Copy · Boeing - Service Bulletin · 306 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0487; AD 2015-16-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '3dcc59424b351d82982f10109f5c8d32a52d264a85e8fda8c1e9488443af184d'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 737 Service Bulletin ALERT Number: 737-31A1332 Original Issue: January 07, 2010 Revision 4: October 31, 2013 ATA System: 3100 SUBJECT: INDICATING / RECORDING SYSTEMS - Aural Warning System - Installation of the Cabin Altitude Warning System and Takeoff Configuration Warning System Lights Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2010 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 1 of 306

7.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 2 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

BLANK PAGE

Table of Contents

Revision Transmittal Sheet7

Summary ..................................................... 1 1

1. PLANNING INFORMATION ........................................ 1 7 A. Effectivity ............................................... 1 7

1. Airplanes ............................................ 1 7

2. Spares Affected ........................................ 3 3 B. Concurrent Requirements ...................................... 3 3 C. Reason ................................................ 3 4 D. Description .............................................. 3 5 E. Compliance .............................................. 3 8 F. Approval ............................................... 3 9 G. Manpower .............................................. 3 9 H. Weight and Balance Changes .................................... 6 3 I. Electrical Load Data ......................................... 6 4 J. References .............................................. 6 4

1. Existing Data: ......................................... 6 4

2. Data Supplied with this Service Bulletin: ........................... 6 5

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 6 5 K. Publications Affected ........................................ 6 5 L. Interchangeability and Intermixability of Parts ........................... 6 6 M. Software Accomplishment Summary ................................ 6 6

2. MATERIAL INFORMATION ........................................ 6 7 A. Material - Price and Availability ................................... 6 7 B. Industry Support Information .................................... 7 5 C. Parts Necessary for Each Airplane ................................. 7 5

1. Kits/Parts ............................................ 7 5

2. Parts and Materials Supplied by the Operator ........................ 9 0

3. Parts Modified and Reidentified ................................ 9 1

4. Parts Removed and Not Replaced .............................. 9 4 D. Parts Necessary to Change Spares ................................. 9 4 E. Special Tooling - Price and Availability ............................... 9 4 F. Special Tooling Necessary to do this Service Bulletin ....................... 9 4

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 9 5 A. GENERAL INFORMATION ..................................... 9 5 B. WORK INSTRUCTIONS ....................................... 9 6 FIGURE 1: FLIGHT COMPARTMENT - P1-3 PANEL MODIFICATION [Group 1-6, 8-12, 16-18, 20, 22-33] ................................................. 1 3 0 FIGURE 2: FLIGHT COMPARTMENT - P3-1 PANEL MODIFICATION [Group 1-6, 8-12, 16-18, 20, 22-33] ................................................. 1 3 2 FIGURE 3: FLIGHT COMPARTMENT - P1-3 AND P3-1 PANELS - PANELS MODIFICATION AND INOP MARKERS REMOVAL [Group 7, 13-15, 19, 21] ...................... 1 3 4 FIGURE 4: FLIGHT COMPARTMENT - P6-2 CIRCUIT BREAKER PANEL - C01698 CIRCUIT BREAKER INSTALLATION ........................................ 1 3 6 FIGURE 5: P1-3 AND P3-1 PANELS - W0001 AND W0003 WIRE BUNDLES ROUTING [Group 1-6, 8-12, 16-18, 20, 22-33] ....................................... 1 3 8 FIGURE 6: CHANGES TO THE W0001 WIRE BUNDLE [Group 1-3, 5-6, 8-12, 16-18, 20, 22-33] . . 139 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 3 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

FIGURE 7: CHANGES TO THE W0001 WIRE BUNDLE [Group 4] ................... 1 4 1 FIGURE 8: CHANGES TO THE W0003 WIRE BUNDLE [Group 1-6, 8-12, 16-18, 20, 22-33] ..... 1 4 3 FIGURE 9: W2508, W5156 AND W5514 WIRE BUNDLES ROUTING [Group 1-6, 22-29] ...... 1 4 5 FIGURE 10: CHANGES TO THE W2508 WIRE BUNDLE [Group 5, 28] ................. 1 5 5 FIGURE 11: CHANGES TO THE W2508 WIRE BUNDLE [Group 1-4, 6, 22-27, 29] .......... 1 5 7 FIGURE 12: CHANGES TO THE W5156 WIRE BUNDLE [Group 1, 5-6, 22-23] ............ 1 5 9 FIGURE 13: CHANGES TO THE W5156 WIRE BUNDLE [Group 3] ................... 1 6 3 FIGURE 14: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 4] ........... 1 6 7 FIGURE 15: CHANGES TO THE W5514 WIRE BUNDLE [Group 1-6, 22-29] .............. 1 7 2 FIGURE 16: W0040 AND W0054 WIRE BUNDLES ROUTING [Group 1-5, 7-10, 12-28, 30-31, 33] . . 174 FIGURE 17: CHANGES TO THE W0040 WIRE BUNDLE [Group 1-5, 7-10, 12-28, 30-31, 33] ..... 1 7 8 FIGURE 18: W0040 AND W0054 WIRE BUNDLES ROUTING [Group 6, 11, 29, 32] .......... 1 8 0 FIGURE 19: CHANGES TO THE W0040 WIRE BUNDLE [Group 6, 11, 29, 32] ............ 1 8 4 FIGURE 20: CHANGES TO THE W0054 WIRE BUNDLE ........................ 1 8 6 FIGURE 21: E1-1 ELECTRONICS SHELF - W0111 WIRE BUNDLE ROUTING ............ 1 8 8 FIGURE 22: CHANGES TO THE W0111 WIRE BUNDLE [Group 1-25, 27-33] ............. 1 8 9 FIGURE 23: W2103 WIRE BUNDLE ROUTING .............................. 1 9 1 FIGURE 24: CHANGES TO THE W2103 WIRE BUNDLE ........................ 1 9 6 FIGURE 25: CHANGES TO THE W5156 WIRE BUNDLE [Group 7] ................... 1 9 8 FIGURE 26: CHANGES TO THE W5514 WIRE BUNDLE [Group 7] ................... 2 0 2 FIGURE 27: FORWARD ELECTRONICS COMPARTMENT CEILING - CABIN ALTITUDE WARNING - CABIN HIGH ALTITUDE WARNING SWITCH (12,650 SET POINT) INSTALLATION [Group 8-9, 11, 13-14, 16-18, 30-32] ..................................... 2 0 3 FIGURE 28: FORWARD ELECTRONICS COMPARTMENT CEILING - CABIN ALTITUDE WARNING - CABIN HIGH ALTITUDE WARNING SWITCH (14,000 SET POINT) INSTALLATION [Group 10, 20] ................................................. 2 0 6 FIGURE 29: P5-16 CABIN ALTITUDE AND RATE OF CLIMB MODULE - REMOVAL [Group 8-20, 30-33] ................................................. 2 0 9 FIGURE 30: P5-16 CABIN ALTITUDE AND RATE OF CLIMB MODULE - INSTALLATION [Group 8-20, 30-33] ................................................. 2 1 1 FIGURE 31: P5-10 AIR CONDITIONING PANEL - REPLACEMENT [Group 8, 10-11, 13, 16-17, 20, 31-32] ................................................. 2 1 3 FIGURE 32: P5-10 AIR CONDITIONING PANEL - REPLACEMENT [Group 9, 14, 18, 30] ....... 2 1 5 FIGURE 33: W2508, W5156 AND W5514 WIRE BUNDLES ROUTING [Group 8-21, 30-33] ...... 2 1 7 FIGURE 34: CHANGES TO THE W2508 WIRE BUNDLE [Group 8-11, 16, 30-32] ........... 2 2 8 FIGURE 35: CHANGES TO THE W2508 WIRE BUNDLE [Group 12, 33] ................ 2 3 2 FIGURE 36: CHANGES TO THE W2508 WIRE BUNDLE [Group 13-14] ................ 2 3 4 FIGURE 37: CHANGES TO THE W2508 WIRE BUNDLE [Group 15, 19, 21] .............. 2 3 8 FIGURE 38: CHANGES TO THE W5156 WIRE BUNDLE [Group 8-12, 20] ............... 2 4 0 FIGURE 39: CHANGES TO THE W5156 WIRE BUNDLE [Group 13-15, 21] .............. 2 4 4 FIGURE 40: CHANGES TO THE W5514 WIRE BUNDLE [Group 8-9, 11, 16, 30-32] .......... 2 4 8 FIGURE 41: CHANGES TO THE W5514 WIRE BUNDLE [Group 12, 33] ................ 2 5 0 FIGURE 42: CHANGES TO THE W5514 WIRE BUNDLE [Group 13-14] ................ 2 5 2 FIGURE 43: CHANGES TO THE W5514 WIRE BUNDLE [Group 15, 19, 21] .............. 2 5 4 FIGURE 44: CHANGES TO THE W2508 WIRE BUNDLE [Group 17-18, 20] .............. 2 5 5 FIGURE 45: CHANGES TO THE W5514 WIRE BUNDLE [Group 17-18] ................ 2 5 9 FIGURE 46: CHANGES TO THE W5156 WIRE BUNDLE [Group 19] .................. 2 6 1 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 4 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

FIGURE 47: CHANGES TO THE W5514 WIRE BUNDLE [Group 10, 20] ................ 2 6 5 FIGURE 48: CHANGES TO THE W2218 WIRE BUNDLE [Group 1, 3, 5-15, 19-21, 26] ........ 2 6 7 FIGURE 49: CHANGES TO THE W2218 AND W2135 WIRE BUNDLES [Group 22] .......... 2 6 9 FIGURE 50: CHANGES TO THE W2218 AND W2589 WIRE BUNDLES [Group 23] .......... 2 7 1 FIGURE 51: W5156 AND W5514 WIRE BUNDLES ROUTING [Group 7] ................ 2 7 3 FIGURE 52: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 2, 24-25, 28-29] . . . 284 FIGURE 53: CHANGES TO THE W5156 WIRE BUNDLE [Group 26] .................. 2 8 9 FIGURE 54: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 27] .......... 2 9 3 FIGURE 55: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 16-18, 30-33] .... 2 9 8 FIGURE 56: CHANGES TO THE W0111 WIRE BUNDLE [Group 26] .................. 3 0 2 APPENDIX A: P1-3, P3-1, P5-10 AND P5-16 PANELS - PART NUMBERS ................ 3 0 4 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 5 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 6 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

BLANK PAGE

Commercial Airplanes 737 Service Bulletin ALERT Revision Transmittal SheetNumber: 737-31A1332Original Issue: January 07, 2010 Revision 4: October 31, 2013 ATA System: 3100 SUBJECT: INDICATING / RECORDING SYSTEMS - Aural Warning System - Installation of the Cabin Altitude Warning System and Takeoff Configuration Warning System Lights This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-02-05 is related to this service bulletin.

No more work is necessary on the airplane(s) changed in accordance with Revision 1, Revision 2 and Revision 3 of this service bulletin.

Airplanes YA091-YA097 were added to Group 1 of this service bulletin effectivity.

REASON FOR REVISION This revision is sent to advise operators of several changes to the service bulletin. Airplanes YA091-YA097 were added to Group 1 of this service bulletin effectivity because they were incorrectly removed from Revision

3. The airplane YG001 has been moved from Group 2 to Group 31. Manpower estimates have changed to include an additional time for the removal of the drip shield, the airstair assembly and the airstair door for airplanes that have airstairs installed. A new BAE Systems component service bulletin 233A2222-31-06 has been added.

For Group 15, 19 and 21 airplanes, FIGURE 37 and FIGURE 43 have been changed because these airplanes do not need to install the R1044 and the associated wiring. FIGURE 34, 36 and 44 have been changed to add the W2508-0032-22 wire. Also, the FAA Airworthiness Directive AD 2013-02-05 has been added to the service bulletin.

These sections were changed:

1. In Summary, Action and Paragraph 1.D., Description, added a separate set of instructions for Group 2, 4, 16-18, 24-25, 27-33 airplanes.

2. In Summary, Background, added a summary evaluation table.

3. In Summary, Compliance and Paragraph 1.E., Compliance, added the AD 2013-02-05.

4. In Summary, Manpower and in Paragraph 1.G., Manpower, changed a note to add a new BAE Systems SB 233A2222-31-06.

5. In Summary, Manpower and in Paragraph 1.G., Manpower, changed Group 16 information.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 7 of 306

6. In Paragraph 1.A., Effectivity, added airplanes YA091-YA097 because they were incorrectly removed from Revision 3. Also, the airplane YG001 has been moved from Group 2 to Group 31.

7. In Paragraph 1.F., Approval, added AMOC paragraph.

8. In Paragraph 1.G., Manpower, Group 26 table, added FIGURE 48.

9. In Paragraph 1.G., Manpower, added a table for airplanes that have airstairs installed.

10. In Paragraph 1.J.1., Existing Data, added AMM, AD references and BAE Systems SB 233A2222-31-06.

Also, changed SWPM references.

11. In Paragraph 1.K., Publications Affected, changed CMM reference.

12. In Paragraph 2.A., Material - Price and Availability, Group 5, 28 airplanes table, changed note (c).

13. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator, added BAE Systems SB 233A2222-31-06 and the SWPM reference.

14. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator, changed (e), (f) and (i) notes.

15. In Paragraph 2.C.3., Parts Modified and Reidentified and APPENDIX A, added BAE Systems SB 233A2222-31-06.

16. In Paragraph 3.A., General Information, added notes.

17. In Paragraph 3.B., Work Instructions, step 9, changed a note and added the Group 26 applicability.

18. In Paragraph 3.B., Work Instructions, step 1 (high altitude configuration), added a note with open access instructions.

19. In Paragraph 3.B., Work Instructions, added step 15 (basic configuration) for Group 28 airplanes.

20. In Paragraph 3.B., Work Instructions, steps 19 (Group 8-9, 11), 21 (Group 10) and 29 (Group 20), changed the figure reference for the W5156 wire bundle from FIGURE 12 to FIGURE 38.

21. In Paragraph 3.B., Work Instructions, steps 20 (Group 30-32), 26 (Group 16) and 27 (Group 17-18), changed the figure reference for the W5156 wire bundle from FIGURE 52 to FIGURE 55.

22. In Paragraph 3.B., Work Instructions, step 23 (Group 13-14), changed the figure reference for the W5156 wire bundle from FIGURE 25 to FIGURE 39.

23. In Paragraph 3.B., Work Instructions, steps 20, 21 (basic configuration) and 14, 15 (high altitude configuration), added a note to say that the removal of the forward galley might be necessary to get access to the wiring shown in FIGURE 16 and FIGURE 18.

24. In Paragraph 3.B., Work Instructions, steps 12-19, 25 (basic configuration) and 19-29 (high altitude configuration), added a note to say that for airplanes that have airstairs installed, it is necessary to remove the drip shield, the airstair assembly and the airstair door to get access to the wiring shown in FIGURE 9, FIGURE 51 and FIGURE 33.

25. In Paragraph 3.B., Work Instructions, steps 29.i (basic configuration) and 32.i (high altitude configuration), changed the text.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 8 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

26. In FIGURE 2, added BAE Systems SB 233A2222-31-06.

27. In FIGURE 34, 36 and 44, changed the illustration and flag note table to add the W2508-0032-22 wire.

This is because all airplanes that get the High Altitude configuration, must have the warning lights connected to the pin 9 of the P5-16 panel.

28. In FIGURE 37, changed the illustration and deleted the flag note 5.

29. In FIGURE 40, 42, 45 and 47, changed the illustrations.

30. In FIGURE 43, changed the illustration and deleted the flag note 1.

31. In FIGURE 53, added a note.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.

Pages with no vertical lines have no important changes.

REVISION HISTORY January 07, 2010Original Issue:

June 24, 2010Revision 1:

August 18, 2011Revision 2:

March 28, 2012Revision 3:

October 31, 2013Revision 4:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 9 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 10 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

BLANK PAGE

Commercial Airplanes 737 Service Bulletin ALERT SummaryNumber: 737-31A1332Original Issue: January 07, 2010 Revision 4: October 31, 2013 ATA System: 3100 SUBJECT: INDICATING / RECORDING SYSTEMS - Aural Warning System - Installation of the Cabin Altitude Warning System and Takeoff Configuration Warning System Lights

THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH

1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OWNER.

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND This service bulletin gives instructions to remove and replace the P1-3 and P3-1 instrument panels in the flight compartment with panels that include two warning level indicator lights. These indicator lights read "TAKEOFF CONFIG" and "CABIN ALTITUDE". The installation of these lights will provide a visual indication to the flight crew in addition to the existing aural warning horn for cabin altitude and takeoff configuration alerts. The visual warning lights are intended to provide an additional indication to crews to prepare a correct takeoff configuration, respond to excessive cabin altitude and avoid confusion between the takeoff configuration and cabin altitude alerts. An unrecognized incorrect takeoff configuration or excessive cabin altitude could prevent a continued safe flight and landing.

Fleet Team Digest (FTD) 737NG-FTD-31-06004 is related to this service bulletin.

Boeing Service Related Problem (SRP) 737-SRP-31-0042 is related to this service bulletin.

NOTE: Operators may wish to incorporate service bulletin 737-21-1165 concurrently with this service bulletin due to common access requirements.

As a part of a service bulletin validation program, this change was completed on airplane YA010 by Service Bulletin 737-31A1332 Original Issue before the release of Revision 1 of this service bulletin. The change completed on airplane YA010 by Service Bulletin 737-31A1332 Original Issue is equivalent to the release of Revision 1 of this service bulletin. Airplane YA010 has the configuration of a Group 1 airplane.

As a part of a service bulletin validation program, this change was completed on airplane YG035 by Service Bulletin 737-31A1332 Revision 1 before the release of Revision 2 of this service bulletin. The change completed on airplane YG035 by Service Bulletin 737-31A1332 Revision 1 is equivalent to the release of Revision 2 of this service bulletin. Airplane YG035 has the configuration of a Group 8 airplane.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 11 of 306

This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.

ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedYesSpares Affected Paragraph 1.E., Compliance and Paragraph

1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedYesAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION (PRR 38275-118S) Group 1, 3, 5-6, 8-12, 20, 26:

Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the "TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and W0003 wire bundles.

Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit breaker C01698. Change the W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054 wire bundles. On the E1-1 electronics shelf, change the W0111 wire bundle. Change the W2103 wire bundle. Change the W2218 wire bundle.

Group 8-11, 16-18, 20, 30-32:

In the flight compartment, replace the existing P5-16 and P5-10 panels. At the lower forward fuselage, open the Forward Access Door 112A to get access into the area forward of the nose landing gear wheel well. On the ceiling of the forward electronics compartment, install the cabin high altitude warning switch S1172.

Group 12, 33:

In the flight compartment, replace the existing P5-16 panel.

Group 7, 13-15, 19, 21:

Get access to the flight compartment. Remove the INOP markers from the "TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights and replace the "TAKEOFF CONFIG" lights on the P1 and P3 panels. On the P6-2 panel, install a new circuit breaker C01698. Change the W5156 and W5514 wire bundles. Change the W0040 and W0054 wire bundles. On the E1-1 electronics shelf, change the W0111 wire bundle. Change the W2103 wire bundle. Change the W2218 wire bundle.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 07, 2010 737-31A1332Revision 4: October 31, 2013 12 of 306 BOEING SERVICE BULLETIN 737-31A1332

ALERTALERT

Pages 13–24 of 306