On this page
Copies · 2
Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.
© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-3428; AD 2026-13-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2022-0876, the docket of a proposed AD (Federal Register 2022-20442, 2024-05913). Not covered by OpenAirDocs’ CC0 dedication.
- Manufacturer
- Boeing
- Type
- Special Attention Requirements Bulletin
- Number
- B787-81205-SB250253-00 RB
- Latest revision known
- B787-81205-SB250253-00 RB, Issue 002, dated July 11, 2024
- Copies
- 2 files of 2 revisions
A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 2 proposed ADs.
Text · 36
Revision 002, the newest copy. From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-3428; AD 2026-13-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '9fdef97ea993d78f0570ac322d3616b51a330ac43c5e8d7a206dc301c921a9ed' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '9fdef97ea993d78f0570ac322d3616b51a330ac43c5e8d7a206dc301c921a9ed' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SPECIAL ATTENTION Requirements Bulletin B787-81205-SB250253-00 RB EQUIPMENT AND FURNISHINGS - Passenger Compartment Panel and Lining - Doorway Assist Handle Inspection and Support Bracket Retainer Installation Copyright © 2024 The Boeing Company Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991 B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 1 of 36 Export Controlled ECCN: 9E991 See page 1 for details
4.0 B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Table of Contents Page
Revision Transmittal Information3
A. EFFECTIVITY5
1. Airplanes5
2. Spares Affected7
B. CONCURRENT REQUIREMENTS7
C. COMPLIANCE8
D. APPROVAL10
E. ACCOMPLISHMENT INSTRUCTIONS11
1. General Information11
2. Work Instructions12
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 2 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Requirements Bulletin B787-81205-SB250253-00 RB EQUIPMENT AND FURNISHINGS - Passenger Compartment Panel and Lining - Doorway Assist Handle Inspection and Support Bracket Retainer Installation Revision Transmittal Information
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
Special Attention:
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND
THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
This revision includes all pages of the requirements bulletin.
1. COMPLIANCE INFORMATION RELATED TO THIS REVISION The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin B787-81205-SB250253-00 RB Issue 002. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin B787-81205-SB250253-00 RB Issue 002 mandatory.
Airplanes 874, 888, 894, 900-901, 904, 906-907, 909 were added to Group 2 of this service bulletin effectivity.
Effects of this revision on Airplanes on which Issue 001 was previously done:
None.
2. REASON FOR REVISION This issue is sent to add airplanes to the effectivity of this service bulletin and to update the Supplier Service Bulletin information to the current revision.
These sections were changed:
1. In Effectivity, added airplanes, Updated change notice reference and group description table.
2. In Concurrent Requirements, Updated supplier service bulletin revision.
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 3 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
3. In Accomplishment Instructions, Section 1. General Information, Added definition of detailed inspection.
4. In Accomplishment Instructions, Section 2. Work Instructions, Updated Table 1 through Table 16 Actions, and Method of Compliance. Added "PART 3: CLOSE ACCESS" in Table 1, for Condition 1. Changed "PART 6: CLOSE ACCESS" to "PART 3: CLOSE ACCESS" in Table 8.
5. In Accomplishment Instructions, Section 2. Work Instructions, Updated supplier service bulletin revision information in "Method of Compliance" column in Table 1 through Table 16. Changed "ACTION 3 (OPTION
2)" to "ACTION 3 (OPTION 1)" in Table 9, for Condition 2. Changed "ACTION 2 (OPTION 2)" to "ACTION 2 (OPTION 1)", in Table 12.
The data given in Information Notice 787-81205-SB250253-00 IN 01 is included in this issue.
3. REVISION HISTORY Table 1 Service BulletinService BulletinRequirement BulletinRequirement Bulletin 787-25-0253787-25-0253787-25-0253 RB787-25-0253 RB Issue DateIssue Date June 18, 2021Issue 1:June 18, 2021Issue 1:
July 11, 2024Issue 2:July 11, 2024Issue 2:
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 4 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
Special Attention:
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND
THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes This bulletin is applicable to 787-8, 787-9 Airplane(s), line number(s) 6-527, 529-547, 549-564, 566-621, 623-655, 657-671, 673-685, 687, 689-696, 698-708, 710-730, 732-742, 744-753, 755- 762, 764-769, 771-776, 778-781, 783-788, 790-794, 796-799, 801-808, 810-813, 815, 817-821, 823-827, 829-833, 835-837, 839-841, 843-847, 849-851, 853-855, 857-861, 863-865, 867-871, 873-879, 881, 883-885, 888-889, 892, 894-895, 897, 899-901, 903-904, 906-907, 909 in 2 Group(s).
Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group information for the applicable airplanes is given below.
Table 1
DESCRIPTIONCONFIGURATIONGROUP 787-8 and 787-9 Airplanes line numbers 6-607, 609-618 and 621 affected by Boeing Service Bulletin B787-81205-SB250176-00, Issue
001.
-1 Airplanes that have not incorporated Boeing Service Bulletin B787- 81205-SB250176-00, Issue 001.
1 Airplanes that have incorporated Boeing Service Bulletin B787-81205- SB250176-00, Issue 001.
2 787-8 and 787-9 Airplanes not affected by Boeing Service Bulletin B787-81205-SB250176-00, Issue 001.
-2 Airplane Models: 787-8, 787-9 Table 2 GroupVariable Number 1ZA006 1ZA100 - ZA105 1ZA116 - ZA124 1ZA135 - ZA144 GroupVariable Number 1ZA152 - ZA156 1ZA175 - ZA189 1ZA195 - ZA204 1ZA215 - ZA225 GroupVariable Number 1ZA230 - ZA256 1ZA260 - ZA277 1ZA285 - ZA296 1ZA317 - ZA324 B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 5 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
GroupVariable Number 1ZA327 1ZA334 - ZA335 1ZA341 - ZA342 1ZA380 - ZA389 1ZA430 - ZA439 1ZA445 - ZA448 2ZA449 1ZA450 - ZA458 2ZA459 1ZA460 - ZA489 1ZA506 - ZA516 1ZA536 - ZA545 1ZA560 - ZA567 1ZA576 - ZA580 1ZA586 1ZA588 - ZA593 1ZA610 - ZA617 1ZA650 - ZA652 1ZA655 - ZA663 1ZA665 - ZA675 2ZA676 - ZA677 1ZA680 - ZA685 1ZA695 - ZA697 2ZA698 1ZA715 - ZA716 1ZA718 - ZA719 1ZA740 - ZA741 1ZA768 - ZA769 1ZA778 - ZA779 1ZA783 - ZA784 1ZA817 - ZA831 GroupVariable Number 1ZA839 1ZA841 - ZA842 1ZA846 - ZA848 1ZA853 - ZA861 2ZA862 1ZA873 - ZA874 2ZA875 - ZA876 1ZA881 - ZA888 1ZA916 - ZA920 2ZA949 - ZA950 2ZA954 - ZA958 2ZA972 1ZB001 - ZB010 2ZB011 - ZB012 1ZB021 - ZB040 2ZB041 - ZB043 1ZB047 - ZB057 2ZB058 - ZB060 1ZB077 - ZB081 1ZB097 - ZB108 2ZB109 - ZB120 1ZB127 - ZB132 2ZB133 - ZB136 1ZB167 - ZB187 2ZB188 - ZB191 1ZB197 - ZB198 1ZB217 1ZB219 2ZB220 1ZB224 - ZB229 1ZB234 - ZB242 GroupVariable Number 1ZB246 - ZB247 2ZB248 1ZB251 - ZB254 2ZB255 - ZB258 1ZB261 2ZB262 1ZB265 2ZB266 - ZB268 1ZB269 2ZB270 - ZB276 1ZB299 1ZB302 2ZB303 - ZB305 1ZB332 2ZB333 - ZB337 1ZB362 - ZB377 2ZB378 - ZB379 1ZB407 - ZB418 1ZB422 - ZB425 2ZB426 - ZB432 1ZB446 - ZB457 2ZB458 - ZB467 1ZB536 - ZB543 1ZB545 - ZB547 1ZB558 - ZB579 2ZB580 - ZB586 1ZB603 - ZB618 1ZB646 - ZB649 1ZB656 - ZB659 2ZB660 - ZB665 1ZB676 - ZB679 B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 6 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
GroupVariable Number 2ZB680 - ZB681 1ZB688 - ZB699 2ZB700 - ZB702 1ZB703 - ZB705 2ZB706 - ZB707 1ZB733 2ZB734 - ZB735 1ZB738 - ZB739 2ZB740 2ZB742 - ZB744 2ZB749 - ZB750 2ZB753 - ZB757 1ZB763 - ZB767 2ZB768 2ZB771 - ZB775 1ZB778 - ZB779 2ZB780 - ZB781 GroupVariable Number 1ZB782 - ZB791 2ZB792 - ZB805 1ZB812 - ZB815 2ZB816 - ZB821 1ZB828 - ZB829 2ZB830 - ZB841 2ZB858 - ZB863 2ZB874 - ZB876 2ZB893 - ZB902 2ZB908 - ZB918 2ZB922 2ZB924 2ZB926 - ZB927 2ZB934 - ZB937 2ZB967 - ZB969 2ZB980 - ZB984 2ZB990 - ZB991 GroupVariable Number 2ZB993 - ZB997 1ZD001 - ZD009 1ZD012 2ZE001 - ZE006 2ZE013 2ZE031 - ZE032 2ZE040 - ZE042 2ZE085 - ZE086 2ZE090 - ZE091 2ZE095 - ZE096 2ZE150 2ZE165 - ZE166 2ZE195 - ZE198 2ZE220 - ZE225 2ZE270 2ZE310 2ZE375
2. Spares Affected None.
B. CONCURRENT REQUIREMENTS Certain actions in the service bulletin specified below must be done as specified in Compliance and the Accomplishment Instructions.
Table 3 DescriptionService BulletinCompany
EQUIPMENT/FURNISHINGS - DOOR-
WAY ASSIST HANDLE CLIP REPLACE- MENT C355101-25-02, Revision 2 or Revision 4 SAFRAN CABIN INC.
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 7 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
C. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin B787-81205-SB250253-00 RB Issue 002. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin B787-81205-SB250253-00 RB Issue 002 mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
Accomplish the required actions, based on the applicable conditions in Table 5 and Table 6, in accordance with Accomplishment Instructions.
The Conditions, Actions and Compliance times shown apply to each passenger entry door independently.
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 8 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Group 1, Configuration 1:
Table 5 LEFT AND RIGHT SIDE PASSENGER ENTRY DOOR 1, 2, 3 AND 4 - DOORWAY ASSIST HANDLE
SUPPORT BRACKET - INSPECTION AND RETAINER INSTALLATION Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 60 months after the Issue 002 date of Requirements Bulletin B787-81205- SB250253-00 RB.
Do a detailed inspection of the forward and aft door assist handles for correct installation at each passenger entry door.
All Airplanes.
ACTION 1: Install a new retainer above the lower keyway on the support bracket assembly.
CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS INSTALLED CORRECTLY.
ACTION 2 (OPTION 1):
Install placard on the support bracket assembly.
ACTION 2 (OPTION 2):
Mark on the part that the change given in this bulletin has been done.
ACTION 1: Replace upper spring clip.
CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT INSTALLED CORRECTLY. ACTION 2: Install a newretainer above the lower keyway on the support bracket assembly.
ACTION 3 (OPTION 1):
Install placard on the support bracket assembly.
ACTION 3 (OPTION 2):
Mark on the part that the change given in this bulletin has been done.
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 9 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Group 1, Configuration 2; Group 2:
Table 6 LEFT AND RIGHT SIDE PASSENGER ENTRY DOOR 1, 2, 3 AND 4 - DOORWAY ASSIST HANDLE
SUPPORT BRACKET - RETAINER INSTALLATION Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 60 months after the Issue 002 date of Requirements Bulletin B787-81205- SB250253-00 RB.
ACTION 1: Install a new retainer above the lower keyway on the support bracket assemblies at each forward and aft door assist handle location.
All airplanes.
ACTION 2 (OPTION 1):
Install placard on the forward and aft support bracket assemblies.
ACTION 2 (OPTION 2):
Mark on the part that the change given in this bulletin has been done.
D. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 10 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
E. ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures. For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
5. The work instructions are divided into work packages. Each work package can be completed independently during separate maintenance visits. Task Hours and Elapsed Hours for each package are given in Planning Information - Paragraph 7., Manpower.
6. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
7. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 11 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN
8. The CONDITIONS, and ACTIONS shown apply to each door assist handle location on each passenger service door independently.
9. A Detailed Inspection (DET) is defined as: An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be necessary.
Surface cleaning and elaborate procedures may be required.
2. WORK INSTRUCTIONS A. Actions Required for Compliance
(1) Requirements Group 1, Configuration 1:
Table 1 WORK PACKAGE 1: LEFT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUPPORT
BRACKET - INSPECTION AND RETAINER INSTALLATION Refer to the listed procedures in B787-81205- SB250253-00 Issue 001 or later approved issues as an accepted procedure.
Method of ComplianceActionCondition PART 1: OPEN ACCESS.--All Airplanes.
FIGURE 1, DETAIL D OF SAFRAN SB C355101-25- 02 REVISION 2 OR REVI- SION 4.
Do a detailed inspection of the forward and aft door assist handles for correct installation.
B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM Page 12 of 36 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250253-00 RB Issue 002, 11 Jul 2024 12:00:00 AM