TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '95d4b345e210c2e2f218c5d8491770b7fc41cbda5136434456d6b58f8d1213c7' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '95d4b345e210c2e2f218c5d8491770b7fc41cbda5136434456d6b58f8d1213c7' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 737 Requirements Bulletin ALERT Number: 737-53A1388 RB Original Issue: October 27, 2020 ATA System: 5311 SUBJECT: FUSELAGE - Frames and Bulkheads - STA 360 to STA 520 and STA 727A to STA 907, between Stringer S-13 and Stringer S-14, Frame Splice Inspections Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: October 27, 2020 737-53A1388 RB 1 of 113
3.0
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 2 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
BLANK PAGE
Table of Contents
1. EFFECTIVITY5
A. Airplanes5
B. Spares Affected6
2. CONCURRENT REQUIREMENTS7
3. COMPLIANCE7
4. APPROVAL16
5. ACCOMPLISHMENT INSTRUCTIONS17
A. General Information17
B. Work Instructions18
FIGURE 1: GVI - FRAME SPLICE BETWEEN S-13L AND S-14L - LEFT SIDE [Group 1]34
FIGURE 2: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE [Group 1] . . . 37 FIGURE 3: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH
DOUBLER) - LEFT SIDE [Group 1]41
FIGURE 4: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE [Group 1]45
FIGURE 5: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE [Group 1] . . 48 FIGURE 6: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R - (WITH
DOUBLER) - RIGHT SIDE [Group 1]52
FIGURE 7: GVI - FRAME SPLICES BETWEEN S-13L AND S-14L - LEFT SIDE [Group 2]57
FIGURE 8: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE [Group 2] . . . 60 FIGURE 9: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (AT STA
500C) - LEFT SIDE [Group 2]64
FIGURE 10: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH
DOUBLER) - LEFT SIDE [Group 2]68
FIGURE 11: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE [Group 2]72
FIGURE 12: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE [Group 2] . . 75 FIGURE 13: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (AT STA
500C) - RIGHT SIDE [Group 2]79
FIGURE 14: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (AT STA
847) - RIGHT SIDE [Group 2]83
FIGURE 15: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITH
DOUBLER OTHER THAN STA 500C AND STA 847) - RIGHT SIDE [Group 2]87
FIGURE 16: GVI - FRAME SPLICES BETWEEN S-13L AND S-14L - LEFT SIDE [Group 3]91
FIGURE 17: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE [Group 3] . . . 94 FIGURE 18: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH
DOUBLER) - LEFT SIDE [Group 3]98
FIGURE 19: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE [Group 3]102
FIGURE 20: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE [Group 3] . 105 FIGURE 21: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITH
DOUBLER) - RIGHT SIDE [Group 3]109
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 3 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 4 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
BLANK PAGE
Commercial Airplanes 737 Requirements Bulletin ALERT Number: 737-53A1388 RB Original Issue: October 27, 2020 ATA System: 5311 SUBJECT: FUSELAGE - Frames and Bulkheads - STA 360 to STA 520 and STA 727A to STA 907, between Stringer S-13 and Stringer S-14, Frame Splice Inspections
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity A. Airplanes This bulletin is applicable to 737-300, 737-400, 737-500 Airplane(s), line number(s) 2566-3132 in 3 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
DESCRIPTIONCONFIGURATIONGROUP 737-300 Airplanes.- 1 737-400 Airplanes.- 2 737-500 Airplanes.- 3 Airplane Models:
737-300, 737-400, 737-500 GroupVariable Number 2PJ553 - PJ561 2PJ601 - PJ615 2PJ811 GroupVariable Number 2PJ816 - PJ817 1PM548 - PM550 1PP518 - PP520 GroupVariable Number 1PP876 - PP877 1PQ297 - PQ299 1PQ345 - PQ348 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 5 of 113
GroupVariable Number 1PQ370 - PQ373 1PQ391 - PQ395 1PQ409 - PQ410 1PQ414 - PQ418 1PQ431 - PQ438 1PQ447 - PQ448 1PQ451 1PQ454 1PQ474 - PQ475 1PQ772 1PQ933 - PQ935 1PQ951 1PQ971 - PQ997 1PR001 - PR017 1PR021 - PR034 1PR041 - PR045 1PR061 - PR072 1PR077 - PR082 1PR091 - PR092 1PR096 1PR101 1PR121 - PR122 1PR131 - PR132 1PR141 - PR143 1PR161 - PR172 1PR181 1PS617 - PS630 1PS704 - PS706 1PS763 - PS799 1PS811 GroupVariable Number 1PS836 - PS837 1PS841 - PS846 1PS851 - PS852 1PS856 1PS861 - PS863 1PS866 - PS868 1PS871 - PS874 1PS896 - PS897 1PS901 - PS941 1PS956 - PS957 1PS961 - PS963 1PS971 - PS978 3PT012 - PT015 3PT029 - PT031 3PT126 - PT138 3PT188 3PT307 - PT309 3PT513 - PT517 3PT585 - PT586 3PT643 - PT644 3PT656 3PT681 - PT685 3PT716 - PT717 3PT721 - PT725 3PT801 - PT834 3PT851 - PT854 3PT871 - PT886 3PT901 - PT930 3PT971 - PT973 3PT981 - PT985 GroupVariable Number 3PT996 3PU301 3PU311 - PU313 2PV204 - PV209 2PV226 - PV229 2PV284 - PV287 2PV296 2PV301 - PV302 2PV351 2PV356 - PV357 2PW086 - PW088 2PW168 - PW171 2PW246 - PW252 2PW262 - PW264 2PW271 - PW276 2PW285 - PW292 2PW401 - PW408 2PW411 - PW418 2PW421 - PW424 2PW431 - PW435 2PW441 - PW450 2PW521 - PW522 2PW524 - PW525 2PW527 - PW530 2PW547 - PW550 2PW621 - PW622 2PW635 - PW637 2PW831 2PW851 - PW856 -- B. Spares Affected None.
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 6 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
2. CONCURRENT REQUIREMENTS None.
3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin 737-53A1388 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin 737-53A1388 RB mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.
Accomplish the required action(s), based on the applicable condition(s) in Table(s) 1 and 2, in accordance with the Accomplishment Instructions.
Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 - Left Side Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition -Within 5,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1388 RB.
Before 40,000 total flight cycles.
Do a GVI of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any repair.
All airplanes -Within 5,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1388 RB.
Before 40,000 total flight cycles.
ACTION 1:
Contact The Boeing Company for alternative inspection(s) to the Requirements Bulletin 737- 53A1388 RB for the repaired areas, and do the inspection(s) at the repaired areas and applicable on-condition action(s).
(a) CONDITION 1:
ANY REPAIR FOUND -Within 5,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1388 RB.
Before 40,000 total flight cycles.
ACTION 2:
Do HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack at the unrepaired areas.
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 7 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 - Left Side Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition -Before further flight.ACTION 1:CONDITION 1.1:
Contact The Boeing Company for repair instructions and do the repair.
ANY CRACK FOUND IN
THE UPPER FRAME 6,000-ACTION 2:
flight cycles.Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) -Before further flight.ACTION 1:CONDITION 1.2:
Remove the cracked doubler.
ANY CRACK FOUND IN
THE DOUBLER -Before further flight.ACTION 2:
At the frame where the cracked doubler was removed, do an open hole HFEC inspection at all fastener hole locations where a fastener was removed for any crack.
-Before further flight.ACTION 1:CONDITION 1.2.1:
Contact The Boeing Company for repair instructions and do the repair.
ANY CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION -Before further flight.ACTION 2:
Install a replacement doubler where a cracked doubler was removed.
6,000-ACTION 3:
flight cycles.Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 8 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 - Left Side Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition -Before further flight.ACTION 1:CONDITION 1.2.2:
Install a replacement doubler where a cracked doubler was removed.
NO CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION 6,000-ACTION 2:
flight cycles.Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) 6,000-Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) CONDITION 1.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND DOUBLER flight cycles.
-Within 5,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1388 RB.
Before 40,000 total flight cycles.
Do HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
CONDITION 2:
NO REPAIR FOUND -Before further flight.ACTION 1:CONDITION 2.1:
Contact The Boeing Company for repair instructions and do the repair.
ANY CRACK FOUND IN
THE UPPER FRAME 6,000-ACTION 2:
flight cycles.Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 9 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 - Left Side Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition -Before further flight.ACTION 1:CONDITION 2.2:
Remove the cracked doubler.
ANY CRACK FOUND IN
THE DOUBLER -Before further flight.ACTION 2:
At the frame where the cracked doubler was removed, do an open hole HFEC inspection at all fastener hole locations where a fastener was removed for any crack.
-Before further flight.ACTION 1:CONDITION 2.2.1:
Contact The Boeing Company for repair instructions and do the repair.
ANY CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION -Before further flight.ACTION 2:
Install a replacement doubler where a cracked doubler was removed.
6,000-ACTION 3:
flight cycles.Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) -Before further flight.ACTION 1:CONDITION 2.2.2:
Install a replacement doubler where a cracked doubler was removed.
NO CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION 6,000-ACTION 2:
flight cycles.Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 10 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 - Left Side Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition 6,000-Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) CONDITION 2.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND THE DOUBLER flight cycles.
(a) It is not required to contact The Boeing Company if a repair covers the affected inspection zone provided all of the following conditions are met:
1. The repair is installed after the Original Issue date of Requirements Bulletin 737-53A1388 RB, AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA) via a FAA Form 8100-9.
(b) It is not required to do the HFEC surface inspection in areas where a repair covers the affected inspection area if the repair meets the conditions that follow:
1. The repair is the corrective action to the crack condition identified in Requirements Bulletin 737- 53A1388 RB and installed after the Original Issue date of Requirements Bulletin 737-53A1388
RB, AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA) via a FAA Form 8100-9.
Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 - Right Side Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition -Within 5,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1388 RB.
Before 40,000 total flight cycles.
Do a GVI of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any repair.
All airplanes Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 11 of 113 REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 - Right Side Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later ) ActionCondition -Within 5,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1388 RB.
Before 40,000 total flight cycles.
ACTION 1:
Contact The Boeing Company for alternative inspection(s) to the Requirements Bulletin 737- 53A1388 RB for the repaired areas, and do the inspection(s) at the repaired areas and applicable on-condition action(s).
(a) CONDITION 1:
ANY REPAIR FOUND -Within 5,000 flight cycles after the Original Issue date of Requirements Bulletin 737- 53A1388 RB.
Before 40,000 total flight cycles.
ACTION 2:
Do HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack at the unrepaired areas.
-Before further flight.ACTION 1:CONDITION 1.1:
Contact The Boeing Company for repair instructions and do the repair.
ANY CRACK FOUND IN
THE UPPER FRAME 6,000-ACTION 2:
flight cycles.Repeat HFEC surface inspections of the frame splices (upper frame and doubler) between S-13 and S-14, from STA 360 to STA 520 and STA 727A to STA 907 for any crack.
(b) Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 27, 2020 737-53A1388 RB 12 of 113 REQUIREMENTS BULLETIN 737-53A1388