TextOCR
This text is OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6790f5e4fbd5fc3be1b8ca12664bc2181012cb9981420b5416ddbe92aa464a06' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '6790f5e4fbd5fc3be1b8ca12664bc2181012cb9981420b5416ddbe92aa464a06' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
JETSTREAM Series 3100/3200
SERVICE BULLETIN 27-JM 5350 Printed in U.K.
REVISION NO.1 Effectivity Jetstream Series 200, Series 3100 and Series 3200 Aircraft This page transmits Revision No.1 to Service Bulletin 27-JM 5350 which at Original Issue consisted of 15 pages.
Title: Flight Controls - Introduction of Modified Push Rod Assembly at Gustlock/Power Lever Baulk Mechanism.
(Modification JM 5350) This revision is issued to up-grade the status of the bulletin from OPTIONAL to OPTIONAL - HIGHLY RECOMMENDED.
Aircraft on which the bulletin, at original Issue, has already been accomplished, require no further rework.
Remove and destroy pages 1, 2 and 3 at original Issue standard.
Insert new pages 1, 2 and 3 at Revision No.1 standard.
All other pages remain at Original Issue.
ORIGINAL ISSUE May 6/94 PAGE 1 OF 1
No text on this page: it may be a figure. Open the PDF to see it.
JETSTREAM Series 3100/3200
SERVICE BULLETIN 27-JM 5350 TITLE: FLIGHT CONTROLS - INTRODUCTION OF MODIFIED PUSH ROD
ASSEMBLY AT GUSTLOCK/POWER LEVER BAULK MECHANISM (MODIFICATION JM 5350)
1. PLANNING INFORMATION A. Effectivity Jetstream Series 200, Series 3100 and Series 3200 Aircraft up to and including constructors number 927, and from constructors number 929 to 936 inclusive.
B. Reason operators have reported that both power levers were able to be pushed into the flight range, with the gust lock lever fully engaged.
So ver bai ace as found to be bent. bent.a1o, in the porest Embodiment of this service bulletin installs a stronger push rod assembly.
C. Description This service bulletin affects the push rod assembly on the gust lock/power lever baulk mechanism in the flight compartment centre console.
Retrospective embodiment is achieved by gaining access to and removing the existing push rod assembly. A new push rod assembly is installed to reconnect the power lever baulk mechanism to the gust lock system.
The work requires that the system is functionally tested.
A duplicate inspection is to be carried out.
ORIGINAL ISSUE FEB 26/92 27-JM 5350 REVISION NO.1 May 6/94 PAGE 1
JETSTREAM
SERVICE BULLETIN The work is affected by the following modifications:
MOD 7561 Introduction of gust lock disengagement at (Mandatory) or before 50% of operating lever travel plus revised lock units with improved efficiency.
MOD 7669 Introduction of improved gust lock system.
MOD 7689A - Introduction of revised gust lock control system (retrospective embodiment).
MOD 7689B - Introduction of positive means of disengaging gust locks (production embodiment).
D. Approval This service bulletin has been classified as OPTIONAL.
R Jetstream Aircraft Ltd. HIGHLY RECOMMEND accomplishment of R this bulletin at the earliest opportunity. The technical content of this bulletin is approved under the authority of R CAA Approval No. DAI/9386/92.
F. Manpower 6 manhours F. Material Price and Availability Indicative price £173.00 excluding taxes. The above information is provided for planning purposes only, and is based on pricing prevailing at the time of issue of this bulletin.
Firm prices may be obtained from the Spares Manager, Customer Support, Jetstream Aircraft Itd., Prestwick Airport, Ayrshire, KA9 2RW, Scotland.
G. Tooling - Cost and Availability No special tools are required, only those items of ground equipment or tools that may be specified in the aircraft technical manuals referred to in the accomplishment instructions in this service bulletin.
H. Weight and Balance None 27-JM 5350 ORIGINAL ISSUE FEB 26/92 PAGE 2 REVISION NO.1 MaY 6/94
JETSTREAM
SERVICE BULLETIN I. References Jetstream Series 3100 and Series 3200 Aircraft Maintenance Manual, Chapters 24, 25, 27 and 76.
Jetstream Series 200 Aircraft Maintenance Manual, Chapters 19, 30, 40 and 55.
J. Publications Affected The following aircraft manuals are affected:
LIK Maintenance Manual Illustrated Parts Catalogue Operators must advise the Technical Publications Manager, R Jetstream Aircraft Ltd., Prestwick Airport, Ayrshire, KA9 2RW, Scotland, of the accomplishment of this service bulletin and request the necessary revision for the affected manuals.
Operators of Jetstream Series 200 aircraft are advised that the content of this service bulletin can be used with current manuals.
R K. This service bulletin has been clasified as OPTIONAL.
R Jetstream Aircraft Ltd., HIGHLY RECOMMEND the R accomplishment of this service bulletin at the earliest R R This service bulletin complies with British Civil R Airworthiness Requirements, Section A, Chapter A2-5.
R Signed P Seeles..
R Date 38 Маз 1994 R CAA Approval Number DAI/9386/92.
ORIGINAL ISSUE FEB 26/92 27-JM 5350 REVISION NO.1 May 6/94 PAGE 3
JETSTREAM
SERVICE BULLETIN Printed in the UK
THIS PAGE IS INTENTIONALLY BLANK 27-JM 5350 ORIGINAL ISSUE FEB 26/92 PAGE 4
JETSTREAM
SERVICE BULLETIN
2. ACCOMPLISHMENT INSTRUCTIONS WARNING: MINIMUM CLEARANCE BETWEEN MOVING AND STRUCTURAL PARTS MUST BE 0.20IN. (5.08MM) UNLESS OTHERWISE STATED. FOR AIRCRAFT WITH CONSTRUCTOR'S NUMBER 931
AND ABOVE, THE CLEARANCE MAY REDUCE TO
0.05IN. (1.28MM) AT THE FOLLOWING POINTS (REFER TO FIGURE 6).
(1) BETWEEN THE RUDDER LOCK HORIZONTAL CONTROL ROD AND THE EDGE OF THE HOLE THROUGH BULKHEAD STN.463.
(i1) BETWEEN THE ELEVATOR LOCK CONTROL ROD AND THE
RUDDER LOCK BELLCRANK BRACKET MOUNTED ON BULKHEAD STN.463.
CAUTION: TO AVOID DAMAGE, MAKE SURE BEFORE MOVING CONTROLS
THAT CONTROL RUNS AND CONTROL SURFACES ARE FREE FROM OBSTRUCTION.
DUPLICATE INSPECTION
WHENEVER ANY PART OF THIS SYSTEM IS DISMANTLED, ADJUSTED,
REPAIRED OR RENEWED, DETAILED INVESTIGATION MUST BE MADE ON
COMPLETION TO ENSURE THAT DISTORTION, TOOLS, RAGS OR ANY OTHER
LOOSE ARTICLES OR FOREIGN MATTER SUCH AS COULD IMPEDE THE FREE
MOVEMENT AND SAFE OPERATION OF THE SYSTEM ARE NOT PRESENTI AND THAT THE SYSTEMS AND INSTALLATIONS IN THE WORK AREA ARE CLEAN.
WHENEVER ANY PART OF EITHER THE MAIN OR ANY OTHER ASSOCIATED
SYSTEM IS DISMANTLED, ADJUSTED, REPAIRED OR RENEWED, THAT PART OF
THE SYSTEM THAT HAS BEEN DISTURBED SHALL BE SUBJECTED TO A
DUPLICATE INSPECTION FOR SECURITY OF LOCKING DEVICES, FULL AND
FREE MOVEMENT, DIRECTION AND TENSION CHECKS AND, FOR AIRCRAFT ON
THE UNITED KINGDOM REGISTER, THE COMPLETION OF THIS WORK SHALL BE
CERTIFIED IN ACCORDANCE WITH THE BRITISH CIVIL AIRWORTHINESS REQUIREMENTS, SECTION A, CHAPTER A5-3.
CAUTION: EXERCISE EXTREME CARE, AS IT MAY BE DIFFICULT TO
RETRIEVE ITEMS INADVERTENTLY DROPPED IN THE FLIGHT COMPARTMENT CENTRE CONSOLE.
Note: Statements MM refer to the Jetstream Series 3100 and Series 3200 Aircraft Maintenance Manual, Jetstream Series 200 Aircraft Maintenance Manual references follow in brackets.
A. Preparation
(1) Render the aircraft electrically safe in accordance with the MM, Chapter 24 (55).
ORIGINAL ISSUE FEB 26/92 27-JM 5350 PAGE 5
JETSTREAM
SERVICE BULLETIN Remove the right hand crew seat and support structure.
in accordance with MM, Chapter 25 (30).
Remove the centre console right side panel and right side trim panel in accordance with MM, Chapter 25
(30).
B. Accomplishment
(1) Refer to Figures 1 and 2:
At push rod assembly, Part No. 1372011419, remove the split pin and collar from each end. Remove the shackle pins and withdraw the push rod assembly.
Retain the collars and shackle pins, discard the split pins.
Ensure the flight control gust locks are rigged in accordance with MM, Chapter 27 (19). Ensure the power levers are rigged in accordance with MM, Chapter 76
(40) .
(3) Push the power levers fully forward and set the gust lock operating lever to the position shown in Figure
3.
i.e. 0.60 † 0.03in from bottom of lever slot for the following aircraft: constructors numbers 604, 703, 705, 707, 814, 818, 819, 821, 823, 824, 828, 830 to 833 incl., 835 to 837 incl. and 840 and above.
OR
1.20 ‡ 0.03in from bottom of lever slot for all other aircraft.
ever in position ure Insert a screw, washer and nut in the lever slot and tighten to secure the gust lock operating
(4) Refer to Figures 2 and 5:
Hold the baulk mechanism against the baulk plates on the power quadrant assembly. Connect the new push rod assembly, Part No. 137201E429, to the baulk lever.
Adjust the length until the shackle pin can be inserted through the bellcrank lever and push rod without disturbing the baulk mechanism.
(5) Lubricate the shackle pins with Aeroshell Fluid 12 (MIL-L-6085 DEF STAN 91-49).
(6) With the power levers in the FULL REVERSE position, remove the securing screw, washer and nut, and set lock operating handle to IN position.
27-JM 5350 ORIGINAL ISSUE FEB 26/92 PAGE 6
JETSTREAM
SERVICE BULLETIN
(7) Push both power levers forward until the baulk engages. Check that power levers are positioned within the dimensions shown in Figure 4. The new push rod assembly, Part No. 137201E429, may be shortened or lengthened by up to two turns to achieve this.
(8) Adhere a piece of adhesive tape on the panel alongside the gust lock operating handle (see Figure 3).
(9) Slowly move the gust lock operating handle from the IN position towards the oUr position, while applying slight pressure to test for movement on the rudder, elevator and aileron controls. At the point where all nree controis are iree, mark the position oi tne lower edge of the gust lock operating handle on the adhesive tape.
(10) Continue the movement of the gust lock operating handle while applying forward pressure to both power levers. At the point where both power levers can be advanced to FLIGHT, mark the position of the lower edge of the gust lock operating handle on the adhesive tape.
(11) The distance between the two marks is to be a minimum of 0.30in. To achieve this, the new push rod assembly, Part No. 137201E429, may be adjusted.
(12) If any adjustment is made at operation (11), repeat operations (7), (9), (10) and (11) until the power levers are baulked and the gust lock disengagement sequence can be achieved within limits.
(13) Remove the adhesive tape. Check that the gust lock operating handle when released from IN, or any intermediate position, returns to the oUT position.
(14) Check that when the power levers are baulked, each lever can individually be moved into the FLIGHT range while the other remains baulked.
C. Aircraft Recovery
(1) Carry out a functional check of the gust lock system in accordance with the MM, Chapter 27 (19).
(2) Carry out a Duplicate Inspection of the gust lock control system.
ORIGINAL ISSUE FEB 26/92 27-JM 5350 PAGE 7
JETSTREAM
SERVICE BULLETIN
(3) Carry out a check for loose articles in the work area and install the console side panels in accordance with the MM, Chapter 25 (30).
(4) Install the right hand seat and support structure in accordance with the MM, Chapter 25 (30).
(5) Ensure the work area is clean and clear of tools and miscellaneous items of equipment.
(6) Record in the relevant aircraft documents the embodiment of Modification JM 5350.
Note: Operators are reminded of the necessity to inform British Aerospace of the accomplishment of this service bulletin in order to obtain the necessary revisions for the affected manuals, see para 1.J.
- Publications Affected - of this bulletin.
Note: Operators are reminded that is is their responsibility to amend the aircraft weighing report, if necessary, in accordance with the weight and balance changes given at para. 1.H. of this bulletin.
27-JM 5350 ORIGINAL ISSUE FEB 26/92 PAGE 8
JETSTREAM
SERVICE BULLETIN
LOCATION OF
PUSH ROD 137201E419
PUSH ROD (137201E419) FIGURE 1 ORIGINAL ISSUE FEB 26/92 27-JM 5350 PAGE 9
JETSTREAM
SERVICE BULLETIN
REMOVE AND RETAIN PIN (SP4YB4)
REMOVE AND REJECT
PUSH ROD ASSEMBLY SPLIT PIN (SP90C4) (137201E419)
REMOVE AND RETAIN PIN (SP4YB4) Printed in the UK
REMOVE AND REJECT , SPLIT PIN (SP90C4) PRE-MOD
REMOVE AND RETAIN COLLAR (S135C)
- PIN (SP4YB4)
PUSH ROD ASSEMBLY SPLIT PIN (SP90C4) (137201E429) PIN (SP4YB4) SPLIT PIN (SP90C4) POST-MOD
- COLLAR (S135C)