Copy · U.S. DOT/FAA - Service Bulletin -757-54A0047-04 · 62 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0724; AD 2012-26-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '99bc62dc6f37c4a9c96e17149eb838f64ea86d82a810d6eb8ec0df7e6a8f4c39'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Show pages 1–12

GroupVariable Number 2NC062 1NC936 - NC950 1NC971 - NC974 1ND001 - ND007 1ND011 - ND059 1ND111 - ND113 1ND161 - ND199 1ND201 - ND203 1ND221 - ND225 1ND241 - ND248 1ND301 - ND317 2ND318 - ND322 2ND401 1ND891 1ND895 2NJ001 - NJ004 2NJ031 - NJ032 2NN001 - NN002 2NN051 - NN052 1NS601 - NS610 2NS611 - NS616 2NT001 - NT009 2NT201 - NT202 2NT231 - NT234 2NT237 - NT240 2NT242 2NT245 - NT248 2NT281 - NT289 2NT381 - NT386 2NT401 - NT409 2NT411 - NT412 2NT426 - NT427 2NT431 - NT432

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 13 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

GroupVariable Number 2NT436 - NT438 2NT446 2NT731 - NT769 2NT861 - NT862 2NT901 - NT916 2NT971 - NT985

2. Spares Affected None.

B. Concurrent Requirements None.

C. Reason This service bulletin gives the instructions to inspect the joint between the aft torque bulkhead and the strut-to-diagonal brace fitting for a loose shim, and/or loose, missing, or damaged fasteners. Instructions are also given to make repairs if loose fasteners or migrated shims are found during the inspections and do an inspection and repair of the four critical fastener holes on the horizontal flange.

Since 1993, Boeing has eighteen reports of cracks, loose and broken bolts, and shim migration in the joint between the aft torque bulkhead and the strut-to-diagonal brace fitting.

Service History ReportStrutCyclesHoursDate One bolt sheared in horizontal flange. Four bolts loose in vertical flange.

-10,28429,45112/93 Four bolts loose in vertical flange of both struts.No. 1 & 29,35825,76811/96 One bolt loose in vertical flange of Strut No. 1. Four bolts loose in vertical flange of Strut No. 2.

No. 1 & 2--06/98 Four bolts loose in vertical flange of both struts. Two bolts sheared in horizontal flange of both struts. All remaining bolts loose in horizontal flange of both struts.

No. 1 & 221,74955,78911/99 Sixteen bolts loose in horizontal flange.No. 1 & 220,16146,45901/01 Two bolts loose in vertical flange.No. 113,66249,01909/01 Two bolt heads cracked.-14,63323,42301/02 Two bolts loose in horizontal flange of Strut No. 1.

Three bolts loose in horizontal flange of Strut No. 2.

No. 1 & 212,49316,60104/02

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 14 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

Service History ReportStrutCyclesHoursDate Migrated shim between bulkhead and vertical flange of fitting.

No. 1 & 215,52243,82205/02 Four bolts loose in vertical flange. Five bolts loose in horizontal flange.

No. 215,90046,75806/02 One bolt missing and one bolt loose in horizontal flange. Cracks in the aluminum bulkhead at three hole locations.

No. 120,09049,80712/02 Two loose bolts in vertical flange.-22,11150,84104/03 Three loose bolts in vertical flange.No. 19,99130,07209/03 Migrated shims between bulkhead and vertical flange of fitting.

No. 1 & 226,91460,71509/03 Three loose bolts in vertical flange.No. 215,00444,98510/03 Three loose bolts in vertical flange.No. 27,92212,36801/04 Four loose bolts in vertical flange.No. 17,59212,11902/04 One loose fastener in the vertical flange. Cracks in the aluminum bulkhead at two hole locations and web at one hole location common to the horizontal flange.

No. 11308344,42304/06 In addition, one operator found a strut torque bulkhead fitting with loose fasteners and cracks at the joint common to the strut diagonal brace fitting on two airplanes with the Strut Improvement Program (SIP) incorporated during production. One airplane had been inspected for loose fasteners in 2006 per service bulletin 75-54A0047 Revision 01 with no findings. Since that inspection, the airplane had accumulated less than 3000 flight cycles. The loose fasteners and cracks were found during an engine change while the area was exposed.

Continued operation with cracks, and/or loose and broken fasteners, could cause separation of the joint between the aft torque bulkhead and the strut-to-diagonal brace fitting. With separation of these components, the diagonal brace would not transmit the engine loads through to the wing structure.

Continued safe flight, as related to this characteristic of the strut installation, would then have dependence on the upper link load path of the strut. The upper link load path is designed with sufficient strength to carry the load redistribution. However, if a separation in the diagonal brace load path goes undetected for a long enough period, loss of the strut could occur.

Boeing Service Related Problems (SRP) 757-SRP-54-0095, 757-SRP-54-0118 and 757-SRP-54-0130 are related to this service bulletin.

Revision 01 is sent to give migration limits for the shims in the diagonal brace load path. The inspection given in the initial release of this service bulletin made it necessary to repair a loose shim before an airplane could be put back in service. With these new migration limits, an airplane can be put back in service with a migrated shim if the inspection finds that it is in the permitted limits. The bulkhead crack repair as given in the initial release has been deleted. If cracks are found, they will be reviewed on a case-by-case basis.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 15 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

A new repair is added for the shims in the diagonal brace load path. There are now 4 repairs and 1 repair that has been deleted. For identification, they are referred to as Interim Repairs I, II, III, IV and V. Interim Repair I is almost the same as the one given in the initial release and replaces the two shims between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Interim Repairs II and III are the same as those given in the initial release. Interim Repair II installs oversize fasteners in the vertical flange of the fitting, and Interim Repair III installs oversize fasteners in the horizontal flange of the fitting. Interim Repair IV is the same bulkhead crack repair given in the initial release and has been deleted. Interim Repair V is new and gives the instructions to cut and remove the exposed plies of the shims as a repair for shim migration of 0.50, or less These sections of the service bulletin were changed with revision 01:

— Compliance - Decreased repeat inspection thresholds to address additional in service reports where loose fasteners were found on airplanes with less than 12,000 flight cycles. Also, added compliance information for airplanes line numbers 736 thru 1048 to address additional reports of loose fasteners on airplanes with the latest configuration.

— Reason and Description - Add six reports to the service history table.

— Effectivity - Added 757-200/-200CB and 200PF airplanes with RB211 engines, Line numbers 736 thru 1048.

— Work Instructions, Part I, Step 2 - Add shim migration limits to show the necessary work if shim migration is found during the inspection.

— Figure 2 - Add instructions to measure and record the distance a shim has moved from the installed position, if the shim shows signs of movement during the inspection.

— Figure 4 - Make changes to the figure as follows:

— Change the figure title to show that it is Interim Repair I.

— Make corrections to the illustration and instructions to show the replacement of two shims.

One on the left flange of the fitting and one on the right flange of the fitting.

— Add a step is to apply sealant around the outer edge of the shim.

— Add a step to increase the hole diameter after shim is in place.

— Removed repair instructions for cracks.

— Figure 5 - Make changes to the figure as follows:

— Change the figure title to show that it is Interim Repair II.

— Removed repair instructions for cracks.

— Figure 6 - Make changes to the figure as follows:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 16 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

— Change the figure title to show that it is Interim Repair III.

— Removed repair instructions for cracks.

— Figure 7 - Deleted.

— Figure 9 - Add this new figure to give the instructions for Interim Repair V.

— Figure 10 - Added this new figure to give instructions for sealing removed parts.

Revision 02 is sent to give revised inspection schedule and repair requirements. Instructions are added to inspect for cracking at four critical horizontal flange fasteners holes if one or more loose fasteners is found. Also, do a one-time inspection and repair of the four critical faster holes on the horizontal flange. Figure 11, Interim Repair VI is new and gives location and instruction for the four critical horizontal flange fastener locations.

These sections of the service bulletin are changed with revision 02:

— Summary - Added revised inspection intervals in the Compliance section. Added horizontal flange one-time critical fastener inspection and repair requirement in the Action section. Added one report to the Service History in Background section.

— Planning - Added revised inspection intervals in the Compliance section. Added horizontal flange one-time critical fastener inspection and repair requirement in the Description section. Added one report to the Service History in the Reason section. Added Manpower hours for Part IV inspection.

— Accomplishment Instructions - Revised access instructions. Added inspections, critical fastener identification, locations, compliance requirement Notes and Part IV inspection.

— Figure 6 - Added HFEC inspections to aluminum bulkhead and steel web with NDT references.

— Figure 11 - Added, for critical horizontal flange fastener locations, HFEC inspections to aluminum bulkhead and steel web with NDT references.

— All references to AD 2004-12-07 are changed to AD 2005-12-04.

Revision 03 is sent to give revised inspection compliance times and replace the phrase "one time inspection" with "inspection" when referring to the Part IV inspection of the critical fastener holes on the horizontal flange .

These sections of the service bulletin are changed with revision 03:

— Summary - Compliance information is deleted from the Compliance section.

— Paragraph 1.E., Compliance - Compliance times are revised and presented in a tabular format.

— Summary, Planning Information, Work Instructions: replaced the words "one time inspection" with "inspection".

Revision 04 is sent to revise the compliance information and to give an alternative method of accessing the critical fasteners at the strut-to-diagonal brace fitting. It is also sent to add more instructions for inspecting the aft torque bulkhead.

The following sections were changed:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 17 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

1. More information is added to the Background and Reason sections.

2. Paragraph 1.D., Description - Affected maintenance zones are added.

3. Paragraph 1.E., Compliance - The compliance information is revised.

4. Paragraph 1.F., Approval - An Alternative Method of Compliance (AMOC) statement is added, and the Federal Aviation Administration (FAA) Airworthiness Directives (AD) reference is changed.

5. Paragraph 1.G., Manpower - Added a new manpower table and changed manpower information.

6. Paragraph 1.J.1., Existing Data - Service Related Problem (SRP), Nondestructive Test (NDT) and the FAA (AD) reference is changed.

7. Paragraph 1.K., Publications Affected - A Damage Tolerance Based Structural Inspection statement is added.

8. Paragraph 3.A., General Information - Added new standard Note 1 and Note 7.

9. Paragraph 3.B., Work Instructions - More inspection instructions are added to Part II and Part IV.

10. FIGURE 3 - A new view and more inspection instructions are added.

11. FIGURE 12 and FIGURE 13 are added.

D. Description Get access to the forward and aft surfaces of the torque bulkhead assembly. Do an inspection of the shims between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Also, do an inspection of the four fasteners through the vertical flange of the fitting and the torque bulkhead.

If shim migration and/or loose bolts are found in the diagonal brace load path, make the applicable interim repairs.

Get more access for the inspection of the horizontal flange of the strut-to-diagonal brace fitting. Do an inspection of the sixteen fasteners through the horizontal flange of the fitting. A borescope, or other inspections aids, can be necessary for this inspection. If necessary remove the engine and install oversize fasteners.

If loose fasteners are found or shim migration is beyond limits, do an inspection of the four critical fastener holes on the horizontal flange.

As necessary, apply new sealant to the fasteners and leveling compound to the strut structure. As necessary install the engine, diagonal brace, and other components removed to get access. Put the airplane back to a serviceable condition and schedule the repeat inspections.

Revision 01 - More work is necessary on airplanes changed as shown in the initial release of this service bulletin. Repeat inspections are required for airplanes that have incorporated Service Bulletin 757-54-0035.

Revision 02 - More work is necessary on airplanes changed as shown in the initial release and revision 01 of this service bulletin. Instructions are added to do a one-time inspection and repair of the four critical fastener holes on the horizontal flange.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 18 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

Revision 03 - No more work is necessary on airplanes changed as shown in the Original issue, Revision 1, or Revision 2 of this service bulletin, however the conditions and the compliance time for doing the inspection of the four critical fasteners on the horizontal flange have changed.

Revision 04 - More work is necessary on airplanes changed in accordance with the original issue, Revision 1, Revision 2 or Revision 3 of this service bulletin. On airplanes without conclusive records of previous inspections, do a one time open hole High Frequency Eddy Current (HFEC) inspection or ultrasonic inspection of the four critical fastener holes in the horizontal flange as given in this service bulletin.

The work in this service bulletin is done in the maintenance zone(s) given below.

Group 1:

Affected Maintenance Zones ZoneModel 433, 443757-200, 757-200CB, 757- 200PF Group 2:

Affected Maintenance Zones ZoneModel 433, 443757-200, 757-200PF

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 19 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

E. Compliance Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque Bulkhead .

Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition --Within 90 days of the date of Revision 4 of this service bulletin.

Inspect the four critical fasteners in the horizontal flange in accordance with Part IV unless already accomplished in accordance with Revision 2 or Revision 3 of this service bulletin.

All airplane struts that had findings on the horizontal or vertical fasteners or the shims which lead to a rejection while doing Revision 1 or the original release of this service bulletin, and all airplanes that had equivalent findings prior to the original release of this service bulletin. (a)

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 20 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque Bulkhead .

Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition 1800 flight cycles.1800 flight cycles from the last inspection for loose fasteners and migrated shims per this service bulletin.

Within 90 days of the date of Revision 4 of this service bulletin.

Inspect the shim installation in accordance with Part I, Step 3. Inspect all four fasteners in the vertical flange in accordance with Part I, Step 5. Inspect the fasteners in the horizontal flange in accordance with Part II, Step 2. Do a detailed inspection of the bulkhead in accordance with Part II, Step

3.

Group 1 Configuration 1 OR 3000 flight cycles.1800 flight cycles from the last inspection for loose fasteners and migrated shims per this service bulletin.

Within 90 days of the date of Revision 4 of this service bulletin.

Inspect the shim installation in accordance with Part I, Step 3. Inspect all four fasteners in the vertical flange in accordance with Part I, Step 5. Inspect the fasteners in the horizontal flange in accordance with Part II, Step 2. Do a detailed inspection and an ultrasonic inspection of the bulkhead in accordance with Part II, Step 3.

3000 flight cycles.3,000 flight cycles from the last inspection for loose fasteners and migrated shims per this service bulletin.

Within 90 days of the date of Revision 4 of this service bulletin.

Inspect the shim installation in accordance with Part I, Step 3. Inspect all four fasteners in the vertical flange in accordance with Part I, Step 5. Inspect the fasteners in the horizontal flange in accordance with Part II, Step 2. Do a detailed inspection of the bulkhead in accordance with Part II, Step

3.

Group 1 Configuration 2

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 21 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque Bulkhead .

Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition 3000 flight cycles.3,000 flight cycles from the last inspection for loose fasteners and migrated shims per this service bulletin.

Within 90 days of the date of Revision 4 of this service bulletin.

Inspect the shim installation in accordance with Part I, step 3. Inspect all four fasteners in the vertical flange in accordance with Part I, Step 5. Inspect the fasteners in the horizontal flange in accordance with Part II, Step 2. Do a detailed inspection of the bulkhead in accordance with Part II, Step

3.

Group 2 --Within 90 days of the date of Revision 04 of this service bulletin.

Do an open hole High Frequency Eddy Current (HFEC) inspection at the critical fastener location in accordance with Work Instructions Part IV, Step 2.a.

Airplanes without conclusive records of previous inspection.

OR --Within 90 days of the date of Revision 04 of this service bulletin.

Do an ultrasonic inspection of the critical fastener holes in the horizontal flange in accordance with Work Instructions Part IV, Step 2.b.

--Before further flight after completing all inspections.

Repair in accordance with Part I, Step 4.a.

Total cumulative shim movement equal to or less than 0.50 inch.

--Before further flight after completing all inspections.

Repair in accordance with Part I, Step.4.b.

Total cumulative shim movement more than 0.50 inch.

--Before further flight after completing all inspections.

Repair in accordance with Part I, Step 5.a.(2) AND Inspect and repair in accordance with Part I, Step 5.a.(3) Rejected fastener in the vertical flange.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 22 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque Bulkhead .

Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition --Before further flight after completing all inspections.

Repair in accordance with Part II, Step 2.a.(2) AND Inspect and repair in accordance with Part II, Step 2.a.(3) Rejected fastener in the horizontal flange.

--Before further flight.Contact Boeing for repair instructions and do the repair.

Any crack found in the bulkhead flange or the vertical stiffeners or the access door cutout edge.

--Before further flight.Contact Boeing for repair instructions and do the repair.

Any crack found in any critical fastener hole.

(a) Findings on Group 1, Configuration 2 airplane struts prior to service bulletin 757-54-0035 incorporation are excluded from this condition.

Federal Aviation Administration (FAA) Airworthiness Directives (AD) 2004-12-07 and 2008-05-10 are related to this service bulletin.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

The Manager of the FAA Seattle Aircraft Certification Office (SACO) approves the inspection methods and fastener replacements specified in Table 1 under paragraph 1.E., "Compliance," of Service Bulletin 757-54A0047, Revision 4, as an AMOC to the inspection methods and modifications specified in SB 757-54-0035, Revision 1, dated April 15, 1999; or Revision 2, dated June 13, 2002, as required by paragraphs (b) and (d) of AD 2004-12-07. All provisions of AD 2004-12-07, including the compliance times, that are not specifically referenced in the preceding sentence remain fully applicable and must be complied with.

In addition, the manager of the SACO approves the inspection methods, and modifications specified in Table 1 under paragraph 1.E., "Compliance," of Service Bulletin 757-54A0047, Revision 4, including Part IV, Option 2 - Ultrasonic Inspection, as an AMOC to the inspections and modifications in accordance with SB 757-54A0047 Revision 3, dated June 27, 2007 specified by paragraphs (g) and (l) of AD 2008-05-10. All provisions of AD 2008-05-10, including the compliance times, that are not specifically referenced in the preceding sentence remain fully applicable and must be complied with.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 23 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

G. Manpower The table below shows an estimate of the task-hours necessary to do this inspection and repair for each strut. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task-hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

— Time to adjust to the workplace.

— Time to schedule the work.

— Time to examine the work.

— Time to cure the materials.

— Time to make the parts.

— Time to find the tools.

Part I - Inspection - Fasteners and Shim - Vertical Flange Elapsed HoursTask-HoursNumber of Persons Task

6.012.02Open Access

1.02.02Inspect ---Repair (a)

7.014.02Close Access

14.028.0TOTAL FOR EACH STRUT

(a) An estimate for the task-hours necessary to do the repair is not given.

Part II - Inspection - Fasteners - Horizontal Flange Elapsed HoursTask-HoursNumber of Persons Task

1.02.02Open Access

6.012.02Inspect ---Repair (a)

1.02.02Close Access

8.016.0TOTAL FOR EACH STRUT (b)

(a) An estimate for the task-hours necessary to do the repair is not given.

(b) More time can be necessary for the removal of the engine, diagonal brace, and precooler.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 24 of 62 BOEING SERVICE BULLETIN 757-54A0047

ALERTALERT

Pages 25–36 of 62