On this page
Copies · 2
Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.
© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-1884, the docket of a proposed AD (Federal Register 2024-15235, 2025-02069). Not covered by OpenAirDocs’ CC0 dedication.
© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1114; AD 2026-09-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Manufacturer
- Boeing
- Type
- Alert Requirements Bulletin
- Number
- B787-81205-SB250299-00 RB
- Latest revision known
- B787-81205-SB250299-00 RB, Issue 002, dated February 28, 2025
- Copies
- 2 files of 2 revisions
A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 2 proposed ADs.
Text · 37Partly OCR
Revision 001, the newest copy. Some pages are OCR from a scan. OCR can misread letters and numbers. © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-1884, the docket of a proposed AD (Federal Register 2024-15235, 2025-02069). Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'ef44cf6dd1c8b2dc2f2cb115ae23b1d226d98f756f57e6a0a343f7300751dcba' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'ef44cf6dd1c8b2dc2f2cb115ae23b1d226d98f756f57e6a0a343f7300751dcba' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
ALERT Alert Requirements Bulletin B787-81205-SB250299-00 RB EQUIPMENT AND FURNISHINGS - General - Lavatory and Galley Clamshell Coupling Safety Strap Inspection Copyright © 2023 The Boeing Company Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991 B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 1 of 37 Export Controlled ECCN: 9E991 See page 1 for details
5.0 B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table of Contents Page
A. EFFECTIVITY3
1. Airplanes3
2. Spares Affected4
B. CONCURRENT REQUIREMENTS4
C. COMPLIANCE4
D. APPROVAL5
E. ACCOMPLISHMENT INSTRUCTIONS7
1. General Information7
2. Work Instructions8
TASK 1 – POTABLE WATER SYSTEM CLAMSHELL COUPLING DETAILED INSPECTION [Group 1] . 11 TASK 2 – POTABLE WATER SYSTEM CLAMSHELL COUPLING CORRECT INSTALLATION [Group 1] . 15
TASK 3 – POTABLE WATER SYSTEM CLAMSHELL COUPLING INSTALLATION [Group 1]19
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 2 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes This bulletin is applicable to 787-8, 787-9 Airplane(s), line number(s) 6-292, 294, 347, 367, 460, 476, 513, 535, 660, 1057, 1059 in 1 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
Table 1
DESCRIPTIONCONFIGURATIONGROUP 787-8 and 787-9 airplanes.-1 Airplane Models: 787-8, 787-9 Table 2 GroupVariable Number 1ZA006 1ZA100 - ZA105 1ZA116 - ZA124 1ZA135 - ZA140 1ZA152 - ZA153 1ZA175 - ZA189 1ZA195 - ZA199 1ZA215 - ZA223 1ZA230 - ZA249 1ZA260 - ZA275 1ZA285 - ZA296 1ZA317 - ZA324 1ZA327 GroupVariable Number 1ZA334 - ZA335 1ZA341 1ZA380 - ZA389 1ZA430 - ZA439 1ZA445 - ZA457 1ZA460 - ZA481 1ZA506 - ZA516 1ZA536 - ZA545 1ZA560 - ZA567 1ZA576 - ZA580 1ZA586 1ZA588 - ZA592 1ZA610 - ZA617 GroupVariable Number 1ZA650 - ZA652 1ZA655 - ZA661 1ZA665 - ZA675 1ZA680 - ZA683 1ZA695 1ZA715 - ZA716 1ZA740 - ZA741 1ZA778 - ZA779 1ZA783 - ZA784 1ZA817 - ZA822 1ZA841 1ZA846 - ZA847 1ZB001 - ZB005 B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 3 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
GroupVariable Number 1ZB021 1ZB027 - ZB030 1ZB077 - ZB079 1ZB127 - ZB129 GroupVariable Number 1ZB167 - ZB171 1ZB197 - ZB198 1ZB224 - ZB225 1ZB407 GroupVariable Number 1ZD001 - ZD009 1ZD012 1ZE455 - ZE456 --
2. Spares Affected None.
B. CONCURRENT REQUIREMENTS None.
C. COMPLIANCE Federal Aviation Administration (FAA) Airworthiness Directive AD 2023-08-04 is related to Requirements Bulletin B787-81205-SB250299-00 RB. The effective date of AD 2023-08-04 is June 29, 2023.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin B787-81205-SB250299-00 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin B787-81205-SB250299-00 RB mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
Accomplish the required action, based on the applicable condition in Table 4 in accordance with the Accomplishment Instructions.
Table 4 Lavatory and Galley Clamshell Coupling Safety Strap Inspection Compliance TimeActionCondition Within 36 months after the Issue 001 date of Requirements Bulletin B787- 81205-SB250299-00 RB Do a detailed inspection of all clamshell couplings at Door 1 and Door 3 lavatories and galleys with potable water system for a safety strap and that clamshell coupling with a safety strap is correctly installed. *[1]*[2]
ALL AIRPLANES -No further action necessary.*[3]CONDITION 1: CLAMSHELL COU-
PLING WITH SAFETY STRAP
FOUND AND CORRECTLY IN- STALLED.
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 4 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 4 Lavatory and Galley Clamshell Coupling Safety Strap Inspection Compliance TimeActionCondition Before further flight.ACTION 1: At all affected location(s), correctly install clamshell coupling with safety strap.*[4] CONDITION 2: ANY INCORRECT-
LY INSTALLED LAVATORY AND
GALLEY CLAMSHELL COUPLING WITH SAFETY STRAP FOUND.
ACTION 2: At all affected location(s), do a leak test. If a leak is found, do applicable corrective action. Repeat the leak test and make sure no leak is found.*[4] Before further flight.ACTION 1: At all affected location(s), replace with clamshell coupling with safety strap.*[4] CONDITION 3: ANY LAVATORY
AND GALLEY CLAMSHELL COU-
PLING WITHOUT SAFETY STRAP FOUND.
ACTION 2: At all affected location(s), do a leak test. If a leak is found, do applicable corrective action. Repeat the leak test and make sure no leak is found.*[4] *[1] Not all airplanes have lavatories and/or galleys with potable water systems installed at Door 3.
*[2] A clamshell coupling installation is correct if all of the following conditions apply: The clamshell coupling body is installed over the tube/hose ferrules; the hose fitting O-ring is not visible; the clamshell coupling body is completely closed over the male hose and female receptacle fittings; the clamshell coupling latch pawls (3 each) fully engage the coupling latch pins; the safety strap is fully engaged over the ball located on the center latch pawl; the installed clamshell coupling assembly rotates 360 degrees with no binding during full rotation.
*[3] The detail inspection requirement specified by Boeing Alert Requirements Bulletin B787-81205-SB380021-00 RB at that location is terminated.
*[4] Correctly installing a clamshell coupling with a safety strap and making sure no leak is found, terminates the detail inspection requirement specified by Boeing Alert Requirements Bulletin B787-81205-SB380021-00 RB at that location.
D. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 5 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
In addition, the Manager of the FAA Continued Operational Safety Branch approves accomplishment of the actions (i.e. inspection or modification) defined in Requirements Bulletin B787-81205-SB250299-00 RB as an alternative method of compliance to the accomplishment of actions in Requirements Bulletin B787-81205-SB380021-00 RB as required by paragraph (g) of AD 2023-08-04. Actions required by paragraph
(g) of AD 2023-08-04 must be accomplished within 180 days of the effective date of AD 2023-08-04. All provisions of AD 2023-08-04 that are not specifically referenced in the above statement remain fully applicable and must be complied with.
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 6 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
E. ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures. For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
5. A Detailed Inspection is defined as: An intensive examination of a specific item, installation or assembly to detect damage, failure or irregularity. This could include tactile assessment in which a component or assembly can be checked for tightness/security. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors and magnifying lenses may be necessary. Surface cleaning and elaborate access procedures may be required.
6. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
7. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.
8. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 7 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
9. The CONDITIONS, ACTIONS and OPTIONS shown apply to each lavatory and galley independently.
10. Use of colors in Tasks is based on guidance from the S1000D International specification for technical publications.
2. WORK INSTRUCTIONS A. Actions Required for Compliance
(1) Requirements Table 1 Lavatory and Galley Clamshell Coupling Safety Strap Inspection Refer to the listed procedures in SB B787-81205- SB250299-00 Issue 001 or later approved issues as an accepted procedure Method of ComplianceActionCondition PART 1: DEPRESSURIZE
POTABLE WATER SYS- TEM --ALL AIRPLANES PART 2: OPEN ACCESS -Task 1ACTION 1: Do a detailed inspection of all clamshell couplings at Door 1 and Door 3 lavatories and galleys with potable water system for a safety strap and that clamshell coupling with a safety strap is correctly installed. *[1]*[2] --No further action necessary.*[3] CONDITION 1: SAFETY
STRAP FOUND ON ALL
CLAMSHELL COU-
PLINGS AND CORRECT- LY INSTALLED.
PART 3: PRESSURIZE
POTABLE WATER SYS- TEM -- PART 5: CLOSE ACCESS-- B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 8 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Table 1 Lavatory and Galley Clamshell Coupling Safety Strap Inspection Refer to the listed procedures in SB B787-81205- SB250299-00 Issue 001 or later approved issues as an accepted procedure Method of ComplianceActionCondition -Task 2ACTION 1: At all affected location(s), correctly install clamshell coupling with safety strap.*[4] CONDITION 2: ANY IN-
CORRECTLY INSTALLED
LAVATORY AND GALLEY
CLAMSHELL COUPLING
WITH SAFETY STRAP FOUND. PART 4: TEST-ACTION 2: At all affected location(s), do a leak test.
If a leak is found, do applicable corrective action.
Repeat the leak test and make sure no leak is found.*[4] PART 5: CLOSE ACCESS-- -Task 3ACTION 1: At all affected location(s), replace with clamshell coupling with safety strap.*[4] CONDITION 3: ANY
LAVATORY AND GALLEY
CLAMSHELL COUPLING
WITHOUT SAFETY STRAP FOUND.
PART 4: TEST-ACTION 2: At all affected location(s), do a leak test.
If a leak is found, do applicable corrective action.
Repeat the leak test and make sure no leak is found.*[4] PART 5: CLOSE ACCESS-- *[1] Not all airplanes have lavatories and/or galleys with potable water systems installed at Door 3.
*[2] A clamshell coupling installation is correct if all of the following conditions apply: The clamshell coupling body is installed over the tube/hose ferrules; the hose fitting O-ring is not visible; the clamshell coupling body is completely closed over the male hose and female receptacle fittings; the clamshell coupling latch pawls (3 each) fully engage the coupling latch pins; the safety strap is fully engaged over the ball located on the center latch pawl and; the installed clamshell coupling assembly rotates 360 degrees with no binding during full rotation.
*[3] The detail inspection requirement specified by Boeing Alert Requirements Bulletin B787-81205-SB380021-00 RB at that location is terminated.
*[4] Correctly installing a clamshell coupling with a safety strap and making sure no leak is found, terminates the detail inspection requirement specified by Boeing Alert Requirements Bulletin B787-81205-SB380021-00 RB at that location.
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 9 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
Task 1 – POTABLE WATER SYSTEM CLAMSHELL COUPLING DETAILED INSPECTION [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 10 of 37 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN
@ BOEING B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN Procedure This Task applies only to: Group 1.
MALE END LINE
MALE-FEMALE CONNECTION
O-RING - (TYPICAL)
FEMALE END LINE
FERRULE
• SAFETY STRAP LATCH LATCH SAFETY
STRAP LATCH BALL
1) CLAMSHELL
COUPLING
• INSPECTION AREA 3021466 ICN-B787-A-000061-A-81205-18561-A-01-1 Figure 1 B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 11 of 37 Export Controlled ECCN: 9E991 See page 1 for details
A BOEING B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM
REQUIREMENTS BULLETIN SAFETY STRAP
BALL SAFETY STRAP LATCH _ATCH PIN ~
BONDING SPRING BONDING SPRING
FERRULE FERRULE O-RING SAFETY STRAP BALL
LATCH SAFETY STRAP
•PIN
BONDING SPRING BONDING SPRING FERRULE- —FERRULE O-RING B-B _ SAFETY STRAP PARTIALLY SHOWN FOR CLARITY ICN-B787-A-000061-A-81205-18797-A-01-1 Figure 2
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY numbers shown below are the number of parts necessary for each location.
B787-81205-SB250299-00 RB Issue 001, 31 Jul 2023 12:00:00 AM Page 12 of 37 Export Controlled ECCN: 9E991 See page 1 for details