TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '3b90a0a8704886c72dc66bdb28435cd89ad8a34d3392e341f32b84d638af65a0' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '3b90a0a8704886c72dc66bdb28435cd89ad8a34d3392e341f32b84d638af65a0' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 757 Service Bulletin Number: 757-27A0152 Original Issue: April 29, 2009 Revision 3: October 28, 2013 ATA System: 2760 SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings - New Spoiler Control Module Relay Installation Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2009 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 1 of 194
3.0
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 2 of 194 BOEING SERVICE BULLETIN 757-27A0152
BLANK PAGE
Table of Contents
Revision Transmittal Sheet5
Summary9
1. PLANNING INFORMATION ........................................ 1 3 A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 1 8 B. Concurrent Requirements ...................................... 1 8 C. Reason ................................................ 1 8 D. Description .............................................. 2 0 E. Compliance .............................................. 2 2 F. Approval ............................................... 2 2 G. Manpower .............................................. 2 3 H. Weight and Balance Changes .................................... 2 7 I. Electrical Load Data ......................................... 2 7 J. References .............................................. 2 7
1. Existing Data: ......................................... 2 7
2. Data Supplied with this Service Bulletin: ........................... 2 8
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 8 K. Publications Affected ........................................ 2 8 L. Interchangeability and Intermixability of Parts ........................... 2 9 M. Software Accomplishment Summary ................................ 2 9
2. MATERIAL INFORMATION ........................................ 3 1 A. Material - Price and Availability ................................... 3 1 B. Industry Support Information .................................... 3 3 C. Parts Necessary for Each Airplane ................................. 3 3
1. Kits/Parts: ........................................... 3 3
2. Parts and Materials Supplied by the Operator: ........................ 4 1
3. Parts Modified and Reidentified: ............................... 4 1
4. Parts Removed and Not Replaced: .............................. 4 1 D. Parts Necessary to Change Spares ................................. 4 2 E. Special Tooling - Price and Availability ............................... 4 2 F. Special Tooling Necessary to do this Service Bulletin ....................... 4 2
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 3 A. GENERAL INFORMATION ..................................... 4 3 B. WORK INSTRUCTIONS ....................................... 4 4 FIGURE 1: E3-1 ELECTRONICS SHELF - REMOVAL [Group 1-5, Configuration 1] .......... 7 4 FIGURE 2: E3-1 ELECTRONICS SHELF - RELAY BRACKET INSTALLATION [Group 1-5, Configuration 1 ] ................................................ 7 7 FIGURE 3: SPOILER CONTROL MODULE - WIRE PIN STRAPPING REMOVAL [Group 1-5, Configuration 1 ] ................................................ 8 7 FIGURE 4: W1265 WIRE BUNDLE ROUTING [Group 1-2, 5, Configuration 1] ............. 8 9 FIGURE 5: W1265 WIRE BUNDLE CHANGES [Group 1, Configuration 1] ............... 9 0 FIGURE 6: W1265 WIRE BUNDLE CHANGES [Group 2, Configuration 1] ............... 9 7 FIGURE 7: W1265 WIRE BUNDLE CHANGES [Group 5, Configuration 1] .............. 1 0 4 FIGURE 8: W1265 WIRE BUNDLE ROUTING [Group 3, Configuration 1] ............... 1 1 1 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 3 of 194 BOEING SERVICE BULLETIN 757-27A0152
FIGURE 9: W1265 WIRE BUNDLE CHANGES [Group 3, Configuration 1] .............. 1 1 2 FIGURE 10: W1265 WIRE BUNDLE ROUTING [Group 4, Configuration 1] ............... 1 1 9 FIGURE 11: W1265 WIRE BUNDLE CHANGES [Group 4, Configuration 1] .............. 1 2 0 FIGURE 12: E3-1 ELECTRONICS SHELF - RELAY BRACKET EQUIPPING [Group 1-5, Configuration 1] ................................................. 1 2 7 FIGURE 13: E3-1 ELECTRONICS SHELF - INSTALLATION [Group 1-5, Configuration 1] ....... 1 3 4 FIGURE 14: W4471 WIRE BUNDLE ROUTING [Group 1-2, 5, Configuration 1] ............ 1 3 8 FIGURE 15: W4471 WIRE BUNDLE CHANGES [Group 1, Configuration 1] .............. 1 4 4 FIGURE 16: W4471 WIRE BUNDLE CHANGES [Group 2, Configuration 1] .............. 1 4 6 FIGURE 17: W4471 WIRE BUNDLE CHANGES [Group 5, Configuration 1] .............. 1 4 8 FIGURE 18: W4471 WIRE BUNDLE ROUTING [Group 3, Configuration 1] ............... 1 5 0 FIGURE 19: W4471 WIRE BUNDLE CHANGES [Group 3, Configuration 1] .............. 1 5 6 FIGURE 20: W4471 WIRE BUNDLE ROUTING [Group 4, Configuration 1] ............... 1 5 8 FIGURE 21: W4471 WIRE BUNDLE CHANGES [Group 4, Configuration 1] .............. 1 6 4 FIGURE 22: E3-1 ELECTRONICS SHELF - REMOVAL [Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 4, Configuration 2-3; Group 5, Configuration 2-3] . 166 FIGURE 23: E3-1 ELECTRONICS SHELF - RELAY BRACKET ASSEMBLY - TORQUE NUTS [Group 1-5, Configuration 2] ........................................ 1 6 9 FIGURE 24: E3-1 ELECTRONICS SHELF - RELAY BRACKET GROUND STUD - TORQUE NUTS AND BOND RESISTANCE TESTS [Group 1-5, Configuration 2] ................. 1 7 2 FIGURE 25: E3-1 ELECTRONICS SHELF - INSTALLATION [Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 4, Configuration 2-3; Group 5, Configuration 2-3] ............................................... 1 7 6 FIGURE 26: E3-1 ELECTRONICS SHELF - WIRE BUNDLE AND NEW RELAY - INSPECTION AND INSTALLATION CHANGE [Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 4, Configuration 2-3; Group 5, Configuration 2-3] ........ 1 8 0 FIGURE 27: E3-1 ELECTRONICS SHELF - WIRE BUNDLE AND NEW RELAY CLEARANCE - INSPECTION [Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 4, Configuration 2-3; Group 5, Configuration 2-3] ....................... 1 8 9 FIGURE 28: E3-1 ELECTRONICS SHELF - MODULE M531 - WIRE BUNDLE AND NEW RELAY CLEARANCE - ADJUSTMENT [Group 1-3, 5, Configuration 1] .............. 1 9 1 FIGURE 29: E3-1 ELECTRONICS SHELF - MODULE M531 - WIRE BUNDLE AND NEW RELAY CLEARANCE - ADJUSTMENT [Group 4, Configuration 1] ................. 1 9 3 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 4 of 194 BOEING SERVICE BULLETIN 757-27A0152
Commercial Airplanes 757 Service Bulletin Revision Transmittal SheetNumber: 757-27A0152Original Issue: April 29, 2009 Revision 3: October 28, 2013 ATA System: 2760 SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings - New Spoiler Control Module Relay Installation This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Notice of Proposed Rule Making FAA NPRM 2010-NM-199-AD, is related to this service bulletin.
No more work is necessary on the airplane(s) changed in accordance with the Revision 2 of this service bulletin.
More work is necessary on the airplane(s) changed in accordance with the Original Issue or Revision 1, but not Revision 2, of this service bulletin as given below.
– Operators that have incorporated the Original Issue, but not Revision 1 or Revision 2, must remove the E3-1 electronics shelf and torque the relay bracket assembly installation nuts and ground stud nuts and then do a bond resistance test between the relay bracket assemblies and terminal lugs on the ground studs.
Operators must also do a General Visual Inspection (GVI) to make sure the three new relays do not touch the adjacent wire bundles. If the three new relays do not touch adjacent wire bundles no more work is necessary. If any of the new relays are found to touch adjacent wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing damage, near the relays, and repair as necessary. The three new relays must be removed and installed again on the opposite side of the same relay bracket assembly, to prevent further wire bundle damage. This more work is identified as Configuration 2, for Groups 1 thru 5.
– Operators that have incorporated Revision 1, but not Revision 2, must do a General Visual Inspection (GVI) to make sure the three new relays do not touch the adjacent wire bundles. If the three new relays do not touch the adjacent wire bundles no more work is necessary. If any of the new relays are found to touch adjacent wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing damage, near the relays, and repair as necessary. The three new relays must be removed and installed again on the opposite side of the same relay bracket assembly, to prevent further wire bundle damage.
This more work is identified as Configuration 3, for Groups 1 thru 5.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 5 of 194
REASON FOR REVISION This revision is sent to make improvements and corrections to illustrations, as a result of comments received from operators. An alternative configuration of the E3-1 electronics shelf, applicable to Group 4, is added to the illustrations in Figures 2, 12 and 20. In Figure 14 a connector reference is corrected to agree with the related W4471 wire bundle change figures. In Figures 5, 6, 7, 9 and 11, Flag Note 6 and the related footnote are corrected. Also, Figures 28 and 29 are added to give instructions to adjust wire bundles, if necessary, to make space for the installation of the new bracket and relay on the E3-1 electronics shelf. Manpower, Operator Supplied Materials and Accomplishment Instructions paragraphs are updated to include the new figures and consumable parts necessary to adjust wire bundles. Module references and illustration locators are added throughout the figures to clarify relay bracket installation locations and wire routing instructions.
These sections are changed:
1. Paragraph 1.A., Effectivity: Updated group configuration descriptions to include Revision 2.
2. Paragraph 1.G., Manpower: Tables updated.
3. Paragraph 1.J., References: Updated.
4. Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Added parts necessary for wire bundle adjustment and footnote. Updated tape part number.
5. Paragraph 3.B., Work Instructions: Improved Step 6 and added optional work in Step 10 to adjust wire bundles, in Configuration 1 instructions. Updated titles for Configuration 2 and 3 instructions.
6. Figure 2 Illustrations: Added locators and module references. Added alternate Group 4 configuration for E3-1 electronics shelf. Updated footnote (c) in step table.
7. Figures 4, 8 and 10 Illustrations: Added locators and updated module references.
8. Figures 5, 6, 7, 9 and 11 Flag Note Table: Corrected More Data in Flag Note 6. Corrected Footnote
(b) or (c), referenced in Flag Note 10.
9. Figure 12 Illustrations: Added module references and alternate Group 4 configuration for E3-1 electronics shelf.
10. Figure 14 Illustration: Corrected connector reference.
11. Figure 20 Illustration: Corrected view of E3-1 electronics shelf to show Group 4 configuration.
12. Figures 23, 24, 26 and 27 Illustrations: Added locators and module references as necessary.
13. Figure 28: Added - applicable to Groups 1-3 and 5, Configuration 1.
14. Figure 29: Added - applicable to Group 4, Configuration 1.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.
Pages with no vertical lines have no important changes.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 6 of 194 BOEING SERVICE BULLETIN 757-27A0152
REVISION HISTORY April 29, 2009Original Issue:
June 30, 2010Revision 1:
May 25, 2012Revision 2:
October 28, 2013Revision 3:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 7 of 194 BOEING SERVICE BULLETIN 757-27A0152
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 8 of 194 BOEING SERVICE BULLETIN 757-27A0152
BLANK PAGE
Commercial Airplanes 757 Service Bulletin SummaryNumber: 757-27A0152Original Issue: April 29, 2009 Revision 3: October 28, 2013 ATA System: 2760 SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings - New Spoiler Control Module Relay Installation
CONCURRENT REQUIREMENTS None.
BACKGROUND This service bulletin gives instructions to install new relays adjacent to the Spoiler Control Modules (SCM's).
The new relays will ground a pin at each of the SCM's, M530 spoiler control module 1L and M531 spoiler control module 2L, when landing flaps are selected and prevent deployment of spoiler pairs 1 and 12, and, 5 and 8, during landing operations. If this service bulletin is not done, under certain gusty and windy conditions during landing, the airplane could potentially be put in an unsafe condition because of excessive lateral control.
Boeing has received twelve reports of 757 in-service events where the flight crew reported unwanted lateral oscillations during the final approach just before landing. The oscillations are characterized by large wheel inputs at high rates that are out of phase with airplane response. Pilot inputs being out of phase with airplane response is known as Pilot Induced Oscillation (PIO). PIO's are often related to tasks where the pilot is trying to precisely and quickly accomplish a flight maneuver, such as the final phase of a landing in gusty and turbulent wind conditions. To help reduce PIO's Boeing issued Service Bulletin 757-27A0146 (757-200's) and Service Bulletin 757-27A0147 (757-300's) which install a wheel damper to the first officer's lateral control quadrant, and Service Bulletin 757-57A0058 (757-200's) which installs vortex generators on the leading edge of each outboard main flap. This service bulletin adds another level of protection to further reduce the chance of PIO's on the 757 airplanes.
The two spoiler pairs 1 and 12, and, 5 and 8, will be disabled from responding to control wheel commands when the flaps are in the landing configuration by the use of relays to ground pins at each affected SCM. The speedbrake operation will be unaffected in-air and during on-ground operation. The airplane will be protected for the most important hydraulic system failures by re-engaging the spoiler pairs 1 and 12 if the right hydraulic system fails.
Accomplishment of the service bulletin will reduce the lateral control capability at landing flap (detent 25 and detent 30) by disabling spoiler pairs 1 and 12, and, 5 and 8, during landing operations. Disablement of these spoiler pairs will reduce the chance of a PIO occurrence.
Boeing Service Related Problem (SRP) 757-SRP-27-0182 is related to this service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane ND310 by Service Bulletin 757-27A0152 Original Issue before the release of Revision 1 of this service bulletin. The change completed on airplane ND310 by Service Bulletin 757-27A0152 Original Issue is equivalent to the release of Revision 1 of this service bulletin. Airplane ND310 has the configuration of a Group 2 airplane.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 9 of 194
ACTION (PRR 54530-278RS) Group 1-5, Configuration 1:
Get access to the Electronic Equipment Bay (E/E Bay) and remove the E3-1 electronics shelf from the airplane.
Make changes to the E3-1 electronics shelf to install three new bracket assemblies, three new relays, and to make changes to wire bundle W1265. Install the E3-1 electronics shelf to the airplane and make changes to wire bundle W4471 between the E3-1 electronics shelf and the E5-1 electronics shelf. Do a test of the Spoiler/Speedbrake Control System.
Group 1-5, Configuration 2:
Get access to the Electronic Equipment Bay (E/E Bay) and remove the E3-1 electronics shelf from the airplane.
Torque the relay bracket assembly installation nuts and ground stud nuts and then do a bond resistance test between the relay bracket assemblies and terminal lugs on the ground studs. Do a General Visual Inspection (GVI) to make sure the three new relays do not touch the adjacent wire bundles. If the three new relays do not touch the adjacent wire bundles no more work is necessary. If any of the new relays are found to touch adjacent wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing damage, near the relays, and repair as necessary. The three new relays must be removed and installed again on the opposite side of the same relay bracket assembly, to prevent further wire bundle damage. Test all disconnected wiring.
Install the E3-1 electronics shelf to the airplane.
Group 1-5, Configuration 3:
Get access to the Electronic Equipment Bay (E/E Bay) and the E3-1 electronics shelf. Do a General Visual Inspection (GVI) to make sure the three new relays do not touch the adjacent wire bundles. If the three new relays do not touch the adjacent wire bundles no more work is necessary. If any of the new relays are found to touch adjacent wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing damage, near the relays, and repair as necessary. The three new relays must be removed and installed again on the opposite side of the same relay bracket assembly, to prevent further wire bundle damage. Test all disconnected wiring as necessary. Install the E3-1 electronics shelf to the airplane, if necessary.
EFFECTIVITY All 757-200, -200CB, -200PF, -300 Airplanes. Refer to Paragraph 1.A., Effectivity, for the list of affected airplanes.
COMPLIANCE Federal Aviation Administration (FAA) Notice of Proposed Rule Making FAA NPRM 2010-NM-199-AD, is related to this service bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months after the original issue date of this service bulletin.
INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the test procedures given in this service bulletin.
MANPOWER Refer to Service Bulletin Manpower Paragraph 1.G., Manpower.
MATERIAL INFORMATION Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 10 of 194 BOEING SERVICE BULLETIN 757-27A0152
BOEING SERVICE BULLETIN 757-27A0152 Refer to Paragraph 2.A., Material - Price and Availability.
GROUP 1-5, CONFIGURATION 1:
E3-1 ELECTRONICS SHELF:
-REMOVE ELECTRONICS SHELF.
-CHANGE WIRE BUNDLES W1265 AND W4471.
-INSTALL CHANGED ELECTRONICS SHELF.
K10877 GROUP 1-5, CONFIGURATION 1: K10878 E5-1 ELECTRONICS SHELF:
-CHANGE WIRE BUNDLE W4471.
K10876 GROUP 1-5, CONFIGURATION 1:
-INSTALL NEW BRACKET ASSEMBLIES AND RELAYS.
-CHANGE WIRE BUNDLE W1265.
W1265 E3-1 ELECTRONICS SHELF (TYPICAL INSTALLATION) GROUP 1-5, CONFIGURATION 2 AND 3:
-DO A GVI TO MAKE SURE THE NEW RELAYS AND ADJACENT WIRE BUNDLES DO NOT TOUCH, IF FOUND TO TOUCH.
-DO A GVI FOR WIRE CHAFING DAMAGE, OF WIRE BUNDLES ADJACENT TO THE NEW RELAYS.
REPAIR THE WIRE BUNDLES IF NECESSARY.
-CHANGE RELAY INSTALLATION.
CONFIGURATION 2 ONLY:
-REMOVE ELECTRONICS SHELF.
-TORQUE BRACKET ASSEMBLY INSTALLATION NUTS AND GROUND STUD NUTS.
-DO A BOND RESISTANCE TEST BETWEEN THE NEW BRACKET ASSEMBLIES AND THE TERMINAL LUGS.
-INSTALL ELECTRONICS SHELF.
Original Issue: April 29, 2009 Revision 3: October 28, 2013 Export Controlled ECCN: 9E991 - BOEING 757-27A0152 PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 194
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 29, 2009 757-27A0152Revision 3: October 28, 2013 12 of 194 BOEING SERVICE BULLETIN 757-27A0152