Copy · U.S. DOT/FAA - Service Information · 41 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-0595; AD 2012-23-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '61005fb519b41d758777ae4dbf5c9a448720192dade42ce968e09e98ddd3b983'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 777 Service Bulletin ALERT Number: 777-24A0119 Original Issue: November 11, 2011 ATA System: 2421 5383 SUBJECT: ELECTRICAL POWER - Power and Regulation - Inspection and if Necessary, Repair of Clamps, Power Feeder Cable, Insulation Blanket and Aft Pressure Bulkhead Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2011 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.

This document includes proprietary information owned by The Boeing Company and/or one or more third parties.

Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 1 of 41

4.0

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 2 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

BLANK PAGE

Table of Contents

Summary5

1. PLANNING INFORMATION9

A. Effectivity9

1. Airplanes9

2. Spares Affected ........................................ 1 3 B. Concurrent Requirements ...................................... 1 3 C. Reason ................................................ 1 4 D. Description .............................................. 1 4 E. Compliance .............................................. 1 5 F. Approval ............................................... 1 5 G. Manpower .............................................. 1 5 H. Weight and Balance Changes .................................... 1 6 I. Electrical Load Data ......................................... 1 6 J. References .............................................. 1 6

1. Existing Data .......................................... 1 6

2. Data supplied with this Service Bulletin ............................ 1 7

3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 1 7 K. Publications Affected ........................................ 1 7 L. Interchangeability and Intermixability of Parts ........................... 1 7

2. MATERIAL INFORMATION ........................................ 1 9 A. Material - Price and Availability ................................... 1 9 B. Industry Support Information .................................... 1 9 C. Parts Necessary For Each Airplane ................................. 1 9

1. Kits/Parts ............................................ 1 9

2. Parts and Materials Supplied by the Operator ........................ 2 0

3. Parts Modified and Reidentified ................................ 2 0

4. Parts Removed and Not Replaced .............................. 2 0 D. Parts Necessary to Change Spares ................................. 2 0 E. Special Tooling - Price and Availability ............................... 2 0 F. Special Tooling Necessary to do this Service Bulletin ....................... 2 0

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 1 A. GENERAL INFORMATION ..................................... 2 1 B. WORK INSTRUCTIONS ....................................... 2 2 FIGURE 1: ACCESS ............................................ 2 6 FIGURE 2: INSPECTION .......................................... 2 8 FIGURE 3: REPLACEMENT AND REPAIR ................................ 3 3 APPENDIX A: CONDUCTIVITY TEST EXAMPLES ............................. 3 8 APPENDIX B: INDIRECT CONDUCTIVITY EDDY CURRENT INSPECTION ................ 3 9

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 3 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 4 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

BLANK PAGE

Commercial Airplanes 777 Service Bulletin ALERT SummaryNumber: 777-24A0119Original Issue: November 11, 2011 ATA System: 2421 5383 SUBJECT: ELECTRICAL POWER - Power and Regulation - Inspection and if Necessary, Repair of Clamps, Power Feeder Cable, Insulation Blanket and Aft Pressure Bulkhead

THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH

1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OWNER.

CONCURRENT REQUIREMENTS None.

BACKGROUND Accomplishment of this service bulletin will prevent failure of the clamp at station 2150 between stringer 3R and 4R, and within the section 48 flammable fluid leakage zone. If not incorporated, a failed clamp can result in wire chafing and potential electrical arcing which might cause a fire in section 48 which is identified as flammable fluid leakage zone, or heat damage to the Auxiliary Power Unit (APU) power feeder cable, insulation blankets and/or pressure bulkhead at station 2150.

An operator has reported failure of the clamp at station 2150 and between stringer 3R and 4R in the forward section of the aft pressure bulkhead. The chafing caused by the failed clamp resulted in heat damage to the APU power feeder cables, insulation blankets, and the pressure bulkhead adjacent to the clamp.

This service bulletin gives the instructions to do a Detailed Inspection of the clamps at station 2150 and in the 48 section aft of the pressure bulkhead. If non-TA clamps, or damage to the cable, blankets and the pressure bulkhead are found, this service bulletin gives procedures to replace the existing non-TA clamps with the TA clamps, and to repair the cable, the blanket and the pressure bulkhead if required.

Boeing Service Related Problem (SRP) 777-SRP-24-0139 is related to this service bulletin. This SRP is described in Fleet Team Digest Article 777 FTD 24-10003.

ACTION (PRR 62777-84S) Gain access to the APU power feeder cable between stringer 3R and 4R at station 2150.

Gain access to the APU power feeder cable in the 48 section.

Do a Detailed Inspection of the clamps on the APU power feeder cable. Replace the existing non-TA clamps with the TA clamps.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 5 of 41

Do a General Visual Inspection of the APU power feeder cable for cable damage. Repair damaged cable if found.

Do a General Visual Inspection of the insulation blanket adjacent to the clamp at station 2150 and between stringer 3R and 4R. Repair damaged insulation blanket if found.

Do a test to determine damage to the aft pressure bulkhead and structure. Contact Boeing for repair instructions if damage is found.

Close access.

EFFECTIVITY 777-200, 777-200LR, 777-300, 777-300ER, and 777F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.

COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that the change given in this service bulletin be done within 48 months of the original issue of this service bulletin.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of July 22, 2010. Please refer to Paragraph

2.B., Industry Support Information.

MANPOWER Refer to Paragraph 1.G., Manpower.

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 6 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

Page 7OCROpen in PDF

BOEING SERVICE BULLETIN 777-24A0119

ALERT ALERT STA 2150 -INSPECT TA CLAMPS, APU POWER

FEEDER CABLE, INSULATION BLANKET

- REPLACE WITH TA CLAMP (IF REQUIRED)

- REPAIR WIRE BUNDLE (IF REQUIRED)

- REPAIR INSULATION BLANKET (IF REQUIRED) -DO TEST TO FIND HEAT DAMAGE TO AFT

PRESSURE BULKHEAD AND STRUCTURE (IF REQUIRED)

APU POWER

FEEDER CABLE CLAMPS (23 LOCATIONS) STA AFT 2150

PRESSURE

BULKHEAD 2084085 Original Issue: November 11, 2011 BOEING PROPRIETARY - 777-24A0119 Copyright © Unpublished Work - See page 1 for details. 7 of 41

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 8 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

BLANK PAGE

Commercial Airplanes 777 Service Bulletin ALERT Number: 777-24A0119 Original Issue: November 11, 2011 ATA System: 2421 5383 SUBJECT: ELECTRICAL POWER - Power and Regulation - Inspection and if Necessary, Repair of Clamps, Power Feeder Cable, Insulation Blanket and Aft Pressure Bulkhead

THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH

1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OWNER.

1. PLANNING INFORMATION A. Effectivity

1. Airplanes Refer to Service Bulletin Index D624W001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRR 62777-84S for data about this change.

DESCRIPTIONCONFIGURATIONGROUP Freighter Airplanes-1 Passenger Airplanes-2 Airplane Models:

777-200, 777-200LR, 777-300, 777-300ER, 777F GroupVariable Number 2WA001 - WA017 2WA076 - WA079 2WA086 - WA093 2WA101 - WA104 2WA116 - WA119

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 9 of 41

GroupVariable Number 2WA131 - WA137 2WA171 - WA175 2WA196 - WA198 2WA206 - WA212 2WA221 - WA223 2WA231 - WA232 2WA241 - WA250 2WA261 - WA266 2WA281 - WA283 2WA301 - WA304 2WB001 - WB021 2WB031 - WB042 2WB044 - WB046 2WB051 - WB088 2WB101 - WB106 2WB121 - WB125 2WB131 - WB148 2WB151 - WB155 2WB161 - WB177 2WB181 - WB194 2WB201 - WB215 2WB231 - WB247 2WB271 - WB273 2WB276 - WB286 2WB291 - WB302 2WB306 - WB307 2WB311 - WB337 2WB341 - WB342 2WB366 - WB368 2WB371 - WB388 2WB406 2WB411 - WB413 2WB416 - WB439

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 10 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

GroupVariable Number 2WB446 - WB453 2WB476 2WB481 - WB484 2WB501 - WB512 2WB531 - WB537 2WB551 - WB554 2WB591 - WB597 2WB601 - WB606 2WB611 - WB622 2WB631 - WB638 2WB646 - WB649 2WC051 - WC073 2WC101 - WC104 2WC111 - WC120 2WC221 - WC224 2WC241 - WC243 2WC281 - WC290 2WC301 - WC308 2WC361 - WC364 2WC371 - WC374 2WC381 - WC395 2WC441 2WC446 - WC449 2WC456 - WC459 2WC486 - WC493 2WC506 - WC508 2WC521 - WC522 2WC531 - WC536 2WC546 - WC548 2WC556 2WC566 - WC567 2WC571 - WC574 2WC581

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 11 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

GroupVariable Number 2WD001 - WD002 2WD011 - WD018 2WD031 - WD036 2WD046 - WD055 2WD066 - WD075 2WD081 - WD088 2WD091 2WD096 2WD101 - WD105 2WD111 2WD501 - WD513 2WD521 - WD541 2WD546 - WD554 2WD561 - WD573 2WD581 - WD599 2WD606 - WD609 2WD621 - WD632 2WD651 - WD665 2WD671 - WD677 2WD691 - WD709 2WD741 - WD752 2WD761 - WD771 2WD786 - WD788 2WD796 - WD817 2WD826 - WD837 2WD846 - WD863 2WD871 - WD885 2WD911 - WD915 2WD921 - WD922 2WD936 - WD939 2WD946 - WD953 2WD966 - WD970 2WD981 - WD982

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 11, 2011 777-24A0119 12 of 41 BOEING SERVICE BULLETIN 777-24A0119

ALERTALERT

Pages 13–24 of 41