Revision 001787-53A0070-01--RB · 17 pages · 1.7 MB

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0671; AD 2019-22-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2019-0671 (document 0002) · AD 2019-22-09

Manufacturer
Boeing
Type
Alert Requirements Bulletin
Number
B787-81205-SB530070-00 RB
Latest revision known
B787-81205-SB530070-00 RB, Issue 001, dated August 31, 2018

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 17Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0671; AD 2019-22-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'ba7e8c20c9a48726531963dbb5b41cc12e62412b18166b0c312020c3ac432e24'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Alert Requirements Bulletin B787-81205-SB530070-00 RB FUSELAGE - Section 44 - Left and Right Side Main Landing Gear Aft Hanger Link Lug Fitting Inspection Copyright © 2018 Boeing. Unpublished Work. All rights reserved.

Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

EXPORT CONTROLLED Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

ECCN: 9E991 B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 1 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

3.0 B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

Table of Contents Page

A. EFFECTIVITY3

1. Airplanes3

2. Spares Affected3

B. CONCURRENT REQUIREMENTS3

C. COMPLIANCE3

D. APPROVAL5

E. ACCOMPLISHMENT INSTRUCTIONS6

1. General Information6

2. Work Instructions7

TASK 1 – LEFT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - INSPECTION [Group 1]

.11

TASK 2 – RIGHT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - INSPECTION [Group 1]

.15

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 2 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:

THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE

BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

A. EFFECTIVITY

1. Airplanes This bulletin is applicable to 787-8 Airplanes, line numbers 6-70.

2. Spares Affected None.

B. CONCURRENT REQUIREMENTS None.

C. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin B787-81205-SB530070-00 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin B787-81205-SB530070-00 RB mandatory.

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.

Accomplish the required action(s), based on the applicable condition(s) in Tables 4 and 5, in accordance with Requirement Bulletin B787-81205-SB530070-00 RB Accomplishment Instructions.

Table 4 WORK PACKAGE 1 - LEFT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - IN-

SPECTION Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Before 22,000 total flight cycles.

Do a surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

All Airplanes B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 3 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

Table 4 WORK PACKAGE 1 - LEFT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - IN-

SPECTION Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Before further flight.

ACTION 1: Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1: ANY

CRACK FOUND 12,000 flight cycles-ACTION 2: Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack on unrepaired locations.

12,000 flight cycles-Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

CONDITION 2: NO

CRACK FOUND Table 5 WORK PACKAGE 2 - RIGHT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING -

INSPECTION Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Before 22,000 total flight cycles.

Do a surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

All Airplanes -Before further flight.

ACTION 1: Contact The Boeing Company for repair instructions and do the repair.

CONDITION 3: ANY

CRACK FOUND 12,000 flight cycles-ACTION 2: Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack on unrepaired locations.

12,000 flight cycles-Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

CONDITION 4: NO

CRACK FOUND B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 4 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

D. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 5 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

E. ACCOMPLISHMENT INSTRUCTIONS

1. GENERAL INFORMATION NOTE: 5. The work instructions are divided into work packages. Each work package can be completed independently during separate maintenance visits.

6. Unless shown differently, these dimensions and tolerances are used:

– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51 – Torque Values:

– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter

51.

– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft Maintenance Manual (AMM).

– Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).

– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft Maintenance Manual (AMM).

– Non-standard torque values for maintenance tasks are included in the applicable installation step.

7. These work instructions refer to procedures included in other Boeing documents. When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.

8. Boeing Service Letter 787 SL 51-001 Damage Reporting and Repair Plan/Design Guidelines, is an acceptable procedure to request information from Boeing for additional structural repair instructions. The Service Letter describes what information must be provided to Boeing before a structural repair can be provided.

9. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.

10. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.

11. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 6 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

12. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures. For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC;

this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. Figures not required for compliance are omitted from the RB.

13. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.

2. WORK INSTRUCTIONS A. Actions Required for Compliance

(1) Requirements Table 1 WORK PACKAGE 1 - LEFT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - INSPECTION Refer to the listed procedures in SB 787-53A0070 Issue 001 or later approved issues as an accepted procedure.

Method of ComplianceActionCondition PART 1: OPEN ACCESS

LEFT SIDE -Do a surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

All Airplanes -Task 1 PART 2: CLOSE ACCESS

LEFT SIDE - B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 7 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

Table 1 WORK PACKAGE 1 - LEFT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - INSPECTION Refer to the listed procedures in SB 787-53A0070 Issue 001 or later approved issues as an accepted procedure.

Method of ComplianceActionCondition --ACTION 1: Contact The Boeing Company for repair instructions and do the repair.

CONDITION 1: ANY CRACK FOUND.

PART 1: OPEN ACCESS

LEFT SIDE -ACTION 2: Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack on unrepaired locations.

-Task 1 PART 2: CLOSE ACCESS

LEFT SIDE - PART 1: OPEN ACCESS

LEFT SIDE -Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

CONDITION 2: NO CRACK FOUND.

-Task 1 PART 2: CLOSE ACCESS

LEFT SIDE - Table 2 WORK PACKAGE 2 - RIGHT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - INSPEC- TION Refer to the listed procedures in SB 787-53A0070 Issue 001 or later approved issues as an accepted procedure.

Method of ComplianceActionCondition PART 3: OPEN ACCESS

RIGHT SIDE -Do a surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

All Airplanes -Task 2 PART 4: CLOSE ACCESS

RIGHT SIDE - B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 8 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

Table 2 WORK PACKAGE 2 - RIGHT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING - INSPEC- TION Refer to the listed procedures in SB 787-53A0070 Issue 001 or later approved issues as an accepted procedure.

Method of ComplianceActionCondition --ACTION 1: Contact The Boeing Company for repair instructions and do the repair.

CONDITION 3: ANY CRACK FOUND.

PART 3: OPEN ACCESS

RIGHT SIDE -ACTION 2: Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack on unrepaired locations.

-Task 2 PART 4: CLOSE ACCESS

RIGHT SIDE - PART 3: OPEN ACCESS

RIGHT SIDE -Repeat the surface HFEC inspection of the aft hanger link lug fitting at the lug root radius for any crack.

CONDITION 4: NO CRACK FOUND.

-Task 2 PART 4: CLOSE ACCESS

RIGHT SIDE - B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 9 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

Task 1 – LEFT SIDE MAIN LANDING GEAR AFT HANGER LINK LUG FITTING

- INSPECTION [Group 1:]

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:

THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE

BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 10 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN

Page 11OCROpen in PDF

Q BOEING B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN Procedure This Task applies only to: Group 1.

1000 0000 Д

• 0•0000 0000 D

AFT HANGER LINK LUG FITTING ICN-B787-A-000061-A-81205-15219-A-01-1 B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 11 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.

Page 12OCROpen in PDF

A BOEING B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018

REQUIREMENTS BULLETIN INSPECTION AREA 2818656 ICN-B787-A-000061-A-81205-15220-A-01-1 Figure 2

1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY numbers shown below are the number of parts necessary for this airplane.

B787-81205-SB530070-00 RB Issue 001, 31 Aug 2018 Page 12 of 17 EXPORT CONTROLLED ECCN: 9E991 See title page for details.