On this page

Copies · 2

Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

Revision 002B787-81205-SB250290-00 RB Issue 002 · 19 pages · 613 KB

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1103; AD 2026-02-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2025-1103 (document 0003) · AD 2026-02-10

Revision 001787-25A0290-00 RB · 16 pages · 573 KB

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-0657; AD 2024-01-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2023-0657 (document 0003) · AD 2024-01-01

Manufacturer
Boeing
Type
Alert Requirements Bulletin
Number
B787-81205-SB250290-00 RB
Latest revision known
B787-81205-SB250290-00 RB, Issue 002, dated January 31, 2025

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

ADs that cite it · 2

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 2 proposed ADs.

Text · 19Partly OCR

Revision 002, the newest copy. Some pages are OCR from a scan. OCR can misread letters and numbers. © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1103; AD 2026-02-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '518abc45e5f3588be0feaf0132349b2c19d0ff70fe65d8b84d86eede762a94d1'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

ALERT Alert Requirements Bulletin B787-81205-SB250290-00 RB EQUIPMENT AND FURNISHING - Lavatory - Lavatory Units Faucet Control Module Inspection Copyright © 2025 The Boeing Company Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

EXPORT CONTROLLED This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.

ECCN: 9E991 B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 1 of 19 Export Controlled ECCN: 9E991 See page 1 for details

2.0 B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

Table of Contents Page

Revision Transmittal Information3

A. EFFECTIVITY5

1. Airplanes5

2. Spares Affected7

B. CONCURRENT REQUIREMENTS7

C. COMPLIANCE7

D. APPROVAL10

E. ACCOMPLISHMENT INSTRUCTIONS12

1. General Information12

2. Work Instructions13

TASK 1 – LAVATORY UNIT FAUCET CONTROL MODULE (FCM) - INSPECTION [Group 1]18

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 2 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

Alert Requirements Bulletin B787-81205-SB250290-00 RB EQUIPMENT AND FURNISHING - Lavatory - Lavatory Units Faucet Control Module Inspection Revision Transmittal Information

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:

THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE

BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

This revision includes all pages of the requirements bulletin.

1. COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Airworthiness Directive AD 2024-01-01 is related to Requirements Bulletin B787-81205-SB250290-00 RB. The effective date of AD 2024-01-01 is March 07, 2024.

Airplane line numbers 688, 955, 971, 983, 990, 997-998, 1000, 1009-1011, 1014-1015, 1020, 1023, 1027- 1028, 1033-1037, 1039, 1042-1043, 1046, 1049-1053, 1063-1070, 1073, 1076-1081, 1083-1084, 1086, 1088-1090, 1092-1093, 1096-1097, 1100-1102, 1104-1108, 1110-1111, 1115-1116, 1119-1120, 1123-1124, 1127, 1135, 1146, 1149-1150, 1152-1160, 1162-1166, 1168-9996 were removed from the effectivity of this bulletin effectivity.

Effects of this revision on Airplanes on which Issue 001 was previously done:

None.

2. REASON FOR REVISION This issue is sent to remove airplanes delivered with the new Faucet Control Module (FCM) installed in all affected lavatory units.

These sections were changed:

1. In Planning Information - Paragraph 1., Effectivity, updated effectivity to remove airplanes.

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 3 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

2. In Planning Information - Paragraph 5., Compliance, added AD reference and compliance table footnotes.

3. In Accomplishment Instructions - Step 1., General Information, updated Note 1 and added Note 13 as Requirements Bulletin content.

4. In Accomplishment Instructions - Step 2., Work Instructions, added Requirements table footnotes.

Change marks are added, except in EFFECTIVITY, and format changes, to show the location of all content changes.

3. REVISION HISTORY Table 1 Service BulletinService BulletinRequirement BulletinRequirement Bulletin 787-25A0290787-25A0290787-25A0290 RB787-25A0290 RB Issue DateIssue Date November 01, 2022Issue 1:November 01, 2022Issue 1:

January 31, 2025Issue 2:January 31, 2025Issue 2:

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 4 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:

THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE

BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

A. EFFECTIVITY

1. Airplanes This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6-687, 689-954, 956- 970, 972-982, 984-989, 991-996, 999, 1001-1008, 1012-1013, 1016-1019, 1021-1022, 1024-1026, 1029-1032, 1038, 1040-1041, 1044-1045, 1047-1048, 1054-1062, 1071-1072, 1074-1075, 1082, 1085, 1087, 1091, 1094-1095, 1098-1099, 1103, 1109, 1112-1114, 1117-1118, 1121-1122, 1125- 1126, 1128-1134, 1136-1145, 1147-1148, 1151, 1161, 1167 in 1 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.

The Variable Numbers and Group information for the applicable airplanes is given below.

Table 1

DESCRIPTIONCONFIGURATIONGROUP 787-8, -9, and -10 Airplanes with affected FCMs-1 Airplane Models: 787-10, 787-8, 787-9 Table 2 GroupVariable Number 1ZA006 1ZA100 - ZA105 1ZA116 - ZA124 1ZA135 - ZA144 1ZA152 - ZA156 1ZA175 - ZA189 1ZA195 - ZA204 1ZA215 - ZA225 1ZA230 - ZA256 GroupVariable Number 1ZA260 - ZA277 1ZA285 - ZA296 1ZA317 - ZA324 1ZA327 1ZA334 - ZA335 1ZA341 - ZA342 1ZA380 - ZA389 1ZA430 - ZA439 1ZA445 - ZA489 GroupVariable Number 1ZA506 - ZA516 1ZA536 - ZA545 1ZA560 - ZA567 1ZA576 - ZA580 1ZA586 1ZA588 - ZA593 1ZA610 - ZA617 1ZA650 - ZA652 1ZA655 - ZA663 B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 5 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

GroupVariable Number 1ZA665 - ZA677 1ZA680 - ZA685 1ZA695 - ZA698 1ZA715 - ZA716 1ZA718 - ZA719 1ZA740 - ZA741 1ZA768 - ZA769 1ZA778 - ZA779 1ZA783 - ZA784 1ZA817 - ZA831 1ZA839 1ZA841 - ZA842 1ZA846 - ZA848 1ZA853 - ZA862 1ZA873 - ZA876 1ZA881 - ZA888 1ZA916 - ZA920 1ZA949 - ZA950 1ZA954 - ZA959 1ZA963 - ZA966 1ZA968 - ZA972 1ZA990 1ZB001 - ZB012 1ZB021 - ZB043 1ZB047 - ZB060 1ZB077 - ZB081 1ZB097 - ZB121 1ZB127 - ZB136 1ZB167 - ZB191 1ZB197 - ZB198 1ZB217 GroupVariable Number 1ZB219 - ZB220 1ZB224 - ZB229 1ZB234 - ZB242 1ZB246 - ZB248 1ZB251 - ZB258 1ZB261 - ZB262 1ZB265 - ZB280 1ZB299 1ZB302 - ZB305 1ZB332 - ZB338 1ZB362 - ZB379 1ZB407 - ZB435 1ZB446 - ZB467 1ZB536 - ZB543 1ZB545 - ZB547 1ZB558 - ZB587 1ZB603 - ZB618 1ZB646 - ZB649 1ZB656 - ZB665 1ZB676 - ZB681 1ZB688 - ZB707 1ZB733 - ZB735 1ZB738 - ZB740 1ZB742 - ZB745 1ZB749 - ZB750 1ZB753 - ZB757 1ZB763 - ZB768 1ZB771 - ZB775 1ZB778 - ZB821 1ZB828 - ZB841 1ZB858 - ZB863 GroupVariable Number 1ZB874 - ZB876 1ZB887 1ZB890 1ZB893 - ZB902 1ZB908 - ZB918 1ZB922 1ZB924 1ZB926 - ZB927 1ZB934 - ZB946 1ZB951 1ZB967 - ZB971 1ZB977 - ZB978 1ZB980 - ZB986 1ZB990 - ZB991 1ZB993 - ZB997 1ZC001 - ZC015 1ZC019 - ZC020 1ZC036 - ZC056 1ZC061 - ZC069 1ZC101 - ZC107 1ZC116 - ZC118 1ZC126 - ZC129 1ZC151 - ZC152 1ZC155 - ZC158 1ZC165 1ZC211 - ZC219 1ZC221 - ZC225 1ZC239 - ZC240 1ZD001 - ZD009 1ZD012 - ZD024 1ZD027 - ZD028 B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 6 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

GroupVariable Number 1ZD048 1ZE001 - ZE006 1ZE008 1ZE013 1ZE016 - ZE017 1ZE031 - ZE032 1ZE040 - ZE045 1ZE048 1ZE085 - ZE086 1ZE090 - ZE091 1ZE095 - ZE096 1ZE100 GroupVariable Number 1ZE105 - ZE106 1ZE110 - ZE112 1ZE115 1ZE150 1ZE165 - ZE166 1ZE170 - ZE171 1ZE195 - ZE198 1ZE220 - ZE241 1ZE270 1ZE273 1ZE310 - ZE311 1ZE340 - ZE341 GroupVariable Number 1ZE350 - ZE362 1ZE375 1ZE380 - ZE381 1ZE415 - ZE416 1ZE420 1ZE425 - ZE426 1ZE435 - ZE437 1ZE455 - ZE456 1ZE481 1ZE486 - ZE488 1ZE581 --

2. Spares Affected None.

B. CONCURRENT REQUIREMENTS None.

C. COMPLIANCE Federal Aviation Administration (FAA) Airworthiness Directive AD 2024-01-01 is related to Requirements Bulletin B787-81205-SB250290-00 RB. The effective date of AD 2024-01-01 is March 07, 2024.

Do the required actions, based on the applicable condition(s) in Table 4, in accordance with Accomplishment Instructions.

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.

The Conditions, Actions and Compliance times shown apply to each faucet control module independently.

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 7 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

Table 4 LAVATORY UNIT FAUCET CONTROL MODULE (FCM) - INSPECTION Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition -Within 12 months after the Issue 001 date of the Requirements Bulletin B787-81205- SB250290-00 RB Do a general visual inspection of the area under all lavatory washbasins for evidence of intermittent and active leaks at the Faucet Control Module (FCM). *[1] All Airplanes or Within 12 months after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, whichever occurs later.

1000 Flight Hours-Repeat the general visual inspection of the area under all lavatory washbasins for evidence of intermittent and active leaks at the FCM.

*[1]*[2]*[3] CONDITION 1: NO

EVIDENCE OF IN-

TERMITTENT AND

NO ACTIVE LEAK FOUND.

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 8 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

Table 4 LAVATORY UNIT FAUCET CONTROL MODULE (FCM) - INSPECTION Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition -Before further flightCONDITION 2 (OP- TION 1: ACTION 1):

Deactivate water supply to the affected FCM.

CONDITION 2: ANY

EVIDENCE OF IN-

TERMITTENT LEAK

OR ANY ACTIVE

LEAK FOUND AT ANY FCM. -Before further flight after activation of affected water supply CONDITION 2 (OP- TION 1: ACTION 2):

Replace affected FCM with new or serviceable FCM. *[4] -Before further flight after activation of affected water supply CONDITION 2 (OP- TION 1: ACTION 3):

At affected lavatory washbasin(s), do a leak test. If a leak is found, do applicable corrective action.

Repeat the leak test and make sure no leak is found.

1000 Flight Hours-CONDITION 2 (OP- TION 1: ACTION 4):

Repeat the general visual inspection of the area under all lavatory washbasins for evidence of intermittent and active leaks at the FCM.

*[1]*[3]*[2] -Before further flightCONDITION 2 (OP- TION 2: ACTION 1):

Replace affected FCM with new or serviceable FCM. *[4] -Before further flight B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 9 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

Table 4 LAVATORY UNIT FAUCET CONTROL MODULE (FCM) - INSPECTION Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time ActionCondition CONDITION 2 (OP- TION 2: ACTION 2):

At all affected lavatory washbasin(s), do a leak test. If a leak is found, do applicable corrective action.

Repeat the leak test and make sure no leak is found.

1000 Flight Hours-CONDITION 2 (OP- TION 2: ACTION 3):

Repeat the general visual inspection of the area under all lavatory washbasins for evidence of intermittent and active leaks at the FCM.

*[1]*[3]*[2] *[1] Evidence of an intermittent or active leak can include a water stain or puddle of water.

*[2] The replacement of the FCM P/N AFUT000200A0001 or AFUT000200A0002 with FCM P/N AFUT000200A0004 is the terminating action for the repeat inspections in B787-81205-SB250290-00 RB, at any lavatory location.

*[3] It is acceptable to do this repetitive task in accordance with Boeing 787 Maintenance Planning Document D011Z009-03, Appendix L

- Items with Multiple Service Limit Intervals Maintenance Review Board Report (MRBR) item number 38-025-00 Task - Inspect (General Visual) the Lavatory Faucet Control Module (FCM) for degradation and leakage when pressurized, dated November 30, 2023, or later approved at the Service Limit Interval specified for the applicable FCM Part Number Series.

*[4] A serviceable FCM is a FCM that conforms to type design and is in condition for safe operation. Normal wear and tear is permissible as long as damage limits aren't exceeded. Refer to Component Maintenance Manual (CMM) 38-11-08 as an accepted FCM overhaul procedure.

D. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 10 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

In addition, the Manager of the FAA Continued Operational Safety Branch approves accomplishment of the actions defined in Requirements Bulletin B787-81205-SB250290-00 RB Issue 002 as an alternative method of compliance to the requirements of paragraph (g) of AD 2024-01-01.

All provisions of AD 2024-01-01 that are not specifically referenced in the above statement remain fully applicable and must be complied with.

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 11 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN

E. ACCOMPLISHMENT INSTRUCTIONS

1. GENERAL INFORMATION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the Work Instructions is for reference only. The procedures in that column are not required by the AD and are for guidance only. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures. For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC; this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. Figures not required for compliance are omitted from the RB.

2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.

3. These work instructions refer to procedures included in other Boeing documents. When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.

4. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.

5. A General Visual Inspection is defined as: A visual examination of an interior or exterior area, installation or assembly to detect obvious damage, failure or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normal available lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may require removal or opening of access panels or doors. Stands, ladders or platforms may be required to gain proximity to the area being checked.

6. Evidence of an intermittent or active leak can include a water stain or puddle of water.

B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM Page 12 of 19 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250290-00 RB Issue 002, 31 Jan 2025 12:00:00 AM

REQUIREMENTS BULLETIN