procedure (ref

4) is modified

as follows:

● Perform all the steps from 3.A.(1) to 3.B of ref 4.

● If the parking period is more than 2 days, ​

​ perform the following steps after step 3.B of ref 4 :

(1) Disconnect and remove APU Battery (3PB4) per ref 5.

(2) Install and connect serviceable APU battery (3PB4) per ref 6.

Note ​ :

In case of a non-revenue flight (per ref

3), the replacement of the APU Battery (3PB4)

can be disregarded.

● Perform the steps 3.C.(1).(a) and 3.C.(1).(b) of ref 4.

● If the parking period is more than 2 days, ​

​ perform the following steps after step 3.C.(1).(b) of ref 4 :

(1) Energize the ground service network from the external power per ref 10.

Note:

​ This step is necessary only to have light in the avionic bay and in the cockpit.

​ If a torch

is used to perform steps (2) to (4) below, step (1) can be disregarded.

(2) Remove safety clips and tags and close these circuit breakers:

Panel

Designation

FIN

Location

2500VU

C/B-ELEC RAT SOL 1 SPLY

13XE

2149

2500VU

C/B-ELEC RAT SOL 2 SPLY

14XE

2049

2500VU

C/B-A/C ON GND INDIC IRDC

50XR

2047 (or 0849)

2500VU

C/B-EBCU BAT SPLY

25GY

2061

2500VU

C/B-ADIRU 3 28VDC BKUP

42FP

2055

2500VU

C/B-CLOCK TBU

4FS

2165

(3) In the cockpit, on ELEC section of panel 1225VM, remove the

WARNING

NOTICE(S) in

position “Do not to operate the batteries”.

(4) De-energize the ground service network from the external power per ref 11.

Note:

​ If a torch has been used to perform steps (2) to (4) above, step (4) can be disregarded.

(5) Adjust the clock per ref 7.

● Perform step 3.C.(2) per of 4.

● If the parking period is more than 2 days, ​

​ perform the following steps instead step 3.C.(3) of ref 4:

AOT ref:

​ A24R009-20 Rev 00

Page 5 of 6

Date:

​ 23-SEP-2020