Copy · 777-57A0128_RB_00- part 3 · 24 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-1339, the docket of a proposed AD (Federal Register 2026-03782). Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'ce3ca85029b064f05d201168598ceee4179ee930abdb3fb6dad0f9776dfb7008'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

- REPLACEMENT (SHEET 2 OF 8) Export Controlled ECCN: 9E991 See page 1 for details Original Issue: June 02, 2025 777-57A0128 RB 97 of 144 REQUIREMENTS BULLETIN 777-57A0128

ALERTALERT

FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

- REPLACEMENT (SHEET 3 OF 8) Export Controlled ECCN: 9E991 See page 1 for details Original Issue: June 02, 2025 777-57A0128 RB 98 of 144 REQUIREMENTS BULLETIN 777-57A0128

ALERTALERT

Page 3OCROpen in PDF

REQUIREMENTS BULLETIN 777-57A0128

ALERT ALERT

MAIN LANDING GEAR

SUPPORT BEAM SHIM

(22)

9) 6 LOCATIONS 14 16 15 16) 4 LOCATIONS

MAIN LANDING

GEAR SUPPORT BEAM FWD

VIEW IN THE DOWN DIRECTION (TYPICAL) B-B NBD 6 LOCATIONS

VIEW IN THE AFT DIRECTION (TYPICAL) C-C 2 LOCATIONS 20

MAIN LANDING 4 LOCATIONS (19) 21 GEAR SUPPORT BEAM (18- INBD

VIEW IN THE AFT DIRECTION (TYPICAL) D-D 3079088 FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

- REPLACEMENT (SHEET 4 OF 8) Original Issue: June 02, 2025 Export Controlled ECCN: 9E991 777-57A0128 RB See page 1 for details 99 of 144

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY numbers shown below are the number of parts necessary for this figure.

More DataQtyIdentificationNameTaskStep -1NAS1805-4NUTRemove1 -1115W1672-10RETAINER CAPRemove2

(a)(b)1BACB30MR4K71BOLTRemove3 -1115W1672-14RETAINER CAPRemove4 -1BACN10JC9CMNUTRemove5 -1115W1672-9RETAINER CAPRemove6 -1115W1671-17PIN, LOWER AFTRemove7 ---LOWER STABILIZER BRACE Disconnect8 If not already removed.

6-FASTENERSRemove9

(a)(b) Keep the left MLG Support Beam Lower Stabilizer Brace AFT Fitting to use for hole transfer into the new fitting.

1-MLG SUPPORT BEAM

LOWER STABILIZER

BRACE AFT FITTING Remove10 -1-SHIMRemove11

(c)--MLG SUPPORT BEAMClean12

(d)--MLG SUPPORT BEAMInspect13 Drill to Hole Diameter 0.3745 - 0.3755 inch (e)(f)(g) -115W1613U17FITTING AYDrill14 Drill to Hole Diameter 0.312 - 0.313 inch (e)(f)(g) -115W1613U17FITTING AYDrill15 Break all sharp edges on drilled holes.

6-FASTENER HOLESDeburr16 -1115W1613U17FITTING AYPut / Hold17

(i)(j)1BACS40R035C040FSHIM STOCKPut / Hold

(h)-BMS 5-95SEALANTApply18 FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

- REPLACEMENT (SHEET 5 OF 8) Export Controlled ECCN: 9E991 See page 1 for details Original Issue: June 02, 2025 777-57A0128 RB 100 of 144 REQUIREMENTS BULLETIN 777-57A0128

ALERTALERT

More DataQtyIdentificationNameTaskStep -1115W1613U17FITTING AYInstall (New)19

(j)1BACS40R035C040FSHIM STOCKInstall (New)

(b)(k)(l)4BACB30US5K32BOLT, 12 PT HEADInstall (New) Install under bolt head.

4BACW10BP5CDCSK WASHERInstall (New) Install under nut.4BACW10BP5DPWASHER-PLAINInstall (New) Torque nut to 243 to 258 inch-lbs.

4BACN10HR5CDNUTInstall (New)

(m)

(b)(k)(l)2BACB30US6K32BOLT, 12 PT HEADInstall (New)20 Install under bolt head.

2BACW10BP6CDWASHER, PLAINInstall (New) Install under nut.2BACW10BP6DPWASHERInstall (New) Torque nut to 485 to 515 inch-lbs.

2BACN10HR6CDSELF-LOCKING NUTInstall (New)

(m)

(n)4BACN10HR5CDNUTTorque21

(n)2BACN10HR6CDSELF-LOCKING NUTTorque -2AS15001-1PFITTING, LUBRICA- TION Install (New)22 ---LOWER STABILIZER BRACE Connect23 -1115W1671-17PIN, LOWER AFTInstall (New)24 -1115W1672-9RETAINER CAPInstall (New)25 Torque nut to 300 to 400 inch-lbs.

1BACN10JC9CMNUTInstall (New)26 -1115W1672-14RETAINER CAPInstall (New)27

(b)(l)(o)1BACB30MR4A71BOLTInstall (New)28 -1115W1672-10RETAINER CAPInstall (New)29 Torque nut to 82 to 88 inch-lbs.

1BACN11Z4CKNUTInstall (New)30

(p)-BMS 3-33GREASEApply31

(q)-115W1613U17FITTING AYIdentify32

(a) Make a note of the fastener orientation for installation.

FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

- REPLACEMENT (SHEET 6 OF 8) Export Controlled ECCN: 9E991 See page 1 for details Original Issue: June 02, 2025 777-57A0128 RB 101 of 144 REQUIREMENTS BULLETIN 777-57A0128

ALERTALERT

More DataQtyIdentificationNameTaskStep

(b) Refer to 777-200 SRM 51-40-02, 777-300 SRM 51-40-02, or 777F SRM 51-40-02 as an accepted procedure.

(c) Use non-metallic tools to remove sealant from the upper and lower surfaces of the left MLG Support Beam where the existing left MLG Support Beam Lower Stabilizer Brace AFT Fitting and shim were installed.

Refer to SOPM 20-30-03 as an accepted procedure.

(d) Do an open hole High Frequency Eddy Current (HFEC) inspection of the MLG Support Beam for any crack, in accordance with 777 NDT Manual Part 6, 51-00-02. If any crack is found, contact The Boeing Company for repair instructions and do the repair.

(e) Use Special Tool MIT115W1613 to transfer hole locations from the existing left MLG Support Beam Lower Stabilizer Brace AFT Fitting to new blank AFT Fitting in accordance with the MIT115W1613 tool use instructions.

(f) As an alternative to the MIT115W1613 tool use instructions, it is acceptable to use a mill machine to map and transfer close ream hole locations from the existing left MLG Support Beam Lower Stabilizer Brace AFT Fitting to new blank AFT Fitting. Refer to 777-200 SRM 51-40-05, 777-300 SRM 51-40-05, or 777F SRM 51-40-05 as an accepted procedure.

(g) It is acceptable to oversize fastener holes, within the left MLG Support Beam Lower Stabilizer Brace AFT Fitting and left MLG Support Beam, to 1st oversized close ream fastener holes if nominal close ream fastener hole diameters can not be achieved. Additional oversize fasteners have been provided in 005W0183-12 kit. Refer to 777-200 SRM 51-40-05, 777-300 SRM 51-40-05, or 777F SRM 51-40-05 as an accepted procedure.

(h) Apply faying surface seal using BMS 5-95 sealant on all mating surfaces. Refer to SOPM 20-50-19 as an accepted procedure.

(i) Install shim between the upper flange of the left MLG Support Beam Lower Stabilizer Brace AFT Fitting and the left MLG Support Beam. Remove 0.003 inch laminations as required to adjust thickness. Trim profile of shim. Taper shim if required. Maintain edge condition. Refer to SOPM 20-50-20 as an accepted procedure.

(j) Maximum pull-up after shim installation to be 0.005 inch.

(k) Install fasteners wet with BMS 5-95 sealant. Refer to SOPM 20-50-19 Method 2 as an accepted procedure.

(l) Install fasteners following the orientation noted during removal.

(m) Torque the nuts with a minimum of 60 minutes of squeeze-out life left in the fastener and fay surface sealant. Refer to 777-200 SRM 51-40-02, 777-300 SRM 51-40-02, or 777F SRM 51-40-02 as an accepted procedure.

FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

- REPLACEMENT (SHEET 7 OF 8) Export Controlled ECCN: 9E991 See page 1 for details Original Issue: June 02, 2025 777-57A0128 RB 102 of 144 REQUIREMENTS BULLETIN 777-57A0128

ALERTALERT

More DataQtyIdentificationNameTaskStep

(n) Re-apply torque to the nuts no sooner than:

- 10 minutes after the initial torque application, if Class B-1/2 or B-2 sealant was used.

- 10 minutes after the initial torque application, if Class C-20, C-24 or C-48 sealant was used.

- 60 minutes after the initial torque application, if sealant with a squeeze-out life longer than 48 hours was used.

Make sure torque re-application is done before the squeeze-out life of the fastener and fay surface sealant expires. Refer to 777-200 SRM 51-40-02, 777-300 SRM 51-40-02, or 777F SRM 51-40-02 as an accepted procedure.

(o) Install fasteners wet with BMS 5-95 sealant. Refer to SOPM 20-50-19 as an accepted procedure.

(p) Lubricate the grease fittings with BMS 3-33 grease after installation of the left MLG Support Beam Lower Stabilizer Brace AFT Fitting. Refer to 777 AMM 12-21-11 as an accepted procedure.

(q) Apply the service bulletin number to the left MLG Support Beam Lower Stabilizer Brace AFT Fitting at this area only. Refer to SOPM 20-50-10, Code M as an accepted procedure.

FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

- REPLACEMENT (SHEET 8 OF 8) Export Controlled ECCN: 9E991 See page 1 for details Original Issue: June 02, 2025 777-57A0128 RB 103 of 144 REQUIREMENTS BULLETIN 777-57A0128

ALERTALERT

Page 8OCROpen in PDF

REQUIREMENTS BULLETIN 777-57A0128

ALERT ALERT FWD

MAIN LANDING GEAR LOWER STABILIZER BRACE 3075990 FIGURE 13: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING,

MLG SUPPORT BEAM AND STABILIZER BRACE - DETAILED INSPECTION (DET) (SHEET 1 OF 4) Original Issue: June 02, 2025 Export Controlled ECCN: 9E991 777-57A0128 RB See page 1 for details 104 of 144

Page 9OCROpen in PDF

REQUIREMENTS BULLETIN 777-57A0128

ALERT ALERT

MAIN LANDING GEAR

SUPPORT BEAM

LOWER STABILIZER

• BRACE FWD

WING REAR SPAR

ASSEMBLY

MAIN LANDING GEAR VIEW IN THE INBOARD DIRECTION

SUPPORT BEAM LOWER (TYPICAL)

FITTING STABILIZER BRACE AFT A-A

MAIN LANDING GEAR

SUPPORT BEAM

5.10

4.90

2.60

2.40

- SHIM

5.10

4.90

LOWER STABILIZER BRACE

MAIN LANDING GEAR

SUPPORT BEAM LOWER

STABILIZER BRACE AFT - WD

FITTING DETAILED INSPECTION VIEW IN THE DOWN DIRECTION (TYPICAL) 3075996 B-B FIGURE 13: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING,

MLG SUPPORT BEAM AND STABILIZER BRACE - DETAILED INSPECTION (DET) (SHEET 2 OF 4) Original Issue: June 02, 2025 Export Controlled ECCN: 9E991 777-57A0128 RB See page 1 for details 105 of 144

Page 10OCROpen in PDF

REQUIREMENTS BULLETIN 777-57A0128

ALERT ALERT

MAIN LANDING GEAR

SUPPORT BEAM LOWER

STABILIZER BRACE

5.10

4.90

2.60

2.40 ₴

MAIN LANDING GEAR

SUPPORT BEAM

LOWER STABILIZER

BRACE AFT FITTING

5.10

4.90

5.10 .90 FWD

VIEW IN THE UP DIRECTION (TYPICAL) C-C DETAILED INSPECTION 3075998 FIGURE 13: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING,

MLG SUPPORT BEAM AND STABILIZER BRACE - DETAILED INSPECTION (DET) (SHEET 3 OF 4) Original Issue: June 02, 2025 Export Controlled ECCN: 9E991 777-57A0128 RB See page 1 for details 106 of 144

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY numbers shown below are the number of parts necessary for this figure.

More DataQtyIdentificationNameTaskStep

(a)--MLG SUPPORT BEAM

LOWER STABILIZER

BRACE AFT FITTING Inspect1

(b)(c)--MLG SUPPORT BEAMInspect2

(b)(c)--LOWER STABILIZER BRACE Inspect

(a) Do a DET of the right MLG Support Beam Lower Stabilizer Brace AFT Fitting for any crack.

(b) Do a DET of the right MLG Support Beam and Lower Stabilizer Brace for any damage.

(c) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.

FIGURE 13: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING,

MLG SUPPORT BEAM AND STABILIZER BRACE - DETAILED INSPECTION (DET) (SHEET 4 OF 4) Export Controlled ECCN: 9E991 See page 1 for details Original Issue: June 02, 2025 777-57A0128 RB 107 of 144 REQUIREMENTS BULLETIN 777-57A0128

ALERTALERT

Page 12OCROpen in PDF

REQUIREMENTS BULLETIN 777-57A0128

ALERT ALERT FWD

MAIN LANDING GEAR LOWER STABILIZER BRACE 3079101 FIGURE 15: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING

AND MLG SUPPORT BEAM - OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION (SHEET 1 OF 3) Original Issue: June 02, 2025 777-57A0128 RB Export Controlled ECCN: 9E991 See page 1 for details 108 of 144