TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '99bc62dc6f37c4a9c96e17149eb838f64ea86d82a810d6eb8ec0df7e6a8f4c39' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '99bc62dc6f37c4a9c96e17149eb838f64ea86d82a810d6eb8ec0df7e6a8f4c39' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Part IV - Inspection - Critical Fastener Holes on the Horizontal Flange (Engine Removed) Elapsed HoursTask-HoursNumber of Persons Task
2.510.04Open Access (Engine Removed)
1.02.02.0Inspect Option 1
2.04.02.0Inspect Option 2 ---Repair (a)
3.012.04Close Access (Engine Removed)
3.06.03Trim and Check Engine
8.5 (b)28.0 (b)TOTAL FOR EACH STRUT (b)
(a) An estimate for the task-hours necessary to do the repair is not given.
(b) Total does not include inspection estimate. Add inspection estimate for option used to total shown to arrive at revised total.
Part IV - Inspection - Critical Fastener Holes on the Horizontal Flange (Common Nozzle Exhaust Removed) Elapsed HoursTask-HoursNumber of Persons Task
3.57.02Open Access (Common Nozzle Exhaust Removed)
1.02.02.0Inspect Option 1
2.04.02.0Inspect Option 2 ---Repair (a)
3.57.02Close Access (Common Nozzle Exhaust Removed)
7.0 (b)14.0 (b)TOTAL FOR EACH STRUT (b)
(a) An estimate for the task-hours necessary to do the repair is not given.
(b) Total does not include inspection estimate. Add inspection estimate for option used to total shown to arrive at revised total.
H. Weight and Balance Changes None.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 25 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
I. Electrical Load Data Not changed.
J. References
1. Existing Data:
a. Service Related Problems (SRP) 757-SRP-54-0095, 757-SRP-54-0118 and 757-SRP-54-0130.
b. 757 Aircraft Maintenance Manual (AMM) 54-51-02, 54-53-01, 54-53-02, 71-00-02, 71- 00-02, 71-11-07, 78-11-04 and 78-31-00.
c. 757 Structural Repair Manual (SRM) Chapter 51.
d. 757 Non-Destructive Testing (NDT) Manual Part 4, 54-50-02, Part 6, 51-00-14, Part 6, 51-00-16 and Part 6, 51-00-17.
e. Standard Overhaul Practices Manual (SOPM) 20-43-03, 20-50-19
f. Boeing Service Bulletin 757-54-0035, 'NACELLES/PYLONS Rolls Royce RB211 Powered Airplanes - Nacelle Strut and Wing Structure Improvement'.
g. FAA Airworthiness Directives AD 2004-12-07 and 2008-05-10.
h. Boeing Parts Standards Document D-590.
i. Boeing Drawing 65-88700.
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number Spar Installation - Lower Nacelle Strut311N5042 Torque Bulkhead Installation311N5045 Seal Application - Nacelle Strut311N5062 These drawings were used to prepare this service bulletin. These drawings are not necessary to make the specified changes, and are not supplied with this service bulletin. These drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 26 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 27 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 28 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
BLANK PAGE
2. MATERIAL INFORMATION A. Material - Price and Availability None.
B. Industry Support Information Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Specification
(a)Chemical Conversion Treatment 4 oz.Type 2, Class A
(c)Primer8 oz.BMS 10-11, Type 1
(c)Sealant1 pt.BMS 5-63
(d)Primer8 oz.DAPCO 1-400
(e)Primer8 oz.DC 1200 -Sealant1 pt.DC 93-006 -Leveling Compound1 qt.DC 3110
(f)--RTV 560
(f)--RTV 3
(f)--RTV 60
2.50 x 2.50 x 0.080 (g)CRES Plate-301 SS 1/2 Hard
(h)Bolt-BACB30* -Collar-BACC30*
(i) BACS40R015C027F optionalShim, Laminated2BACS40R015B027F
(j)Filler, Radius2BACF3H10JT010HG
(a) Can be necessary if you make the radius filler shown in Figure 6. Refer to SOPM 20- 43-03 for data about the Chemical Conversion Treatment.
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
(c) Alternative to DC 93-006.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 29 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
NotesNameQTYPart Number / Specification
(d) Primer is necessary if BMS 5-63 is applied over rubber/silicon substrates.
(e) Use with DC 93-006 and DC 3110.
(f) Alternative to DC 3110.
(g) Can be necessary if a crack is found in the aft bulkhead that cannot be repaired with the installation of an oversize fastener.
(h) See the Paragraph 3.B., Work Instructions, Figures 4, 5, 6, and 7, for the oversize bolt/collars that can be necessary if the inspections find a loose shim and/or damaged fasteners.
(i) Can be necessary if loose shims are found during the inspection.
(j) Can be necessary if oversize fasteners are installed as shown in Figure 6. Instructions are also given to make the filler from 0.063 thick 2024-T3, T4, T42, or 7075-T6 Bare Aluminum Sheet.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares None.
E. Special Tooling - Price and Availability None.
F. Special Tooling Necessary to do this Service Bulletin A borescope, or other inspection aids, can be necessary to do the inspection of the fasteners in the horizontal flange of the strut-to-diagonal brace fitting. Also, maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 30 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
3. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions in Paragraph 3.B., Work Instructions, and the Figure(s) give the recommended sequence of steps. The sequence of steps to do this service bulletin can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for definition of the acronyms.
3. Obey all of the warnings and cautions in the specified manual sections.
4. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches.
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch.
— Angular tolerance is plus or minus 2 degrees.
— Hole dimensions for standard solid rivets are in 757 SRM, Chapter 51.
— Torque limits to tighten nuts and bolts are in 757 SRM, Chapter 51.
5. For approved fastener and process material substitutions, refer to 757 SRM, Chapter 51, Alternate fasteners are in 757 SRM Chapter 51 and Boeing Drawing 65-88700.
6. If the length of fasteners specified in this service bulletin do not meet the installation standards, fasteners of the same specification, or an approved substitute, one grip length longer or shorter may be used.
7. Inspections, used in the service bulletin, are defined as follows:
Detailed Inspection: An intensive visual examination of a specific structural area, system, installation or assembly to detect damage, failure or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate by the inspector. Inspection aids such as mirrors, magnifying lenses, etc. may be used. Surface cleaning and elaborate access procedures may be required.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 31 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
Non-Destructive Testing (NDT) inspections are used to examine all subsurface damage and most small cracks. NDT is also used in areas where a visual inspection is not sufficient to find the dimensions of damage.
8. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
B. WORK INSTRUCTIONS
PART I - INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE - ALL AIRPLANES
1. Refer to 757 AMM 78-31-00 and do the Thrust Reverser Deactivation for Ground Maintenance.
WARNING: DO THE THRUST REVERSER DEACTIVATION PROCEDURE TO PREVENT THE OPERATION OF THE THRUST REVERSER. THE ACCIDENTAL OPERATION OF THE
THRUST REVERSER CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
2. Get access for the inspection of the fasteners and shim in the vertical flange in accordance with FIGURE 1.
3. Do the inspection of the shim installation between the vertical flange and bulkhead in accordance with FIGURE 2:
a. For Group 1 and Group 2 airplanes: If the shim installation shows signs of movement and is rejected: Continue with Step 4, below.
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
b. If the shim installation is satisfactory: Continue with the inspection of the four fasteners in the vertical flange in accordance with step 5, below.
4. Do repairs to the shim installation between the vertical flange and the bulkhead as given below:
a. If the shim(s) Total cumulative movement is 0.50 or less: Do Interim Repair V in accordance with FIGURE 9. Record the amount of total shim movement and save for future inspections.
b. If the shim(s) Total cumulative movement is more than 0.50: Remove the engine. Refer to 757 AMM 71-00-02 as an accepted procedure and do Interim Repair I in accordance with FIGURE 4. Also, do the inspection and repair of the four critical fastener holes on the horizontal flange in accordance with Part IV.
5. Do the inspection of the four fasteners in the vertical flange in accordance with FIGURE 2:
a. If one or more of the four fasteners are rejected:
(1) Remove the engine. Refer to 757 AMM 71-00-02 as an accepted procedure.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 32 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
(2) At the locations where fasteners are rejected in the vertical flange: Remove the fastener, increase the hole diameter and install oversize fasteners as shown for Interim Repair II in accordance with FIGURE 5.
(3) Do the inspection and repair of the four critical fastener holes on the horizontal flange in accordance with Part IV.
PART II - INSPECTION - FASTENERS - HORIZONTAL FLANGE - ALL AIRPLANES
1. Get more access, and removal of the leveling compound, for the inspection of the fasteners in the horizontal flange in accordance with FIGURE 1.
2. Do the inspection of the sixteen fasteners that hold the strut to the horizontal flange of the strut-to-diagonal brace fitting in accordance with FIGURE 3:
a. If one or more of the sixteen fasteners are rejected:
(1) Remove the engine. Refer to 757 AMM 71-00-02 as an accepted procedure.
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
(2) Remove the rejected fastener, inspect the fastener hole for cracking, increase the hole diameters and install oversize fasteners as shown for Interim Repair III in accordance with FIGURE 6.
(3) Do the inspection and repair of the four critical horizontal flange fastener holes on the horizontal flange in accordance with Part IV.
3. Inspect the bulkhead in the area around the access door cutout and around the critical fasteners in the horizontal flange in accordance with FIGURE 3, and do an optional ultrasonic inspection of the bulkhead around the fasteners in the horizontal flange in accordance with FIGURE 13.
a. If any crack is found in the bulkhead or the access door cutout edge, contact Boeing for repair instructions and do the repair.
b. If no crack is found in the bulkhead or the access door cutout edge, do repeat inspections in accordance with Paragraph 1.E., Compliance.
PART III - CLOSE ACCESS - ALL AIRPLANES
1. Apply new sealant in accordance with FIGURE 8.
2. Apply the leveling compound in accordance with FIGURE 8.
3. Install and seal the covers in accordance with FIGURE 10.
4. Install the remaining components that were removed to get access for the inspection.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 33 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
5. If necessary, install the engine. Refer to 757 AMM 71-00-02 as an accepted procedure.
6. Put the airplane back to a serviceable condition.
7. Schedule the airplane for the repeat inspection at the time in accordance with Paragraph 1.E., Compliance.
PART IV - INSPECTION - CRITICAL FASTENER HOLES ON THE HORIZONTAL FLANGE
1. If not already done get access in accordance with FIGURE 1.
2. Inspect the critical fastener holes in the horizontal flange using one of the options that follow:
a. Option 1 - High Frequency Eddy Current (HFEC) inspection.
(1) Get additional access by removing the engine, if not already done. Refer to 757 AMM 71- 00-02 as an accepted procedure, or remove the common exhaust in accordance with FIGURE 12.
(2) Remove the fasteners and do an HFEC inspection in accordance with FIGURE 11.
(a) If any crack is found, contact Boeing for repair instructions and do the repair.
(3) At locations where the critical fastener hole was rejected, increase the hole size and install an oversize fastener in accordance with FIGURE 11. Oversize only if warranted by the hole condition, otherwise install the same size fastener in accordance with FIGURE
11.
(4) At locations where the fastener hole was not rejected, install the same size fastener as was removed in accordance with FIGURE 11. Oversize only if warranted by the hole condition, otherwise install the same size fastener in accordance with FIGURE 11.
b. Option 2 - Ultrasonic Inspection:
(1) Do an ultrasonic inspection in accordance with FIGURE 13.
(a) If any crack is found, contact Boeing for repair instructions and repair.
(b) If no crack is found, do the repeat inspections in accordance with Paragraph 1.E., Compliance.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003 757-54A0047Revision 4: June 24, 2010 34 of 62 BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
BOEING SERVICE BULLETIN 757-54A0047
ALERT ALERT SEE (A FWD
LEFT SHOWN
RIGHT ALMOST THE SAME
(3) FWD • SEE LEFT WING/STRUT SHOWN W39396
RIGHT WING/STRUT THE SAME FIGURE 1: ACCESS FOR INSPECTION (SHEET 1 OF 3) Original Issue: November 13, 2003 Revision 4 June 24, 2010 BOEING PROPRIETARY - 757-54A0047 Copyright © Unpublished Work - See page 1 for details. 35 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERT ALERT
LEFT SHOWN
RIGHT OPPOSITE
EXISTING
COMPOUND - A-A W39439 FIGURE 1: ACCESS FOR INSPECTION (SHEET 2 OF 3) Original Issue: November 13, 2003 Revision 4 June 24, 2010 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 62