On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD.
Text · 17
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-2398; AD 2025-18-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '2e49e7b1d87eee4592e0d4c56f093f1094916d0ac08bc2391cbb9f68c3dd365e' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '2e49e7b1d87eee4592e0d4c56f093f1094916d0ac08bc2391cbb9f68c3dd365e' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
ALERT Alert Requirements Bulletin B787-81205-SB250277-00 RB EQUIPMENT AND FURNISHINGS - Passenger Service Unit - Oxygen Panel Assembly Oxygen Supply Tube and Initiator Cable Assembly Inspection and Routing Copyright © 2023 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991 B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 1 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
4.0 B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table of Contents Page
A. EFFECTIVITY3
1. Airplanes3
2. Spares Affected4
B. CONCURRENT REQUIREMENTS5
C. COMPLIANCE5
D. APPROVAL9
E. ACCOMPLISHMENT INSTRUCTIONS10
1. General Information10
2. Work Instructions11
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 2 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6, 11, 57-58, 62, 64, 82, 99, 101, 103, 109-110, 115-116, 120, 122-123, 127, 129, 134, 138-140, 142-144, 147, 149- 150, 155, 162-163, 175-176, 188-189, 193, 200, 207, 215, 217, 222, 225, 228-229, 231, 237, 239, 241-242, 249, 251-253, 255, 257, 261, 264, 266, 268, 271, 277-278, 286, 288, 290, 292, 294, 301- 303, 305-306, 312, 318, 320-321, 323, 325-326, 328, 330, 332-333, 336, 339-340, 344, 347, 352- 354, 359, 362, 364, 366-367, 371-372, 376, 378-380, 383-385, 387-389, 391, 393-395, 399, 405, 407, 409-411, 413, 417, 419-420, 423, 425, 427, 429-430, 433-435, 438, 440-441, 444, 446, 453- 455, 458, 460, 462, 464-467, 469-473, 476, 478-480, 483-485, 487, 491-492, 494-498, 501-504, 507, 509-510, 512-515, 517-519, 521, 523-527, 529, 533, 535-537, 539-542, 544-549, 551-555, 558-560, 562-563, 566-567, 570, 572, 574-577, 580, 582, 587, 589-590, 594, 596, 598-599, 601- 603, 605, 607, 610-612, 614-617, 621, 623-629, 631-633, 635-638, 640-641, 644, 646, 648, 650- 651, 653-655, 659, 666-671, 677, 679, 683, 685, 689-690, 696, 699, 701-702, 704-707, 711-714, 716, 718-732, 734-739, 741-743, 745-749, 751-754, 756-764, 766-767, 770-771, 774-792, 794- 795, 797, 799-803, 805-812, 814-815, 817, 819-826, 828-831, 833, 837, 841-842, 845-846, 848, 850-852, 854, 857, 859, 861, 863, 866-869, 871-872, 874-878, 880-881, 884-886, 890-892, 895, 900-903, 906-907, 909, 911-912, 915, 917-919, 921-925, 927-931, 933-937, 939-945, 947-951, 954, 958-960, 963-964, 966-967, 969-970, 972-975 in 1 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive",
e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
Table 1
DESCRIPTIONCONFIGURATIONGROUP 787-8, 787-9 and 787-10 Airplanes with affected Passenger Service Unit (PSU) oxygen panel assemblies part numbers 4572105-XXX-0D0 or 4572175-XXX-0D0 or 4572185-XXX-0D0.
-1 Airplane Models: 787-10, 787-8, 787-9 Table 2 GroupVariable Number 1ZA006 1ZA120 - ZA124 GroupVariable Number 1ZA195 - ZA204 1ZA215 - ZA225 GroupVariable Number 1ZA460 - ZA489 1ZA561 - ZA565 B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 3 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
GroupVariable Number 1ZA586 1ZA665 - ZA677 1ZA718 - ZA719 1ZA768 - ZA769 1ZA778 - ZA779 1ZA783 - ZA784 1ZA817 - ZA831 1ZA841 - ZA842 1ZA859 - ZA862 1ZA873 - ZA876 1ZA916 - ZA920 1ZA954 - ZA959 1ZA963 - ZA965 1ZA968 - ZA970 1ZA972 1ZB010 - ZB012 1ZB021 - ZB026 1ZB047 - ZB060 1ZB077 - ZB081 1ZB217 1ZB219 - ZB220 1ZB228 - ZB229 1ZB261 - ZB262 1ZB265 - ZB279 1ZB422 - ZB435 GroupVariable Number 1ZB446 - ZB467 1ZB536 - ZB543 1ZB545 - ZB547 1ZB558 - ZB586 1ZB603 - ZB610 1ZB656 - ZB665 1ZB676 - ZB681 1ZB688 - ZB707 1ZB738 - ZB740 1ZB744 - ZB745 1ZB753 - ZB754 1ZB763 - ZB768 1ZB771 - ZB775 1ZB782 - ZB805 1ZB810 - ZB821 1ZB858 - ZB863 1ZB893 - ZB902 1ZB910 - ZB918 1ZB922 1ZB924 1ZB934 - ZB943 1ZB967 - ZB970 1ZB980 - ZB986 1ZB990 - ZB991 1ZB993 - ZB997 GroupVariable Number 1ZC036 - ZC047 1ZC061 - ZC068 1ZC116 - ZC117 1ZC126 - ZC128 1ZC151 - ZC152 1ZC155 - ZC158 1ZC221 - ZC223 1ZE001 - ZE006 1ZE031 - ZE032 1ZE040 - ZE043 1ZE090 - ZE091 1ZE095 - ZE096 1ZE100 1ZE110 1ZE150 1ZE165 - ZE166 1ZE170 - ZE171 1ZE195 - ZE198 1ZE270 1ZE340 - ZE341 1ZE350 - ZE352 1ZE415 1ZE425 - ZE426 -- --
2. Spares Affected Examine your spares supply for the parts or components identified below. If any parts or components are found, refer to Work Instructions for the recommended action.
Table 3 Part Number 4572105-XXX-0D0 B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 4 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 3 Part Number 4572175-XXX-0D0 4572185-XXX-0D0 B. CONCURRENT REQUIREMENTS Certain actions in the service bulletin specified below must be done as specified in Compliance and Accomplishment Instructions.
Table 4 DescriptionService BulletinCompany P/N 4572105-XXX-0D0 TUBING CON-
DITION CHECK AND REROUTING 4572105-25-001, Revision 1Collins Aerospace P/N 4572175-XXX-0D0 TUBING CON-
DITION CHECK AND REROUTING 4572175-25-001, Revision 1Collins Aerospace P/N 4572185-XXX-0D0 TUBING CON-
DITION CHECK AND REROUTING 4572185-25-001, Revision 1Collins Aerospace C. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin B787-81205-SB250277-00 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin B787-81205-SB250277-00 RB mandatory.
Accomplish the required action, based on the applicable condition in Table 6 in accordance with the Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 5 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 6 Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 24 months after date of issuance of original standard certificate of airworthiness or original export certificate of airworthiness.
Within 24 months after the Issue 001 date of the Requirements Bulletin B787- 81205-SB250277-00 RB.
Do an inspection or a maintenance records check of all Passenger Service Unit (PSU) oxygen panel assemblies installed on center stowage bins for the affected part numbers 4572105-XXX- 0D0 or 4572175- XXX-0D0 or 4572185-XXX-0D0.
All Airplanes ---No further action required.
CONDITION 1: NO
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY PART NUMBER FOUND.
--Before further flight.Do an inspection of the affected PSU oxygen panel assembly ID label to find the Date of Manufacture (DMF).
CONDITION 2: ANY
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY PART NUMBER FOUND.
---No further action required.
CONDITION 2.1:
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY ID LA- BEL DMF IS 062020 OR LATER.
--Before further flight.Do an inspection to find the supplier SB modification label adjacent to the PSU oxygen panel assembly ID label.
CONDITION 2.2:
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY ID LA-
BEL DMF IS BE- FORE 062020 OR NOT IDENTIFIED.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 6 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 6 Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition ---No further action required.
CONDITION 2.2.1:
SUPPLIER SB
MODIFICATION LA-
BEL IS FOUND AND
MARKED WITH
SUPPLIER SB NUMBER 4572105- 25-001 OR 4572175- 25-001 OR 4572185-
25-001.
--Before further flight.Do a general visual inspection of the PSU oxygen panel assembly for correct oxygen supply tube and initiator cable assembly installation.
CONDITION 2.2.2:
SUPPLIER SB
MODIFICATION LA-
BEL IS FOUND AND
NOT MARKED WITH
SUPPLIER SB NUMBER 4572105- 25-001 OR 4572175- 25-001 OR 4572185- 25-001 or NO SUP-
PLIER SB MODIFI-
CATION LABEL IS FOUND.
--Before further flight.Apply the supplier SB modification label and part mark the supplier SB number and date. *[1] CONDITION 2.2.2.1:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY INSTALLED CORRECTLY.
--Before further flight.Do a general visual inspection of the oxygen supply tube for contamination, corrosion, and damage. *[2] CONDITION 2.2.2.2:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY NOT IN-
STALLED COR- RECTLY.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 7 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 6 Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition --Before further flight.ACTION 1: Reroute oxygen supply tube and initiator cable assembly. *[3]
CONDITION
2.2.2.2.1: NO CON-
TAMINATION AND
NO CORROSION
AND NO DAMAGE
FOUND ON THE
OXYGEN SUPPLY TUBE.
ACTION 2: Apply the supplier SB modification label and part mark the supplier SB number and date. *[1] --Before further flight.ACTION 1: Replace and route oxygen supply tube and reroute initiator cable assembly correctly.
*[3]
CONDITION
2.2.2.2.2: ANY CON-
TAMINATION OR
ANY CORROSION
OR ANY DAMAGE
FOUND ON THE
OXYGEN SUPPLY TUBE. ACTION 2: Apply the supplier SB modification label and part mark the supplier SB number and date. *[1] --Before further flight.Do a general visual inspection of the PSU oxygen panel assembly for correct oxygen supply tube and initiator cable assembly installation.
CONDITION 3: PSU
OXYGEN PANEL
ASSEMBLY PART
NUMBER CANNOT BE DETERMINED.
--Before further flight.Apply the supplier SB modification label and part mark the supplier SB number and date. *[1] CONDITION 3.1:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY INSTALLED CORRECTLY.
--Before further flight.Do a general visual inspection of the oxygen supply tube for contamination, corrosion, and damage. *[2] CONDITION 3.2:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY NOT IN-
STALLED COR- RECTLY.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 8 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 6 Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition --Before further flight.ACTION 1: Reroute oxygen supply tube and initiator cable assembly. *[3] CONDITION 3.2.1:
NO CONTAMINA-
TION AND NO COR-
ROSION AND NO
DAMAGE FOUND
ON THE OXYGEN SUPPLY TUBE.
ACTION 2: Apply the supplier SB modification label and part mark the supplier SB number and date. *[1] --Before further flight.ACTION 1: Replace and route oxygen supply tube and reroute initiator cable assembly correctly.
*[3] CONDITION 3.2.2:
ANY CONTAMINA-
TION OR ANY COR-
ROSION OR ANY
DAMAGE FOUND
ON THE OXYGEN SUPPLY TUBE.
ACTION 2: Apply the supplier SB modification label and part mark the supplier SB number and date. *[1] *[1] Apply next to any existing modification label.
*[2] Oxygen supply tube damage is defined as a supply tube with any cracks, nicks, deterioration or deformation.
*[3] Where the Collins service bulletins refer to item 7 and Figures 2 and 3, item 7 can be found in Figure 4 of the Collins service bulletins.
D. APPROVAL This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved for all airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 9 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
E. ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures. For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS in Compliance.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51 – Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 10 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable installation step.
6. Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51.
7. If the length of any fastener specified in this service bulletin does not meet the installation standards in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this service bulletin.
8. A General Visual Inspection is defined as: A visual examination of an interior or exterior area, installation or assembly to detect obvious damage, failure or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normal available lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may require removal or opening of access panels or doors. Stands, ladders or platforms may be required to gain proximity to the area being checked.
9. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
10. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
12. The CONDITIONS, ACTIONS and OPTIONS shown apply to each affected Passenger Service Unit (PSU) oxygen panel assembly independently.
13. The "XXX" in the affected Passenger Service Unit (PSU) oxygen panel assembly part numbers is any combination of numerals.
2. WORK INSTRUCTIONS A. Actions Required for Compliance
(1) Requirements B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 11 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 1 Refer to the listed procedures in SB B787-81205- SB2500277-00 Issue 001 or later approved issues as an accepted procedure Method of ComplianceActionCondition PART 1: OPEN ACCESS--All Airplanes -FOR THE INSPECTION:
PARAGRAPH 3.B.(1) STEP (a) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE- MENTS.
Do an inspection or a maintenance records check of all Passenger Service Unit (PSU) oxygen panel assemblies installed on center stowage bins for the affected part numbers 4572105-XXX-0D0 or 4572175-XXX-0D0 or 4572185-XXX-0D0.
--No further action required.CONDITION 1: NO AF-
FECTED PSU OXYGEN
PANEL ASSEMBLY PART NUMBER FOUND.
PART 4: CLOSE ACCESS-- -PARAGRAPH 3.B.(1) STEP (a) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE- MENTS.
Do an inspection of the affected PSU oxygen panel assembly ID label to find the Date of Manufacture (DMF).
CONDITION 2: ANY AF-
FECTED PSU OXYGEN
PANEL ASSEMBLY PART NUMBER FOUND.
--No further action required.CONDITION 2.1: AFFECT-
ED PSU OXYGEN PANEL
ASSEMBLY ID LABEL DMF IS 062020 OR LAT- ER.
PART 4: CLOSE ACCESS-- -PARAGRAPH 3.B.(1) STEP (c) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE- MENTS.
Do an inspection to find the supplier SB modification label adjacent to the PSU oxygen panel assembly ID label.
CONDITION 2.2: AFFECT-
ED PSU OXYGEN PANEL
ASSEMBLY ID LABEL DMF IS BEFORE 062020 OR NOT IDENTIFIED.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM Page 12 of 17 EXPORT CONTROLLED ECCN: 9E991 See page 1 for details.
B787-81205-SB250277-00 RB Issue 001, 15 Feb 2023 12:00:00 AM