© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-2546; AD 2026-15-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'f046137e98047dba3951c557fc0fa021d784cea312ecf954978af2d8a2f2b058'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 777 Requirements Bulletin ALERT Number: 777-28A0098 RB Original Issue: August 15, 2025 ATA System: 2822 SUBJECT: FUEL - Engine Fuel Feed System - Engine Fuel Feed Tube Spar, Sealant Inspection and Electrical Bonding Resistance Measurement EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.

9E991ECCN:

Copyright © 2025 The Boeing Company Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: August 15, 2025 777-28A0098 RB 1 of 231

5.0

Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 2 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

BLANK PAGE

Table of Contents

1. EFFECTIVITY5

A. Airplanes5

B. Spares Affected8

2. CONCURRENT REQUIREMENTS9

3. COMPLIANCE9

4. APPROVAL46

5. ACCOMPLISHMENT INSTRUCTIONS47

A. General Information47

B. Work Instructions48

FIGURE 1: LEFT WING - FORWARD FRONT SPAR TO THREADED PORTION OF FRONT SPAR BULKHEAD FITTING - ELECTRICAL BONDING RESISTANCE MEASUREMENT . . . 101 FIGURE 2: LEFT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT INSPECTION

.104

FIGURE 3: LEFT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT APPLICATION

.107

FIGURE 4: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND

TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT

[Group 1]110

FIGURE 5: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND

TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 1]113

FIGURE 6: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND

TUBE CLAMPS INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT

[Group 2]118

FIGURE 7: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND

TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 2]121

FIGURE 8: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING

JUMPER AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE

MEASUREMENT [Group 2]125

FIGURE 9: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 2] . . 128 FIGURE 10: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING

JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE

MEASUREMENT [Group 1-2, Configuration 2]135

FIGURE 11: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING JUMPERS AND TUBE CLAMPS – REMOVAL, CLEAN AND INSTALLATION [Group 1-2,

Configuration 2]138

FIGURE 12: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING

JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE

MEASUREMENT [Group 1-2, Configuration 3]145

FIGURE 13: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 1-2,

Configuration 3]148

FIGURE 14: RIGHT WING - FORWARD FRONT SPAR TO THREADED PORTION OF FRONT SPAR BULKHEAD FITTING - ELECTRICAL BONDING RESISTANCE MEASUREMENT . . . 157 FIGURE 15: RIGHT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT

INSPECTION160

FIGURE 16: RIGHT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT

APPLICATION163

Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 3 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

FIGURE 17: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER

AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT

[Group 1]166

FIGURE 18: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER

AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 1]169

FIGURE 19: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER

AND TUBE CLAMPS INSPECTION AND ELECTRICAL BONDING RESISTANCE

MEASUREMENT [Group 2]174

FIGURE 20: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER

AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 2]177

FIGURE 21: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING

JUMPER AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE

MEASUREMENT [Group 2]181

FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 2] . . 184 FIGURE 23: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING

JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE

MEASUREMENT [Group 1-2, Configuration 2]191

FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 1-2,

Configuration 2]194

FIGURE 25: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING

JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE

MEASUREMENT [Group 1-2, Configuration 3]201

FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 1-2,

Configuration 3]204

APPENDIX D: MAXIMUM ELECTRICAL BONDING RESISTANCES213

APPENDIX F: FRONT SPAR BULKHEAD FITTING CLEANING REQUIREMENTS217

APPENDIX G: AFT SIDE FRONT SPAR BULKHEAD FITTING SEALANT APPLICATION220

APPENDIX H: ACCEPTABLE BONDING JUMPER INSTALLATIONS231

Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 4 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

Commercial Airplanes 777 Requirements Bulletin ALERT Number: 777-28A0098 RB Original Issue: August 15, 2025 ATA System: 2822 SUBJECT: FUEL - Engine Fuel Feed System - Engine Fuel Feed Tube Spar, Sealant Inspection and Electrical Bonding Resistance Measurement

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER.

THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED

TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

1. Effectivity A. Airplanes This bulletin is applicable to 777-200, 777-200LR, 777-300, 777-300ER, 777F Airplane(s), line number(s) 1-1566, 1568-1573, 1575-1580, 1582-1586, 1588-1604, 1606-1610, 1612-1614, 1616-1619, 1621-1623, 1625-1628, 1630-1632, 1634-1637, 1639-1641, 1643-1646, 1648-1650, 1652-1655, 1657-1658, 1660-1667, 1669, 1671, 1673, 1675-1676, 1678-1679, 1681, 1683-1684, 1686-1687, 1689-1715, 1717-1722, 1724-1727, 1729-1736, 1738-1739, 1741-1745, 1747-1780, 1782-1784, 1786-1787, 1789-1793, 1795-1797, 1799-1800, 1802, 1804-1805, 1807, 1809-1810, 1812, 1814-1815, 1817, 1819-1820, 1822, 1824-1825, 1827, 1829-1830, 1832, 1834-1835, 1837-1838, 1840-99999 in 2 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.

The Variable Numbers and Group Information for the applicable airplanes is given below.

NOTE: The Variable Number table below includes affected airplanes available as of the issue date of this bulletin. Affected airplane Variable Numbers added to MyBoeingFleet.com after the issue date of this bulletin will be shown using the Maintenance Performance Toolbox EFFECTIVITY search function result.

Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 5 of 231

DESCRIPTIONCONFIGURATIONGROUP 777-200,-200LR,-300,-300ER and 777F Airplane line numbers 1 thru 829 that require an electrical bonding resistance measurement between the engine fuel feed tube bulkhead fitting and the front spar.

-1 Airplanes equipped with GE engines.1 Airplanes equipped with Pratt and Whitney engines.2 Airplanes equipped with Rolls-Royce engines.3 777-200,-200LR,-300,-300ER and 777F Airplane line numbers 830 and on that require an electrical bonding resistance measurement between the engine fuel feed tube bulkhead fitting and the front spar.

-2 Airplanes equipped with GE engines.1 Airplanes equipped with Pratt and Whitney engines.2 Airplanes equipped with Rolls-Royce engines.3 Airplane Models:

777-200, 777-200LR, 777-300, 777-300ER, 777F GroupVariable Number 1WA001 - WA017 1WA076 - WA080 1WA086 - WA093 1WA101 - WA104 1WA116 - WA119 1WA131 - WA137 1WA171 - WA175 1WA196 - WA198 1WA206 - WA212 1WA221 - WA223 1WA231 - WA232 1WA241 - WA250 1WA261 - WA266 1WA281 - WA283 GroupVariable Number 1WA301 - WA304 1WB001 - WB021 1WB031 - WB046 1WB051 - WB088 1WB101 - WB106 1WB121 - WB125 1WB131 - WB148 1WB151 - WB155 1WB161 - WB177 1WB181 - WB194 1WB201 - WB215 1WB231 - WB247 1WB271 - WB273 1WB276 - WB286 GroupVariable Number 1WB291 - WB302 1WB306 - WB307 1WB311 - WB337 1WB341 - WB342 1WB366 - WB368 1WB371 - WB388 1WB406 1WB411 - WB413 1WB416 - WB439 1WB446 - WB453 1WB476 1WB481 - WB484 1WB501 - WB512 1WB531 - WB537 Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 6 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

GroupVariable Number 1WB551 - WB554 1WB591 - WB597 1WB601 - WB606 1WB611 - WB622 1WB631 - WB638 1WB646 - WB649 1WC051 - WC073 1WC101 - WC104 1WC111 - WC120 1WC221 - WC222 2WC223 - WC224 1WC241 - WC243 1WC281 - WC290 1WC301 - WC308 1WC361 - WC364 1WC371 - WC374 1WC381 - WC395 1WC441 1WC446 - WC449 1WC456 - WC459 1WC486 - WC493 1WC506 - WC508 1WC521 - WC522 1WC531 - WC536 1WC546 - WC548 1WC556 1WC566 - WC567 1WC571 - WC574 2WC581 2WC586 - WC587 2WC591 - WC595 1WD001 - WD002 1WD011 - WD018 GroupVariable Number 1WD031 - WD036 1WD046 - WD055 1WD066 - WD073 2WD074 - WD075 1WD081 - WD083 2WD084 - WD089 2WD091 2WD096 2WD101 - WD106 2WD111 - WD112 2WD116 - WD117 2WD121 - WD123 2WD156 1WD501 - WD513 1WD521 - WD541 1WD546 - WD554 1WD561 - WD573 1WD581 - WD599 1WD606 - WD609 1WD621 - WD632 1WD651 - WD664 2WD665 1WD671 - WD675 2WD676 - WD677 1WD691 - WD709 1WD741 - WD752 1WD761 - WD771 1WD786 - WD788 1WD796 - WD807 2WD808 - WD825 1WD826 - WD834 2WD835 - WD837 1WD846 - WD859 GroupVariable Number 2WD860 - WD867 1WD871 - WD878 2WD879 - WD910 1WD911 - WD914 2WD915 - WD918 2WD921 - WD935 1WD936 - WD939 2WD940 - WD945 1WD946 - WD948 2WD949 - WD957 1WD966 - WD969 2WD970 1WD981 - WD982 1WD986 2WD987 2WD991 - WD996 2WE001 - WE007 2WE011 - WE012 2WE021 - WE026 2WE031 - WE040 2WE051 - WE057 2WE071 - WE078 2WE081 - WE084 2WE091 - WE095 2WE126 - WE178 2WE186 - WE219 2WE226 - WE231 2WE236 - WE253 2WE261 - WE267 2WE271 - WE278 2WE291 - WE298 2WE301 - WE320 2WE331 - WE356 Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 7 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

GroupVariable Number 2WE366 - WE368 2WE376 - WE377 2WE381 2WE386 - WE387 2WE391 - WE392 2WE396 - WE411 2WE416 - WE420 2WE426 - WE431 2WE436 - WE446 2WE451 - WE484 2WE486 - WE493 2WE495 - WE499 2WE501 - WE504 2WE511 - WE516 2WE526 - WE528 2WE536 - WE549 2WE556 - WE573 2WE576 - WE587 2WE591 2WE601 - WE605 2WE626 - WE627 2WE631 2WE641 - WE642 2WE646 - WE647 2WE651 - WE661 2WE666 - WE677 2WE681 - WE689 2WE701 - WE705 2WE711 - WE712 2WE731 - WE732 2WE736 - WE740 GroupVariable Number 2WE746 - WE772 2WE776 - WE786 2WE791 - WE792 2WE796 - WE798 2WE801 - WE806 2WE811 - WE812 2WE826 - WE828 2WE831 - WE835 2WE851 - WE853 2WE856 - WE857 2WE861 - WE863 2WE866 - WE868 2WE871 1WF001 - WF004 1WF016 - WF019 2WF020 - WF030 1WF031 - WF032 2WF033 - WF043 1WF046 - WF047 2WF048 - WF075 1WF076 - WF077 1WF081 - WF082 2WF083 - WF088 2WF096 - WF101 2WF106 - WF109 2WF111 - WF124 2WF131 - WF144 2WF146 - WF147 2WF151 - WF152 2WF156 - WF173 2WF176 - WF184 GroupVariable Number 2WF191 2WF201 2WF206 - WF217 2WF221 - WF229 2WF231 - WF251 2WF256 - WF262 2WF266 - WF288 2WF296 - WF298 2WF301 - WF323 2WF326 - WF330 2WF336 - WF350 2WF356 - WF359 2WF366 - WF377 2WF381 - WF390 2WF396 - WF399 2WF401 - WF404 2WF411 - WF412 2WF416 - WF417 2WF421 2WF426 - WF427 2WF431 - WF435 2WF441 - WF442 2WF446 - WF449 2WF456 2WF461 - WF462 2WF471 - WF472 2WF476 - WF477 2WF482 - WF483 2WF486 - WF487 2WF491 - WF492 -- B. Spares Affected None.

Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 8 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

2. CONCURRENT REQUIREMENTS None.

3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin 777-28A0098 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin 777-28A0098 RB mandatory.

Accomplish the required actions, based on the applicable conditions in Tables 1 through 4, in accordance with Accomplishment Instructions.

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.

The Conditions, Actions, and Compliance times shown in the Tables below apply to the Left and Right side independently.

Group 1, Configuration 1:

Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition -Within 39 months after the Original Issue date of Requirements Bulletin 777-28A0098 RB.

Do an electrical bonding resistance measurement between the forward side of the front spar and the threaded portion of the front spar bulkhead fitting.

All Airplanes 39 Months.-Repeat the electrical bonding resistance measurement between the forward side of the front spar and the threaded portion of the front spar bulkhead fitting.

CONDITION 1: ELECTRI-

CAL BONDING RESIS-

TANCE MEASUREMENT

BETWEEN THE FORWARD

SIDE OF THE FRONT

SPAR AND THE THREAD-

ED PORTION OF THE

FRONT SPAR BULKHEAD FITTING IS 1.0 MILLIOHM

OR LESS Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 9 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

Group 1, Configuration 1:

Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition -Before further flight.Do a Detailed Inspection (DET) of the AFT side of the front spar bulkhead fitting and coupling for any area without sealant, for any damaged sealant, and for any insufficient sealant. (a)(b) CONDITION 2: ELECTRI-

CAL BONDING RESIS-

TANCE MEASUREMENT

BETWEEN THE FORWARD

SIDE OF THE FRONT

SPAR AND THE THREAD-

ED PORTION OF THE

FRONT SPAR BULKHEAD

FITTING IS MORE THAN

1.0 MILLIOHM -Before further flight.CONDITION 2.1 (ACTION 1):

Remove any existing sealant from the AFT side of the front spar bulkhead fitting and coupling and apply sealant.

CONDITION 2.1: ANY AREA

WITHOUT SEALANT, OR

ANY DAMAGED SEALANT,

OR ANY INSUFFICIENT

SEALANT FOUND -Before further flight.CONDITION 2.1 (ACTION 2):

Do a DET of the in-tank engine fuel feed tube to wing structure bonding jumper and tube clamp for correct installation, and do an electrical bonding resistance measurement between the wing structure and in-tank engine fuel feed tube. (c) -Before further flight.CONDITION 2.1.1 (ACTION 1):

Remove the bonding jumper and tube clamp. Clean electrical bond surfaces. Install new or serviceable bonding jumper and tube clamp. Make sure the electrical bonding resistance measurement between the wing structure and in-tank engine fuel feed tube is 2.5 milliohms or less.

CONDITION 2.1.1: ANY IN-

CORRECT INSTALLATION

OF THE BONDING

JUMPER OR TUBE CLAMP

FOUND, OR ELECTRICAL

BONDING RESISTANCE

MEASUREMENT BE-

TWEEN THE WING

STRUCTURE AND IN-TANK

ENGINE FUEL FEED TUBE IS MORE THAN 4.0 MIL- LIOHMS 39 Months.-CONDITION 2.1.1 (ACTION 2):

Repeat the electrical bonding resistance measurement between the forward side of the front spar and the threaded portion of the front spar bulkhead fitting.

Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 10 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

Group 1, Configuration 1:

Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition 39 Months.-Repeat the electrical bonding resistance measurement between the forward side of the front spar and the threaded portion of the front spar bulkhead fitting.

CONDITION 2.1.2: COR-

RECT INSTALLATION OF

THE BONDING JUMPER

AND TUBE CLAMP FOUND,

AND ELECTRICAL BOND-

ING RESISTANCE MEA-

SUREMENT BETWEEN

THE WING STRUCTURE

AND IN-TANK ENGINE FU- EL FEED TUBE IS 4.0 MIL-

LIOHMS OR LESS -Before further flight.Do a DET of the in-tank engine fuel feed tube to wing structure bonding jumper and tube clamp for correct installation, and do an electrical bonding resistance measurement between the wing structure and in-tank engine fuel feed tube. (c) CONDITION 2.2: NO AREA

WITHOUT SEALANT, NO

DAMAGED SEALANT, AND

NO INSUFFICIENT

SEALANT FOUND -Before further flight.CONDITION 2.2.1 (ACTION 1):

Remove the bonding jumper and tube clamp. Clean electrical bond surfaces. Install new or serviceable bonding jumper and tube clamp. Make sure the electrical bonding resistance measurement between the wing structure and in-tank engine fuel feed tube is 2.5 milliohms or less.

CONDITION 2.2.1: ANY IN-

CORRECT INSTALLATION

OF THE BONDING

JUMPER OR TUBE CLAMP

FOUND, OR ELECTRICAL

BONDING RESISTANCE

MEASUREMENT BE-

TWEEN THE WING

STRUCTURE AND IN-TANK

ENGINE FUEL FEED TUBE IS MORE THAN 4.0 MIL- LIOHMS 39 Months.-CONDITION 2.2.1 (ACTION 2):

Repeat the electrical bonding resistance measurement between the forward side of the front spar and the threaded portion of the front spar bulkhead fitting.

Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 11 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

Group 1, Configuration 1:

Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition 39 Months.-Repeat the electrical bonding resistance measurement between the forward side of the front spar and the threaded portion of the front spar bulkhead fitting.

CONDITION 2.2.2: COR-

RECT INSTALLATION OF

THE BONDING JUMPER

AND TUBE CLAMP FOUND,

AND ELECTRICAL BOND-

ING RESISTANCE MEA-

SUREMENT BETWEEN

THE WING STRUCTURE

AND IN-TANK ENGINE FU- EL FEED TUBE IS 4.0 MIL-

LIOHMS OR LESS

(a) Damaged sealant is defined as any crack or void in the sealant, any disbonded sealant from surfaces, and any exposed underlying metallic surface.

(b) Sealant is considered insufficient when the thickness of the sealant allows for the outline of the coupling or fitting hardware to be visible under the sealant.

(c) Bonding jumper and tube clamp correct installation is defined as no damaged or missing bonding jumper or tube clamp found, and no loose bonding jumper lugs or tube clamp found. Bonding jumper damage is defined as one or more broken strands in the wire braid. Tube clamp damage is defined as tube clamp being cracked, broken or screw hole elongated. Loose condition is defined as component rotation when trying to rotate with light finger pressure.

Group 1, Configuration 2-3:

Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition -Within 39 months after the Original Issue date of Requirements Bulletin 777-28A0098 RB.

Do a Detailed Inspection (DET) of the out-tank engine fuel feed tube to engine nacelle strut bonding jumper and tube clamp for correct installation, and do an electrical bonding resistance measurement between the nacelle strut structure and out-tank engine fuel feed tube. (a) All Airplanes Export Controlled ECCN: 9E991 See page 1 for details Original Issue: August 15, 2025 777-28A0098 RB 12 of 231 REQUIREMENTS BULLETIN 777-28A0098

ALERTALERT

Pages 13–24 of 162