Copy · 757-25A0319-00 RB Original Issue 3-24-23 · 177 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-2003; AD 2024-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'b3cff31c340c059462955105d6b17f01f1087c6d1d84cacb415782320444bca1'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 757 Requirements Bulletin ALERT Number: 757-25A0319 RB Original Issue: March 24, 2023 ATA System: 2550 SUBJECT: EQUIPMENT/FURNISHINGS - Cargo Compartments - Blowout Panel and Bulkhead Grille Assembly Change EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.

9E991ECCN:

Copyright © 2023 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: March 24, 2023 757-25A0319 RB 1 of 177

4.0

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 2 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

BLANK PAGE

Table of Contents

1 . E F F E C T I V I T Y5

A. Airplanes5

B . S p a r e s A f f e c t e d7

2. CONCURRENT REQUIREMENTS7

3 . C O M P L I A N C E7

4. APPROVAL ................................................ 2 1

5. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 3 A. General Information ......................................... 2 3 B. Work Instructions ........................................... 2 4 FIGURE 3: STA 1640 - BULKHEAD PANEL ASSEMBLY INSTALLATION [Group 1, Configuration 1] . 58 FIGURE 14: LANYARD - DETAILED INSPECTION [Group 1-2, 4-6] ................... 6 8 FIGURE 15: PANEL - 453N1835-8 - DETAILED INSPECTION [Group 1-2, 4, 6] ............. 6 9 FIGURE 16: BLOWOUT PANEL ASSY, SQUARE, RELIEF VALVES - 453N1623-8 OR 453N1623-10 OR 453N1623-12 - DETAILED INSPECTION [Group 1-2, 4-6] ................. 7 0 FIGURE 17: BLOWOUT PANEL ASSY, RECTANGULAR, RELIEF VALVES - 453N1623-9 OR 453N1623-11 OR 453N1623-14 - DETAILED INSPECTION [Group 1-2, 4, 6] ............... 7 5 FIGURE 18: RETAINER - 453N1625-5 - DETAILED INSPECTION [Group 1-2, 4-6] ........... 8 0 FIGURE 19: RETAINER, RECTANGULAR - 453N1625-11 - DETAILED INSPECTION [Group 1-2, 4, 6] . 82 FIGURE 20: GRILLE - BLOWOUT PANEL, BILLET, SQUARE- 453N1639-1 - DETAILED INSPECTION [Group 1-2, 4-6] ......................................... 8 3 FIGURE 21: GRILLE - BLOWOUT PANEL, BILLET, RECTANGLE - 453N1639-2 - DETAILED INSPECTION [Group 1-2, 4, 6] ........................................ 8 5 FIGURE 22: STA 560 E5 EE RACK BULKHEAD - PANEL ASSEMBLY - 453N1637-4 - DETAIL INSPECTION [Group 1-2, 4, 6] ........................................ 8 6 FIGURE 23: VALVE ASSEMBLY - 65-4704-5 - DETAILED INSPECTION [Group 3, 5] ......... 8 8 FIGURE 24: SPACER RING - 65-15274-3 - DETAILED INSPECTION [Group 3, 5] ........... 9 2 FIGURE 25: BULKHEAD GRILLE ASSEMBLY - 69-4337-1 - DETAILED INSPECTION [Group 3, 5] . . 93 FIGURE 26: PANEL ASSEMBLY - 453A1512-1 - DETAILED INSPECTION [Group 3, 5] ........ 9 5 FIGURE 27: PANEL ASSEMBLY - 453N1164-40 - DETAILED INSPECTION [Group 3] ......... 9 7 FIGURE 31: STA 508-530 RIGHT SIDE SIDEWALL - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1 - 2 , 4 , 6 ] ............................................ 9 9 FIGURE 32: STA 845 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2, 4-6] . . 101 FIGURE 33: STA 845 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2, 4-6] . . 110 FIGURE 34: STA 1200 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2, 4-6] . 112 FIGURE 35: STA 1640 BULKHEAD - DOUBLER - INSTALLATION [Group 4] ............. 1 1 5 FIGURE 36: STA 1640 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2] .... 1 1 7 FIGURE 37: STA 1640 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 4] ..... 1 1 9 FIGURE 40: CEILING BLOWOUT PANEL - INSPECTION [Group 1-2, 4, 6] .............. 1 2 1 FIGURE 41: CAP STRIP - 453N1700-7 - INSPECTION [Group 1-2, 4, 6] ................ 1 2 3 FIGURE 42: CAP STRIP - 453N1700-8 - INSPECTION [Group 1-2, 4, 6] ................ 1 2 5 FIGURE 43: CAP STRIP - 453N1700-10 - INSPECTION [Group 1-2, 4, 6] ............... 1 2 7 FIGURE 44: FORWARD LOWER LOBE CARGO COMPARTMENT - CEILING - FOAM RUBBER SEAL AND CAP STRIP INSPECTION [Group 1-2, 4, 6] ......................... 1 2 8 FIGURE 45: AFT LOWER LOBE CARGO COMPARTMENT - CEILING - FOAM RUBBER SEAL AND CAP STRIP INSPECTION [Group 1-2, 4, 6] ............................ 1 3 1 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 3 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

FIGURE 46: FORWARD LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL - INSTALLATION [Group 1-2, 4, 6] .............................. 1 3 4 FIGURE 47: AFT LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL - INSTALLATION [Group 1-2, 4, 6] ........................................ 1 3 7 FIGURE 48: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 508 - 530 RIGHT SIDE SIDEWALL

- INSTALLATION INSPECTION [Group 1-2, 4, 6] ...................... 1 4 1 FIGURE 49: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 845 BULKHEAD - INSTALLATION INSPECTION [Group 1-2, 4-6] ................................ 1 4 3 FIGURE 50: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 845 BULKHEAD - INSTALLATION INSPECTION [Group 1-2, 4-6] ................................ 1 5 0 FIGURE 51: AFT LOWER LOBE CARGO COMPARTMENT - STA 1200 BULKHEAD - INSTALLATION INSPECTION [Group 1-2, 4-6] ................................ 1 5 2 FIGURE 52: AFT LOWER LOBE CARGO COMPARTMENT - STA 1640 BULKHEAD - INSTALLATION INSPECTION [Group 1-2] .................................. 1 5 4 FIGURE 53: AFT LOWER LOBE CARGO COMPARTMENT - STA 1640 BULKHEAD - INSTALLATION INSPECTION [Group 4] .................................... 1 5 6 FIGURE 54: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 845 BULKHEAD - INSTALLATION INSPECTION [Group 3] .................................... 1 5 8 FIGURE 55: AFT LOWER LOBE CARGO COMPARTMENT - STA 1180 + 20 BULKHEAD - INSTALLATION INSPECTION [Group 3] .................................... 1 6 1 FIGURE 56: AFT LOWER LOBE CARGO COMPARTMENT - STA 1600 - 1640 - INSTALLATION INSPECTION [Group 3, 5] .......................................... 1 6 4 FIGURE 57: FORWARD LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL - INSTALLATION INSPECTION [Group 1-2, 4, 6] ...................... 1 6 7 FIGURE 58: AFT LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL - INSTALLATION INSPECTION [Group 1-2, 4, 6] ................................ 1 7 0 APPENDIX C: DETAILED INSPECTION OF PARTS [Group 3] ...................... 1 7 3 APPENDIX D: DETAILED INSPECTION OF PARTS [Group 5] ...................... 1 7 4 APPENDIX E: DETAILED INSPECTION OF PARTS [Group 1-2, 4, 6] ................... 1 7 5 APPENDIX H: REPAIR/REPLACEMENT OF DAMAGED PARTS/ASSEMBLIES ............. 1 7 6 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 4 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

Commercial Airplanes 757 Requirements Bulletin ALERT Number: 757-25A0319 RB Original Issue: March 24, 2023 ATA System: 2550 SUBJECT: EQUIPMENT/FURNISHINGS - Cargo Compartments - Blowout Panel and Bulkhead Grille Assembly Change

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING

PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

1. Effectivity A. Airplanes This bulletin is applicable to 757-200, 757-200CB, 757-200PF, 757-300 Airplane(s), line number(s) 2-782, 784-786, 788-823, 825-828, 830-1050 in 6 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive",

e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.

The Variable Numbers and Group Information for the applicable airplanes is given below.

DESCRIPTIONCONFIGURATIONGROUP 757-200 and -200CB airplanes that may have done any revision of SB 757-25-0157.

-1 Airplanes that have not done any revision of SB 757-25-0157.1 Airplanes that have done any revision of SB 757-25-0157.2 757-200 airplanes that do not need doublers for the STA 1640 rigid bulkhead decompression panel installation.

-2 757-300 airplanes.-3 757-200 airplanes that need doublers for the STA 1640 rigid bulkhead decompression panel installation.

-4 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 5 of 177

DESCRIPTIONCONFIGURATIONGROUP 757-200 airplanes with a vacuum waste system.-5 757-200PF airplanes.-6 Airplane Models:

757-200, 757-200CB, 757-200PF, 757-300 GroupVariable Number 1NA002 - NA028 1NA191 - NA199 4NA201 - NA233 2NA234 - NA236 1NA237 - NA238 2NA239 1NA301 - NA305 2NA341 - NA352 4NA391 - NA394 2NA395 - NA399 1NA401 - NA408 1NA441 - NA447 1NA501 - NA584 2NA585 - NA586 1NB001 - NB004 1NB021 - NB023 1NB036 - NB041 1NB051 - NB053 1NB061 - NB073 1NB079 1NB131 - NB148 2NB161 - NB162 1NB166 - NB168 1NB201 - NB204 1NB221 GroupVariable Number 2NB222 - NB228 2NB230 2NB236 1NB239 1NB261 - NB267 1NB291 - NB298 2NB299 2NB301 - NB302 1NB311 - NB312 1NB321 - NB331 1NB421 - NB437 2NB438 2NB446 1NB451 - NB453 2NB454 1NB501 - NB513 2NB514 - NB523 2NB561 2NB571 2NB581 - NB583 1NC001 - NC033 1NC041 - NC042 1NC051 - NC052 1NC056 - NC057 2NC058 - NC062 GroupVariable Number 1NC066 - NC071 2NC072 - NC084 2NC091 - NC094 2NC151 2NC161 6NC901 - NC951 6NC971 - NC974 1ND001 - ND007 1ND011 - ND059 2ND111 - ND113 1ND161 - ND189 2ND190 - ND199 1ND201 - ND203 1ND221 - ND223 2ND224 - ND225 1ND241 - ND248 1ND301 - ND303 2ND304 - ND322 2ND401 1ND891 1ND895 1NE001 - NE005 2NE006 - NE008 1NE011 - NE088 2NE091 - NE094 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 6 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

GroupVariable Number 1NE141 - NE150 1NE161 - NE177 1NE201 - NE204 1NE301 - NE302 2NE311 - NE325 5NJ001 - NJ004 5NJ031 - NJ032 5NJ551 - NJ555 3NL001 - NL002 3NL006 - NL017 3NL101 - NL109 3NL141 3NL601 - NL616 5NN001 - NN002 5NN051 - NN052 GroupVariable Number 6NS601 - NS616 6NT001 - NT009 2NT201 - NT202 2NT231 - NT234 2NT237 - NT240 2NT242 2NT245 - NT248 2NT281 - NT289 2NT341 - NT347 2NT351 - NT360 2NT371 - NT373 2NT375 - NT379 2NT381 - NT386 2NT401 - NT409 2NT411 - NT412 GroupVariable Number 2NT426 - NT427 2NT431 - NT432 2NT436 - NT438 2NT441 - NT442 2NT446 2NT701 - NT769 2NT791 - NT796 2NT861 - NT862 2NT881 - NT885 2NT901 - NT916 2NT971 - NT985 2NU031 - NU038 3NU701 - NU705 3NU721 - NU728 3NU731 - NU732 B. Spares Affected None.

2. CONCURRENT REQUIREMENTS None.

3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin 757-25A0319 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin 757-25A0319 RB mandatory.

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.

Accomplish the required action(s), based on the applicable condition(s) in Table 1 through Table 7, in accordance with Accomplishment Instructions.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 7 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

Group 1, Configuration 1:

Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.

Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Within 16 months after the original issue date of Requirements Bulletin 757-25A0319 RB.

Within 5,425 Flight Hours after the original issue date of Requirements Bulletin 757- 25A0319 RB.

Do a Detailed Inspection (DET) of certain bulkhead, sidewall and ceiling decompression panels in the forward and aft lower lobe cargo compartments for any damage. (a) All airplanes.

-Before further flight.CONDITION 1 (ACTION 1):CONDITION 1:

Repair or replace any damaged decompression panels with new or serviceable decompression panels at the affected location.

ANY DECOMPRES-

SION PANEL DAMAGE FOUND.

-Before further flight.CONDITION 1 (ACTION 2):

Install decompression panels with billet grilles on the bulkheads and sidewalls of the forward and aft lower lobe cargo compartments.

-Before further flight.CONDITION 1 (ACTION 3):

Install decompression panels on the ceilings of the forward and aft lower lobe cargo compartments.

9,000 flight hours or 26 months, whichever occurs first.

-CONDITION 1 (ACTION 4):

Repeat the DET of certain bulkhead, sidewall and ceiling decompression panels in the forward and aft lower lobe cargo compartments for any damage. (a) Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 8 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

Group 1, Configuration 1:

Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.

Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.CONDITION 2 (ACTION 1):CONDITION 2:

Install decompression panels with billet grilles on the bulkheads and sidewalls of the forward and aft lower lobe cargo compartments.

NO DECOMPRES-

SION PANEL DAMAGE FOUND.

-Before further flight.CONDITION 2 (ACTION 2):

Install decompression panels on the ceilings of the forward and aft lower lobe cargo compartments.

9,000 flight hours or 26 months, whichever occurs first.

-CONDITION 2 (ACTION 3):

Repeat the DET of certain bulkhead, sidewall and ceiling decompression panels in the forward and aft lower lobe cargo compartments for any damage. (a)

(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:

Forward lower lobe cargo compartment:

1. Decompression panel(s) located at STA 845 bulkhead.

2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall, if installed.

3. Decompression panel(s) located between STA 560-845, ceiling.

4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead, if installed.

Aft lower lobe cargo compartment:

1. Decompression panel(s) located at STA 1200 bulkhead.

2. Decompression panel(s) located between STA 1200-1640, ceiling.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 9 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

Group 1, Configuration 1:

Table 2: Detailed Inspection Of Decompression Panels At The STA 1640 Bulkhead And Replacement of the Soft Bulkhead with Rigid Bulkhead that has Decompression Panel Assemblies with Billet Grilles.

Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Within 16 months after the original issue date of Requirements Bulletin 757-25A0319 RB.

Within 5,425 Flight Hours after the original issue date of Requirements Bulletin 757- 25A0319 RB.

ACTION 1:

Replace the STA 1640 soft bulkhead with a rigid bulkhead that has decompression panels with billet grilles installed.

All airplanes.

-Within 26 months after ACTION 1 was done.

Within 9,000 flight hours after ACTION 1 was done.

ACTION 2 :

Do a Detailed Inspection (DET) of STA 1640 bulkhead decompression panels for any damage.

-Before further flight.CONDITION 3 (ACTION 1):CONDITION 3:

Repair or replace any damaged decompression panels with new or serviceable decompression panels.

ANY DECOMPRES-

SION PANEL DAMAGE FOUND.

9,000 flight hours or 26 months, whichever occurs first.

-CONDITION 3 (ACTION 2):

Repeat the DET of STA 1640 bulkhead decompression panels for any damage.

-Before further flight.CONDITION 4 (ACTION 1):CONDITION 4:

Install decompression panels with billet grilles on the STA 1640 bulkhead.

NO DECOMPRES-

SION PANEL DAMAGE FOUND.

9,000 flight hours or 26 months, whichever occurs first.

-CONDITION 4 (ACTION 2):

Repeat the DET of STA 1640 bulkhead decompression panels for any damage.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 10 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

Group 1, Configuration 2; Group 2:

Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.

Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Within 16 months after the original issue date of Requirements Bulletin 757-25A0319 RB.

Within 5,425 Flight Hours after the original issue date of Requirements Bulletin 757- 25A0319 RB.

Do a Detailed Inspection (DET) of certain bulkhead, sidewall and ceiling decompression panels in the forward and aft lower lobe cargo compartments for any damage. (a) All airplanes.

-Before further flight.CONDITION 5 (ACTION 1):CONDITION 5:

Repair or replace any damaged decompression panels with new or serviceable decompression panels at the affected location.

ANY DECOMPRES-

SION PANEL DAMAGE FOUND.

-Before further flight.CONDITION 5 (ACTION 2):

Install decompression panels with billet grilles on the bulkheads and sidewalls of the forward and aft lower lobe cargo compartments.

-Before further flight.CONDITION 5 (ACTION 3):

Install decompression panels on the ceilings of the forward and aft lower lobe cargo compartments.

9,000 flight hours or 26 months, whichever occurs first.

-CONDITION 5 (ACTION 4):

Repeat the DET of certain bulkhead, sidewall and ceiling decompression panels in the forward and aft lower lobe cargo compartments for any damage. (a) Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 11 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

Group 1, Configuration 2; Group 2:

Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.

Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Before further flight.CONDITION 6 (ACTION 1):CONDITION 6:

Install decompression panels with billet grilles on the bulkheads and sidewalls of the forward and aft lower lobe cargo compartments.

NO DECOMPRES-

SION PANEL DAMAGE FOUND.

-Before further flight.CONDITION 6 (ACTION 2):

Install decompression panels on the ceilings of the forward and aft lower lobe cargo compartments.

9,000 flight hours or 26 months, whichever occurs first.

-CONDITION 6 (ACTION 3):

Repeat the DET of certain bulkhead, sidewall and ceiling decompression panels in the forward and aft lower lobe cargo compartments for any damage. (a)

(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:

Forward lower lobe cargo compartment:

1. Decompression panel(s) located at STA 845 bulkhead.

2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall, if installed.

3. Decompression panel(s) located between STA 560-845, ceiling.

4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead, if installed.

Aft lower lobe cargo compartment:

1. Decompression panel(s) located at STA 1200 bulkhead.

2. Decompression panel(s) located at STA 1640 bulkhead.

3. Decompression panel(s) located between STA 1200-1640, ceiling.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 24, 2023 757-25A0319 RB 12 of 177 REQUIREMENTS BULLETIN 757-25A0319

ALERTALERT

Pages 13–24 of 177