Copy · U.S. DOT/FAA - Service Bulletin · 99 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0028; AD 2011-12-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '2c16e23415488aa5f6a593dc73835524a448edb9ba9b86559e923d0f0b799861'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 737 Service Bulletin ALERT Number: 737-28A1212 Original Issue: July 23, 2009 Revision 1: August 27, 2010 ATA System: 2822 SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI) Relay Installation Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2009 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.

This document includes proprietary information owned by The Boeing Company and/or one or more third parties.

Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 1 of 99

5.0

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 2 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

BLANK PAGE

Table of Contents

Revision Transmittal Sheet5

Summary9

1. PLANNING INFORMATION ........................................ 1 3 A. Effectivity ............................................... 1 3

1. Airplanes ............................................ 1 3

2. Spares Affected ........................................ 3 0 B. Concurrent Requirements ...................................... 3 0 C. Reason ................................................ 3 0 D. Description .............................................. 3 1 E. Compliance .............................................. 3 3 F. Approval ............................................... 3 4 G. Manpower .............................................. 3 4 H. Weight and Balance Changes .................................... 3 9 I. Electrical Load Data ......................................... 3 9 J. References .............................................. 4 0

1. Existing Data: ......................................... 4 0

2. Data supplied with this Service Bulletin: ........................... 4 0

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 4 0 K. Publications Affected ........................................ 4 0 L. Interchangeability and Intermixability of Parts ........................... 4 1

2. MATERIAL INFORMATION ........................................ 4 3 A. Material - Price and Availability ................................... 4 3 B. Industry Support Information .................................... 4 4 C. Parts Necessary For Each Airplane ................................. 4 4

1. Kits/Parts: ........................................... 4 4

2. Parts and Materials Supplied by the Operator: ........................ 4 6

3. Parts Modified and Reidentified: ............................... 4 7

4. Parts Removed and Not Replaced: .............................. 4 7 D. Parts Necessary to Change Spares ................................. 4 7 E. Special Tooling - Price and Availability ............................... 4 7 F. Special Tooling Necessary to do this Service Bulletin ....................... 4 7

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 9 A. GENERAL INFORMATION ..................................... 4 9 B. WORK INSTRUCTIONS ....................................... 5 0 FIGURE 1: M181, M182, M183 RELAY MODULE ASSEMBLY REPLACEMENT [Group 1, 8] ..... 5 4 FIGURE 2: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 2, Configuration 1] . . . 56 FIGURE 3: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 3, 9-13, Configuration 1] . 58 FIGURE 4: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 4, Configuration 1] . . . 60 FIGURE 5: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 5, Configuration 1] . . . 62 FIGURE 6: REPLACEMENT OF THE FUEL PUMP POWER RELAY [Group 6, Configuration 1] . . . 65 FIGURE 7: REPLACEMENT OF THE FUEL PUMP POWER RELAY [Group 7, Configuration 1] . . . 68 FIGURE 8: W0044 WIRE BUNDLE ROUTING [Group 2-3, 6-7, 9-13, Configuration 1] ......... 7 1 FIGURE 9: WIRE BUNDLE W0044 - WIRING CHANGES [Group 2, Configuration 1] ......... 7 2 FIGURE 10: WIRE BUNDLE W0044 - WIRING CHANGES [Group 3, 12, Configuration 1] ....... 7 4 FIGURE 11: WIRE BUNDLE W0044 - WIRING CHANGES [Group 6-7, 9, Configuration 1] ....... 7 6

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 3 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

FIGURE 12: WIRE BUNDLE W0044 - WIRING CHANGES [Group 10, Configuration 1] ......... 7 7 FIGURE 13: WIRE BUNDLE W0044 - WIRING CHANGES [Group 11, 13, Configuration 1] ....... 7 8 FIGURE 14: FUEL BOOST PUMP CONNECTOR - WIRE LOCATION [Group 8, Configuration 1] . . . 80 FIGURE 15: FUEL BOOST PUMP GROUNDS - WIRE LOCATION [Group 8, Configuration 1] ..... 8 1 FIGURE 16: FUEL BOOST PUMP CONNECTOR - WIRING CHANGES [Group 8, Configuration 1] . . 82 FIGURE 17: FUEL BOOST PUMP CONNECTOR - WIRE LOCATION [Group 8, Configuration 2] . . . 84 FIGURE 18: FUEL BOOST PUMP GROUNDS - WIRE LOCATION [Group 8, Configuration 2] ..... 8 5 FIGURE 19: FUEL BOOST PUMP CONNECTOR - WIRING CHANGES [Group 8, Configuration 2] . . 86 FIGURE 20: FUEL BOOST PUMP CONTROL GROUND FAULT INTERRUPTER (GFI) CONTROL RELAY REFERENCE [Group 1; Group 2-7, Configuration 1; Group 8; Group 9-13, Configuration 1] . 87 FIGURE 21: WIRE BUNDLE W0044 WIRING CHANGES [Group 1, 8] .................. 8 8 FIGURE 22: RELAY MOUNTING PANEL - GROUND STUDS AND BONDING JUMPER INSTALLATION [Group 2-7, 9-13] ........................................ 9 0 Appendix A: ELECTRICAL BONDING .................................... 9 4

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 4 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

Commercial Airplanes 737 Service Bulletin ALERT Revision Transmittal SheetNumber: 737-28A1212Original Issue: July 23, 2009 Revision 1: August 27, 2010 ATA System: 2822 SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI) Relay Installation This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION More work is necessary on airplanes changed in accordance with the original issue of this service bulletin:

- Group 2 through 7 Airplanes and Group 9 through 11 airplanes that incorporated original issue of this service bulletin have to incorporate Accomplishment Instructions, Work instructions, Part 2 that provides work instructions to install a Bonding Jumper between the relay mounting panel and P6 Load Control Center structure, and measure the electrical bonding resistance between the GFI relays and the relay mounting panel.

-Group 1 and Group 8 airplanes that incorporated original issue of this service bulletin have to incorporate Accomplishment Instructions, Work instructions, Part 3 that provides work instructions to measure the electrical bonding resistance between the GFI relays and the Relay Module Assemblies M181, M182, and M183 in accordance with Revision 1 of BAE Service Bulletin 65-49808-24-01, and to measure the electrical bonding resistance between the Relay Module Assemblies M181, M182, and M183 and the P6 Load Control Center structure.

Airplanes PM541-PM548 were added to Group 2 of this service bulletin effectivity.

REASON FOR REVISION This revision is sent to add instructions for installation of a Bonding Jumper between P6-2 relay panel and P6 side panel for Group 2 through Group 7 and Group 9 through Group 13 airplanes. Instructions are added to clean/prepare the contact surfaces of the relays and P6-2 panels to obtain the required electrical bonding. This revision adds instructions to measure the electrical bonding resistance between the GFI relays and the P6-2 relay panel and between the P6-2 relay panel and P6 side panel. This revision is sent to add airplanes to the service bulletin effectivity. Also, this revision adds instructions for Group 1 and Group 8 airplanes to measure the electrical bonding resistance between M181, M182, and M183 Relay Module Assemblies and P6 Load Control Center structure. Also, access instructions were added to the service bulletin.

These sections were changed:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 5 of 99

1. Airplanes PM541-PM548 are added to the service bulletin effectivity. Added new airplane configurations to the group configuration table.

2. Group 12 and Group 13 had been added to the configuration table. Airplanes delivered with Auxiliary Tank wire provisions have been moved to Group 12 and Group 13. Group/Configuration information has been added to define those airplanes that have already accomplished initial release of the service bulletin.

3. Changed the concurrent requirements reference from original issue of BAE Component Service Bulletin 65-49808-24-01 to Revision 1 of the BAE Component Service Bulletin 65-49808-24-01.

4. Removed the reference to the Fault Isolation Manual and changed the IPC reference in Paragraph 1.K., Publications affected. The 737-100/-200/-300/-400/-500 airplane models do not have a Fault Isolation Manual.

5. Task hour tables had been added for each airplane group configuration. The task hour estimates were changed to include the removal and installation of the galley number one.

6. Three kits, availability, and price information was added to paragraph 2.A. Material Information.

7. The work instructions were changed to include:

a. The removal and installation of the galley number one to get access to the work location.

b. The installation of a bonding jumper.

c. To prepare/clean the contact surfaces of the relays and mounting panel to obtain the required electrical bonding.

d. To measure the bonding resistance between the GFI relays and mounting panel.

e. To measure the bonding resistance between the mounting panel and P6 Load Control Center structure.

f. Added Part 2 and Part 3 for airplanes that incorporated original issue of the service bulletin.

8. Terminology has been changed in the Work Instructions to agree with the terminology defined in Paragraph

3.A. General Information - Notes.

9. Figure 1 was changed to change the reference to Revision 1 of the BAE Component Service Bulletin 65-49808-24-01. Step was added to measure the electrical bonding resistance between Relay Module Assemblies M181, M182, and M183 and the P6 Load Control Center structure.

10. Figure 2, 3, 4, 5, 6, 7 have been changed to prepare/clean the contact surfaces of the relays and mounting panel in order to obtain the required electrical bonding.

11. Figure 22 has been added. this figure provides instructions to add a bonding jumper between relay mounting panel and P6 Load Control Center structure and measure the bonding resistance between the relay mounting panel and P6 Load Control Center structure.

12. Appendix A that provides information for electrical bonding was added to Paragraph 3.A., Work Instructions.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 6 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

Pages with no vertical lines have no important changes.

REVISION HISTORY July 23, 2009Original Issue:

August 27, 2010Revision 1:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 7 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 8 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

BLANK PAGE

Commercial Airplanes 737 Service Bulletin ALERT SummaryNumber: 737-28A1212Original Issue: July 23, 2009 Revision 1: August 27, 2010 ATA System: 2822 SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI) Relay Installation

THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH

1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OWNER.

CONCURRENT REQUIREMENTS BAE Component Service Bulletin 65-49808-24-01, Revision 1, is necessary to be accomplished prior to or concurrent with this service bulletin for Group 1 and Group 8 airplanes. BAE Component Service Bulletin 65-49808-24-01 gives the parts and instructions to replace relays in the M181, M182, and M183 Relay Module Assemblies.

BACKGROUND This service bulletin gives the instructions to replace the power control relays for the fuel boost pumps. The relays are located in the P6 circuit breaker panel in the flight compartment. The new relays include a Ground Fault Interrupt (GFI) feature. The GFI relay feature will protect the fuel pumps from damage caused by electrical arcing because the electrical power will be removed from the pump if a ground fault is detected. Electrical arcing could create a possible source of ignition of flammable fuel vapors in the fuel tanks. Ignition of flammable fuel vapors could cause a fire or explosion which could put the airplane in an unsafe condition.

This service bulletin is the result of the safety assessments conducted by Boeing under SFAR 88, "Fuel Tank System Fault Tolerance Evaluation Requirements".

This change affects section 9 of the Maintenance Planning Data (MPD) Document. The Airworthiness Limitations (AWL) "28-AWL-23" (737-100/200/200C airplanes) and "28-AWL-22" (737-300/400/500 airplanes) are related to this service bulletin.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 9 of 99

ACTION (PRR 35440-10RS) Airplane Work

1. Get access to the flight compartment.

2. For Groups 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13 airplanes, at the P6 Load Control Center install two ground studs and a ground bonding jumper.

3. For Groups 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13 airplanes measure the electrical bonding between the P6-2 relay panel and P6 Load Control Center structure.

4. For Group 2 Configuration 1, and Group 4 Configuration 1, replace (6) relays with Ground Fault Interrupt (GFI) relays. For Group 3 Configuration 1, Group 5-7 Configuration 1, and Group 9-13 Configuration 1, replace (8) relays with Ground Fault Interrupt (GFI) relays. Measure the electrical bonding between the GFI relays and the P6-2 panel.

5. For Groups 1 and 8 airplanes install the Ground Fault Interrupt (GFI) relays in Relay Module Assemblies M181, M182, and M183 in accordance with BAE Component Service Bulletin 65-49808-24-01 and change wire W044. Measure the electrical bonding between M181, M182, M183 and the adjacent P6 Load Control Center structure.

6. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the fuel boost pumps.

EFFECTIVITY All 737-100/-200/-200C/-300/-400/-500 Airplanes.

COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that operators make the changes shown in this service bulletin within 60 months after the date of Revision 1 of this service bulletin.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.

MANPOWER Refer to Paragraph 1.G., Manpower.

MATERIAL INFORMATION Operator Supplied Parts/Materials.

Refer to Paragraph 2.A., Material - Price and Availability.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 10 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 11 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: July 23, 2009 737-28A1212Revision 1: August 27, 2010 12 of 99 BOEING SERVICE BULLETIN 737-28A1212

ALERTALERT

BLANK PAGE

Pages 13–24 of 99