Other document · Airbus

No revision namedAOT_A57P016-21_r00 · 11 pages · 1.1 MB

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0657, the docket of AD 2022-03-10. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0657 (document 0006) · AD 2022-03-10

Manufacturer
Airbus
Type
All Operators Transmission
Number
A57P016-21

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Text · 11Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0657, the docket of AD 2022-03-10. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '2fb9d142a4b1fbe7d8ea6b65c0364235423f0db24e82cfd138a3c38111be56cc'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

CUSTOMER SERVICES DIRECTORATE 2 ROND POINT EMILE DEWOITINE 31700 BLAGNAC FRANCE TELEPHONE + 33 (0)5 61 93 33 33

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 1 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT SUBJECT: ATA 57 – Inspection of Main Landing Gear Support Structure Fuse Pins AIRCRAFT TYPE: A350 OUR REF.: A57P016-21 Rev 00 dated 01-APR-2021 EFFECTIVITY DATE: 8 April 2021.

1. AIRCRAFT AFFECTED All A/C listed below:

MODEL MSN A350-900 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, 0023, 0024, 0026, 0027, 0028, 0029, 0030, 0031, 0034, 0035, 0037, 0040, 0080, 0081, 0082, 0083, 0084, 0085, 0086, 0087, 0089, 0090, 0091, 0092, 0093, 0094, 0095, 0096, 0097, 0098, 0099, 0100, 0101, 0103, 0104, 0105, 0106, 0107, 0109, 0111, 0112, 0113, 0114, 0115, 0116, 0117, 0119, 0120, 0121, 0122, 0123, 0124, 0126, 0127, 0128, 0129, 0130, 0132, 0133, 0134, 0135, 0136, 0137, 0138, 0140, 0142, 0143, 0144, 0145, 0146, 0147, 0148, 0149, 0150, 0151, 0153, 0154, 0155, 0157, 0158, 0159, 0160, 0162, 0163, 0164, 0165, 0167, 0168, 0170, 0172, 0173, 0174, 0175, 0176, 0177, 0178, 0179, 0180, 0181, 0182, 0183, 0184, 0185, 0186, 0187, 0189, 0190, 0191, 0192, 0193, 0195, 0196, 0197, 0198, 0199, 0200, 0201, 0202, 0203, 0204, 0205, 0207, 0208, 0209, 0210, 0211, 0212, 0213, 0214, 0216, 0217, 0218, 0219, 0220, 0221, 0223, 0224, 0226, 0227, 0228, 0230, 0231, 0232, 0234, 0235, 0236, 0237, 0238, 0239, 0240, 0243, 0244, 0245, 0246, 0247, 0248, 0249, 0250, 0251, 0254, 0255, 0256, 0257, 0259, 0260, 0261, 0263, 0264, 0265, 0267, 0268, 0269, 0271, 0272, 0273, 0276, 0277, 0278, 0279, 0280, 0281, 0282, 0284, 0287, 0289, 0291, 0292, 0293, 0294, 0295, 0297, 0299, 0300, 0301, 0302, 0303, 0305, 0307, 0309, 0310, 0311, 0312, 0313, 0314, 0316, 0318, 0320, 0321, 0322, 0324, 0325, 0327, 0328, 0329, 0331, 0333, 0334, 0335, 0337, 0339, 0341, 0343, 0344, 0345, 0347, 0348, 0349, 0351, 0352, 0354, 0355, 0357, 0358, 0359, 0363, 0364, 0365, 0366, 0369, 0370, 0371, 0373, 0375, 0376, 0378, 0379, 0381, 0383, 0385, 0387, 0389, 0390, 0391, 0392, 0394, 0395, 0396, 0397, 0398, 0400, 0401, 0403, 0404, 0405, 0406, 0407, 0408, 0410, 0411, 0412, 0413, 0416, 0418, 0419, 0421, 0422, 0425, 0427, 0431, 0433, 0436, 0439, 0443, 0445, 0447, 0451, 0455, 0458, 0468, 0476 A350-1000 0088, 0102, 0110, 0118, 0125, 0141, 0161, 0169, 0188, 0206, 0215, 0225, 0229, 0233, 0241, 0252, 0258, 0262, 0266, 0274, 0286, 0290, 0296, 0298, 0306, 0315, 0319, 0326, 0330, 0332, 0336, 0340, 0342, 0346, 0350, 0356, 0362, 0368, 0372, 0374, 0380, 0382, 0386, 0388, 0399, 0402, 0415, 0420, 0426, 0432, 0446

2. REFERENCED DOCUMENTATION

2.1 APPENDIX Appendix 1: Inspection Flow Chart Appendix 2: Inspection Report Form

2.2 REFERENCES [1] A350 IPD 57-26-63-02 – ATTACHMENT INSTL MLG [2] Repair Instruction for A350-900: R57V-40112 (Removal and Replacement of Fuse Pins, MLG FWD Pintle Assembly, Both Wings)

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 2 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT [3] Repair Instruction for A350-1000: R57V-40113 (Removal and Replacement of Fuse Pins, MLG FWD Pintle Assembly, Both Wings) [4] MP Task A350-A-32-12-XX-00ZZZ-397Z-A – Open the MLG Doors for Maintenance [5] NDT A350-A-51-99-XX-01001-040A-A – Visual

3. REASON

3.1 FACTS During maintenance inspection, an operator reported that one of the Fuse Pins retaining the Main Landing Gear Support Structure (MLGSS) was not correctly engaged in the Trunnion Block and not correctly secured with the associated Retaining Pin.

A mis-installation of Fuse Pins at MLGSS Forward Pintle was identified as the root cause of such finding.

The Trunnion Block installed in the Forward Pintle fitting ensures the connection between the Main Landing Gear (MLG) and the Wing Rear Spar.

The Trunnion Block is secured by 4 (four) Fuse Pins and the Fuse Pin Carrier is secured by 2 (two) Fuse Pins in accordance with Ref [1].

All Fuse Pins are locked by Retaining Pins to prevent rotation and migration.

A/C not listed in §1 were already inspected and cleared in production.

For these A/C the Fuse Pins were correctly engaged and secured with associated Retaining Pins.

C D B A350-900 shown, A350-1000 similar Figure 1 – Details of affected area

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 3 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT C Fuse Pin Fuse Pin Fuse Pin E D Fuse Pin Figure 2 – Fuse Pins at Trunnion Block Assembly Fuse Pin Fuse PinE Figure 3 – Fuse Pins at Fuse Pin Carrier Assembly

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 4 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT Retaining Pin E Figure 4 – Retaining Pin installation

3.2 CONSEQUENCES The Fuse Pin is categorised as Principal Structure Element (PSE).

If a Fuse Pin is not correctly engaged and secured by the Retaining Pin, migration of the Fuse Pin may occur. In the worst case, it could lead to the loss of the Fuse Pin.

If no corrective action is performed, this could lead to a MLG collapse under standard operations.

3.3 AIM The aim of this AOT is to provide instructions for a one-time inspection of the 6 (six) Fuse Pins installed at MLGSS Trunnion Block and Fuse Pin Carrier.

This one-time inspection will check the installation to ensure the complete set of the 6 (six) Fuse Pins are correctly engaged and secured with their Retaining Pins.

4. SHORT TERM ACTION NOTE: This AOT is classified mandatory or expected to be classified mandatory by an Airworthiness Directive (AD). The accomplishment instructions marked as Required for Compliance (RC) must be done to comply with the AD. “RC” is indicating these paragraphs accordingly.

NOTE: The accomplishment instructions of this AOT include procedures given in other documents or in other sections of the AOT. When the words ’refer to’ are used and the operator has a procedure accepted by the local authority he belongs to, the accepted alternative procedure can be used. When the words ’in accordance with’ are used then the given procedure must be followed.

NOTE: The access and close-up instructions, not comprising return to service tests, in this AOT do not constitute or affect the technical intent of the AOT. Operators can therefore, as deemed necessary, omit or add access and/or close-up steps to add flexibility to their maintenance operations as long as the technical intent of the AOT is met within the set parameters.

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 5 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

4.1 PLANNING AND MANPOWER NOTE:

Airbus recommend to perform the instructions mentioned in this AOT in a suitable location with appropriate maintenance facilities.

Indeed, in case of finding such as one Fuse Pin not correctly installed, repair instructions might require aircraft jacking in accordance with Ref [2] or Ref [3], depending of A/C type A350-900 or A350-1000.

On a case by case basis, if the reported finding cannot be repaired at the aircraft location, Airbus shall be contacted to review if a repositioning flight can be granted.

However, in case of more than one Fuse Pin reported not correctly installed, then Airbus won’t be in position to grant such repositioning flight.

4.1.1 ACCOMPLISHMENT TIMESCALE – (RC) The inspection as described in paragraphs 4.2.2 and 4.2.3 must be completed within 6 months or 500 Flight Cycles (FC) whichever occurs first from the effective issuance date of this AOT.

4.1.2 MANPOWER The estimated time to perform the inspection defined in paragraph 4.2.2 is 1 Man Hour per A/C if no findings.

The inspection can be performed by one person.

The estimated time to perform the corrective action defined in paragraph 4.2.3 is 24 Man Hours per A/C for one side and 30 Man Hours per A/C for both sides.

4.2 DESCRIPTION

4.2.1 ACCESS Use a standard platform or cherry picker to get access to the inspection area close to the wing MLG Forward Pintle Pin Trunnion assembly.

Open the MLG Doors for access, in accordance with Ref [4].

Put the WARNING NOTICE(S) in position adjacent to the landing-gear control lever to tell persons not to operate the landing gear.

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 6 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

4.2.2 INSPECTION REQUIREMENTS – (RC) On the Left Hand (LH) and the Right Hand (RH) wing:

Perform a Visual Inspection in accordance with Ref [5] of the 6 (six) Fuse Pins and associated Retaining Pins shown in figures 2, 3, 4 to confirm the Fuse Pins are correctly installed.

“Correctly installed” is defined as: Fuse Pin secured by the Retaining Pin (Refer to Fig. 5 and Fig. 6).

Any suitable tools may be used to complete this inspection (i.e. Light, inspection mirror).

I. If the 6 (six) Fuse Pins are correctly installed, no further action is required from this AOT.

Fuse Pin engaged and secured with Retaining Pin Note: Fuse Pin head mark can be at 12 o’clock, 6 o’clock or not visible.

Figure 5 – Fuse Pin with Retaining Pin correctly installed Figure 6 – Fuse Pin with Retaining Pin correctly installed 

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 7 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT II. If one Fuse Pin is not correctly installed on the Left or Right side, proceed to step 4.2.3 corrective action for the affected side.

Retaining Pin not securing the Fuse Pin Fuse Pin not engaged in the Trunnion Block X X Fuse Pin migrated Figure 7 – Fuse Pin with the Retaining Pin not correctly installed III. If more than one Fuse Pin are not correctly installed on the Left or Right side, contact Airbus.

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 8 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

4.2.3 CORRECTIVE ACTION – (RC) If only one Fuse Pin is not correctly installed accomplish the corrective actions in accordance with Ref [2] or Ref [3].

If more than one Fuse Pin per side are incorrectly installed, contact Airbus before next flight for further instructions.

4.3 SPARES AND TOOLING In case of corrective action with Ref [2] or Ref [3], the Fuse Pins must be removed with a dedicated Fuse Pin extractor tool:

- For A350-900: P/N 98V57004012000.

- For A350-1000 P/N 98V57004042000.

NOTE: A350-1000 Fuse Pin extractor tool can be used on A350-900.

The extractor tool for A350-900 can not be used for A350-1000.

In case of corrective action, please find below the procedure for Fuse Pin sourcing:

- Send the inspection report form (Appendix 2) to Airbus Customer Services through TechRequest on Airbus World, selecting Engineering Domain, Engineering Support Section and ATA 57-26.

- Once Airbus Customer Services validate the Fuse Pins sourcing please contact your Single Point Of Contact (SPOC) through http://spares.airbus.com on AOG basis; for Free Of Charge (FOC) Fuse Pins delivery. These FOC conditions are valid until the end of the AOT compliance timeframe.

-In case of no spare availability and only one Fuse Pin not correctly installed, a temporary RDAF can be analyzed on a case by case basis to reinstall the initial Fuse Pins with a life limitation.

5. FURTHER INFORMATION

5.1 FOLLOW-UP PLAN This AOT is expected to be mandated by an Airworthiness Directive (AD) published by the Airworthiness Authorities.

5.2 IMPACTED DOCUMENTATION No specific documentation is impacted.

6. AOT APPROVAL The technical content of this document is approved under the authority of the DOA ref.EASA.21J.031.

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 9 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

7. REPORTING Questions about this AOT are to be addressed to Airbus Customer Services through TechRequest on Airbus World, selecting Engineering Domain (Engineering Support) and ATA 57-26.

As per latest reporting policy (Ref to OIT 999.0018/16), inspection results (with or without findings) are to be addressed to Airbus Customer Services through the generic e-mail address:

inspection.results@airbus.com.

Best Regards, Christian FREMONT

VICE PRESIDENT ENGINEERING SUPPORT

CUSTOMER SERVICES Pilar ALVAREZ VICE PRESIDENT A350 PROGRAMME

CUSTOMER SERVICES

Page 10OCROpen in PDF

AIRBUS

ALERT OPERATORS TRANSMISSION - AOT APPENDIX 1 - Inspection Flow Chart Within 500FC or 6 Months whichever occurs first from the effective issuance date of this AOT Perform a Visual Inspection of the 6 fuse pins at MLG Forward Pintle Fitting LH and RH Wing 4 on trunnion block) Are the 6 Fuse pins (2 on carrier and YES Send Inspection results (Appendix2) with NIL FINDING to Airbus in accordance with OIT No Further Action Required correctly installed? 999.0018/16 NO Is there more than one Fuse Pin per YES Contact AIRBUS before side incorrectly next flight installed ?

NO Send Inspection results to support spare management (Appendix2) to Airbus in accordance with OIT

999.0018/16 Perform corrective action in accordance with Ref [2] Or Ref [3] No Further Action Required AOT ref: A57P016-21 Rev 00 Page 10 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

ALERT OPERATORS TRANSMISSION - AOT AOT ref: A57P016-21 Rev 00 Page 11 of 11 Date: 01-APR-2021 © AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT APPENDIX 2 – Inspection Report Form A/C INFORMATION:

OPERATOR:

A/C MSN:

A/C REGISTRATION:

FLIGHT CYCLES FLIGHT HOURS:

DATE OF INSPECTION:

VISUAL INSPECTION RESULT:

Fuse Pin Outboard Upper Fuse Pin Outboard Middle Fuse Pin Outboard Lower Fuse Pin Inboard Middle Fuse Pin Inboard Lower Fuse Pin Inboard Upper Fuse Pins Identification (LHS view).

FUSE PIN CORRECTLY INSTALLED? LH WING (Y/N) RH WING (Y/N) Fuse Pin Outboard Upper Fuse Pin Inboard Upper Fuse Pin Outboard Middle Fuse Pin Inboard Middle Fuse Pin Outboard Lower Fuse Pin Inboard Lower COMMENTS: