Copy · RB-737-53A1384-00 RB---BOEING · 87 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0788; AD 2022-11-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'a25353f0d497514e30ddb62ef13050b7965dea6121c7e2a15502fdc9781bc5ed'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 737 Requirements Bulletin ALERT Number: 737-53A1384 RB Original Issue: September 10, 2020 ATA System: 5311 SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station 727 Bulkhead - Fastener Inspection and Repair Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

Copyright © 2020 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: September 10, 2020 737-53A1384 RB 1 of 87

5.0

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 2 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

BLANK PAGE

Table of Contents

1. EFFECTIVITY5

A. Airplanes5

B. Spares Affected6

2. CONCURRENT REQUIREMENTS6

3. COMPLIANCE6

4. APPROVAL21

5. ACCOMPLISHMENT INSTRUCTIONS23

A. General Information23

B. Work Instructions24

FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,

SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION40

FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL

INSPECTION46

FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION

.53

FIGURE 4: STA 727 BULKHEAD - FASTENER COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,

SKIN, LOWER CHORD AND UPPER CHORD - OPEN HOLE HIGH FREQUENCY EDDY

CURRENT (HFEC) INSPECTION60

FIGURE 5: STA 727 BULKHEAD - OUTER CHORD, UPPER CHORD AND LOWER CHORD - HIGH

FREQUENCY EDDY CURRENT INSPECTIONS AFTER NEW FASTENER INSTALLATION

.66

FIGURE 6: STA 727 BULKHEAD - INNER SKIN AT S-23 LAP SPLICE - HIGH FREQUENCY EDDY

CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTIONS AFTER

NEW FASTENER INSTALLATION72

FIGURE 7: STA 727 BULKHEAD - HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS OF THE

SKIN, FOR ANY CRACK AFTER NEW FASTENER INSTALLATION77

FIGURE 8: STA 727 BULKHEAD - FAIL-SAFE CHORD - HIGH FREQUENCY EDDY CURRENT (HFEC)

INSPECTIONS FOR ANY CRACK AFTER NEW FASTENER INSTALLATION83

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 3 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 4 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

BLANK PAGE

Commercial Airplanes 737 Requirements Bulletin ALERT Number: 737-53A1384 RB Original Issue: September 10, 2020 ATA System: 5311 SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station 727 Bulkhead - Fastener Inspection and Repair

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING

PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

1. Effectivity A. Airplanes This bulletin is applicable to 737-700, 737-800, 737-900ER Airplane(s), line number(s) 6077-6103, 6105-6113, 6115-6131, 6133-6153, 6155-6159, 6161-6187, 6190-6215, 6217-6221, 6223-6243, 6245-6249, 6251-6271, 6274-6289, 6291-6299, 6301-6307, 6309-6325, 6327, 6329, 6331-6343, 6345-6352, 6359, 6389 in 3 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.

DESCRIPTIONCONFIGURATIONGROUP 737-700 airplanes.- 1 737-900ER airplanes.- 2 737-800 airplanes.- 3 Airplane Models:

737-700, 737-800, 737-900ER GroupVariable Number 2YH684 2YH866 - YH876 GroupVariable Number 1YN758 3YQ363 - YQ365 GroupVariable Number 3YR050 3YR210 - YR211 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 5 of 87

GroupVariable Number 3YS370 3YS378 3YS465 3YS517 3YS542 3YS897 3YS945 - YS947 3YS953 - YS955 3YS966 - YS967 3YS973 - YS974 3YT120 - YT121 3YT133 3YT184 - YT185 3YT291 - YT299 3YT347 - YT354 3YT371 3YT477 3YT565 3YT575 - YT576 3YT781 3YT841 - YT843 3YT938 - YT961 GroupVariable Number 2YU055 - YU060 2YU215 - YU216 2YU302 - YU306 3YV004 3YV012 3YV021 - YV023 3YV030 - YV031 3YV052 3YV098 3YV129 - YV140 3YV251 3YV256 3YV307 - YV312 3YV363 - YV365 3YV386 - YV388 3YV391 - YV394 3YV401 3YV411 3YV441 - YV443 3YV446 3YV503 3YV579 - YV580 GroupVariable Number 3YV657 - YV661 3YV730 - YV731 3YV751 - YV755 3YV784 3YV805 - YV809 3YV904 - YV907 3YV973 - YV977 3YW051 - YW084 3YW086 3YW234 - YW238 3YW245 3YW267 - YW274 3YW283 3YW357 - YW358 3YW362 3YW372 - YW384 3YW451 - YW452 3YW471 - YW472 3YW891 - YW893 3YW907 3YW916 - YW918 3YW971 - YW973 B. Spares Affected None.

2. CONCURRENT REQUIREMENTS None.

3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin 737-53A1384 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin 737-53A1384 RB mandatory..

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 6 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

For airplanes which have incorporated Boeing Business Jet (BBJ) Lower Cabin Altitude Supplemental Type Certificate (STC) ST01697SE (6500 feet maximum cabin altitude in lieu of 8000 feet) as referenced in Boeing SB 737-21-1149, the flight cycle related compliance times are different from those specified in Requirements Bulletin 737-53A1384 RB as follows:

– For Table 1 through Table 3 the initial compliance times (thresholds) specified in flight cycles must be reduced to half of those specified in Requirements Bulletin 737-53A1384 RB – For Table 4 through Table 7 the initial compliance times (thresholds) is 28,000 Total Flight Cycles. All repeat interval compliance times specified in flight cycles must be reduced to one-quarter of those specified in Requirements Bulletin 737-53A1384 RB.

Accomplish the required actions, based on the applicable conditions in Tables 1 through 7, in accordance with Paragraph 3. Accomplishment Instructions.

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.

Group 1:

Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 34,000 total flight cycles.

Do a detailed inspection of the STA 727 bulkhead, for any incorrectly installed fastener.

All airplanes.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 34,000 total flight cycles.

Do an external and internal general visual inspection of the STA 727 bulkhead, for any repair.

CONDITION 1:

ANY INCORRECTL Y

INSTALLED FASTEN- ER FOUND.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 7 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

Group 1:

Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 34,000 total flight cycles.

CONDITION 1.1 (ACTION 1):

Contact The Boeing Company for alternative inspection(s) in the repaired area, to the Requirements Bulletin 737- 53A1384 RB and do the inspection(s) and applicable on-condition action(s). (a) CONDITION 1.1:

ANY REPAIR FOUND.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 34,000 total flight cycles.

CONDITION 1.1 (ACTION 2):

Do an open hole High Frequency Eddy Current (HFEC) inspection at each incorrectly installed fastener location at the unrepaired areas, for any crack.

-Before further flight.Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1.1.1:

ANY CRACK FOUND.

-Before further flight.Install new fastener in accordance with Structural Repair Manual (SRM) at each incorrectly installed fastener location. (b) CONDITION 1.1.2:

NO CRACK FOUND.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 34,000 total flight cycles.

Do an open hole HFEC inspection at each incorrectly installed fastener location, for any crack.

CONDITION 1.2:

NO REPAIR FOUND.

-Before further flight.Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1.2.1:

ANY CRACK FOUND.

-Before further flight.Install new fastener in accordance with Structural Repair Manual (SRM) at each incorrectly installed fastener location. (b) CONDITION 1.2.2:

NO CRACK FOUND.

-Before 36,000 total flight cycles.Do an external and internal general visual inspection of the STA 727 bulkhead, for any repair.

CONDITION 2:

NO INCORRECTL Y

INSTALLED FASTEN- ER FOUND.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 8 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

Group 1:

Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Before 36,000 total flight cycles.Contact The Boeing Company for alternative inspection(s) in the repaired area, to the Requirements Bulletin 737- 53A1384 RB and do the inspection(s) and applicable on-condition action(s). (a) CONDITION 2.1:

ANY REPAIR FOUND.

--No further action required by Requirements Bulletin 737- 53A1384 RB.

CONDITION 2.2:

NO REPAIR FOUND.

(a) It is not required to contact The Boeing Company if the repair that covers the affected inspection zone provided all of the following conditions are met:

1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB AND

2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA) via a FAA Form 8100-9.

(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.

Group 2:

Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 26,000 total flight cycles.

Do a detailed inspection of the STA 727 bulkhead, for any incorrectly installed fastener.

All airplanes.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 26,000 total flight cycles.

Do an external and internal general visual inspection of the STA 727 bulkhead, for any repair.

CONDITION 1:

ANY INCORRECTL Y

INSTALLED FASTEN- ER FOUND.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 9 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

Group 2:

Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 26,000 total flight cycles.

CONDITION 1.1 (ACTION 1):

Contact The Boeing Company for alternative inspection(s) in the repaired area, to the Requirements Bulletin 737- 53A1384 RB, do the inspection(s) and applicable on-condition action(s). (a) CONDITION 1.1:

ANY REPAIR FOUND.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 26,000 total flight cycles.

CONDITION 1.1 (ACTION 2):

Do an open hole High Frequency Eddy Current (HFEC) inspection at each incorrectly installed fastener location at the unrepaired areas, for any crack.

-Before further flight.Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1.1.1:

ANY CRACK FOUND.

-Before further flight.Install new fastener in accordance with Structural Repair Manual (SRM) at each incorrectly installed fastener location. (b) CONDITION 1.1.2:

NO CRACK FOUND.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 26,000 total flight cycles.

Do an open hole HFEC inspection at each incorrectly installed fastener location, for any crack.

CONDITION 1.2:

NO REPAIR FOUND.

-Before further flight.Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1.2.1:

ANY CRACK FOUND.

-Before further flight.Install new fastener in accordance with Structural Repair Manual (SRM) at each incorrectly installed location. (b) CONDITION 1.2.2:

NO CRACK FOUND.

-Before 36,000 total flight cycles.Do an external and internal general visual inspection of the STA 727 bulkhead, for any repair.

CONDITION 2:

NO INCORRECTL Y

INSTALLED FASTEN- ER FOUND.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 10 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

Group 2:

Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Before 36,000 total flight cycles.Contact The Boeing Company for alternative inspection(s) in the repaired area, to the Requirements Bulletin 737- 53A1384 RB, do the inspection(s) and applicable on-condition action(s). (a) CONDITION 2.1:

ANY REPAIR FOUND.

--No further action required by Requirements Bulletin 737- 53A1384 RB.

CONDITION 2.2:

NO REPAIR FOUND.

(a) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided all of the following conditions are met:

1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB AND

2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA) via a FAA Form 8100-9.

(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.

Group 3:

Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 36,000 total flight cycles.

Do a detailed inspection of the STA 727 bulkhead, for any incorrectly installed fastener.

All airplanes.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 36,000 total flight cycles.

Do an external and internal general visual inspection of the STA 727 bulkhead, for any repair.

CONDITION 1:

ANY INCORRECTL Y

INSTALLED FASTEN- ER FOUND.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 11 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

Group 3:

Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 36,000 total flight cycles.

CONDITION 1.1 (ACTION 1):

Contact The Boeing Company for alternative inspection(s) in the repaired area, to the Requirements Bulletin 737- 53A1384 RB and do the inspection(s) and applicable on condition action(s). (a) CONDITION 1.1:

ANY REPAIR FOUND.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 36,000 total flight cycles.

CONDITION 1.1 (ACTION 2):

Do an open hole High Frequency Eddy Current (HFEC) inspection at each incorrectly installed fastener location at the unrepaired areas, for any crack.

-Before further flight.Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1.1.1:

ANY CRACK FOUND.

-Before further flight.Install new fastener in accordance with Structural Repair Manual (SRM) at each incorrectly installed fastener location. (b) CONDITION 1.1.2:

NO CRACK FOUND.

-Within 3,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1384 RB.

Before 36,000 total flight cycles.

Do an open hole HFEC inspection at each incorrectly installed fastener location, for any crack.

CONDITION 1.2:

NO REPAIR FOUND.

-Before further flight.Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1.2.1:

ANY CRACK FOUND.

-Before further flight.Install new fastener in accordance with Structural Repair Manual (SRM) at each incorrectly installed fastener location. (b) CONDITION 1.2.2:

NO CRACK FOUND.

-Before 36,000 total flight cycles.Do an external and internal general visual inspection of the STA 727 bulkhead, for any repair.

CONDITION 2:

NO INCORRECTL Y

INSTALLED FASTEN- ER FOUND.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: September 10, 2020 737-53A1384 RB 12 of 87 REQUIREMENTS BULLETIN 737-53A1384

ALERTALERT

Pages 13–24 of 87