On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD.
Text · 31Partly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers. © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1361; AD 2026-01-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'ddeda637996c0a57fff5b09ebb59b080216f433d7b0350aaee91ad2414d5ec91' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'ddeda637996c0a57fff5b09ebb59b080216f433d7b0350aaee91ad2414d5ec91' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
ALERT Alert Requirements Bulletin B787-81205-SB530090-00 RB FUSELAGE - Section 46 - Ram Air Turbine Forward Fitting Inspection and Replacement Copyright © 2025 The Boeing Company Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991 B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 1 of 31 Export Controlled ECCN: 9E991 See page 1 for details
2.0 B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Table of Contents Page
A. EFFECTIVITY3
1. Airplanes3
2. Spares Affected4
B. CONCURRENT REQUIREMENTS4
C. COMPLIANCE4
D. APPROVAL5
E. ACCOMPLISHMENT INSTRUCTIONS6
1. General Information6
2. Work Instructions7
TASK 1 – RAM AIR TURBINE FORWARD FITTING INSPECTION [Group 1]10
TASK 2 – RAM AIR TURBINE FORWARD FITTING REMOVAL [Group 1]13
TASK 3 – RAM AIR TURBINE FORWARD FITTING OPEN HOLE INSPECTION [Group 1]17
TASK 4 – RAM AIR TURBINE FORWARD FITTING INSTALLATION [Group 1]21
Appendix A – PROCEDURE FOR X-RAY FLUORESCENCE SPECTROMETER INSPECTION [Group 1] . 27 B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 2 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes This bulletin is applicable to 787-9, 787-10 Airplane(s), line number(s) 749-755, 757-763, 765-768, 770-780, 782-820, 822 in 1 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
Table 1
DESCRIPTIONCONFIGURATIONGROUP 787-9, 787-10 Airplanes installed with Ram Air Turbine (RAT) forward fitting that is possibly commercially pure unalloyed titatium.
-1 Airplane Models: 787-10, 787-9 Table 2 GroupVariable Number 1ZB012 1ZB113 - ZB116 1ZB275 - ZB276 1ZB335 1ZB430 - ZB432 1ZB465 - ZB467 1ZB585 1ZB663 - ZB665 1ZB740 1ZB754 1ZB757 GroupVariable Number 1ZB772 - ZB773 1ZB800 - ZB804 1ZB835 - ZB837 1ZB861 - ZB863 1ZB876 1ZB896 - ZB898 1ZB908 - ZB909 1ZB922 1ZB924 1ZB935 - ZB936 1ZB967 - ZB968 GroupVariable Number 1ZB980 - ZB982 1ZB990 1ZB993 1ZB997 1ZC009 1ZC038 - ZC043 1ZC062 - ZC065 1ZC116 1ZE032 1ZE040 - ZE042 1ZE165 B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 3 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
2. Spares Affected None.
B. CONCURRENT REQUIREMENTS None.
C. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin B787-81205-SB530090-00 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin B787-81205-SB530090-00 RB mandatory.
Accomplish the required action, based on the applicable condition in Table 4 in accordance with the Accomplishment Instructions When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
Table 4 Ram Air Turbine (RAT) forward fitting at Station (STA) 1329 – Inspection and Replacement Boeing Recommended Compliance Time ActionCondition Within 36 months after the Issue 001 date of Requirements Bulletin B787- 81205-SB530090-00 RB.
Do a High Frequency Eddy Current (HFEC) or handheld XRF Spectrometer Inspection of RAT forward fitting to determine titanium alloy material.
All Airplanes -No further action required.CONDITION 1: ANY RAT FOR-
WARD FITTING FOUND THAT IS Ti-6Al-4V ALLOY MATERIAL.
Before further flight.CONDITION 2 (ACTION 1): Remove RAT forward fitting CONDITION 2: ANY RAT FOR-
WARD FITTING FOUND THAT IS NOT Ti-6Al-4V ALLOY MATERIAL
OR TITANIUM ALLOY CANNOT BE DETERMINED.
Before further flightCONDITION 2 (ACTION 2): At all fastener hole locations common to titanium parts of the interfacing structure of the affected RAT forward fitting, do an open hole HFEC inspection for any crack.
Before further flight.Replace RAT forward fitting with a new RAT forward fitting (Ti-6Al-4V alloy material).
CONDITION 2.1: NO CRACK FOUND B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 4 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Table 4 Ram Air Turbine (RAT) forward fitting at Station (STA) 1329 – Inspection and Replacement Boeing Recommended Compliance Time ActionCondition Before further flight.Contact the Boeing Company for repair instructions and new RAT Forward fitting installation instructions. Do the repair and install a new RAT Forward fitting with Ti-6Al-4V alloy material.
CONDITION 2.2: ANY CRACK FOUND D. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.
B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 5 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
E. ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATE-
RIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.CAUTION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the Work Instructions is for reference only. The procedures in that column are not required by the AD and are for guidance only. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures. For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC; this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in Work Instructions are in Compliance.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 6 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51 – Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable installation step.
6. Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51.
7. If the length of any fastener specified in this requirements bulletin does not meet the installation standards in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this requirements bulletin.
8. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
9. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
2. WORK INSTRUCTIONS A. Actions Required for Compliance
(1) Requirements:
B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 7 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Table 1 Ram Air Turbine (RAT) forward fitting at Station (STA) 1329 – Inspection and Replacement Refer to the listed procedures in SB B787-81205- SB530090-00 Issue 001 or later approved issues as an accepted procedure.
Method of ComplianceActionCondition PART 1: OPEN ACCESS
FOR INSPECTION -Do a High Frequency Eddy Current (HFEC) or handheld XRF Spectrometer Inspection of RAT forward fitting to determine titanium alloy material.
All Airplanes -TASK 1 PART 2: CLOSE ACCESS
AFTER INSPECTION -No further action required.CONDITION 1: ANY RAT
FORWARD FITTING FOUND THAT IS Ti-6Al- 4V ALLOY MATERIAL.
PART 3: OPEN ACCESS
FOR REPLACEMENT -CONDITION 2 (ACTION
1): Remove RAT forward fitting CONDITION 2: ANY RAT
FORWARD FITTING FOUND THAT IS NOT Ti- 6Al-4V ALLOY MATERIAL
OR TITANIUM ALLOY
CANNOT BE DETER- MINED -TASK 2 -TASK 3CONDITION 2 (ACTION
2): At all fastener hole locations common to titanium parts of the interfacing structure of the affected RAT Forward fitting, do an open hole inspection for any crack -TASK 4Replace RAT forward fitting with a new RAT forward fitting (Ti-6Al-4V alloy material).
CONDITION 2.1: NO CRACK FOUND PART 4: CLOSE ACCESS
AFTER REPLACEMENT - --Contact the Boeing Company for repair instructions and new RAT Forward fitting installation instructions. Do the repair and install a new RAT Forward fitting with Ti-6Al-4V alloy material.
CONDITION 2.2: ANY CRACK FOUND PART 4: CLOSE ACCESS
AFTER REPLACEMENT - B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 8 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Task 1 – RAM AIR TURBINE FORWARD FITTING INSPECTION [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 9 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Q BOEING B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN Procedure This Task applies only to: Group 1.
STA 1329 FWD ICN-B787-A-000061-A-81205-19881-A-01-1 Task 1 Figure 1 B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 10 of 31 Export Controlled ECCN: 9E991 See page 1 for details
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY numbers shown below are the number of parts necessary for this Task.
Table 1 More DataQtyIdentificationNameActionStep *[1]*[2]1464Z4951-1265RAT FITTING FOR-
WARD CA Inspect1 *[1] Do an X-Ray Fluorescence Spectrometer inspection of the Ram Air Turbine (RAT) forward fitting to determine the material in accordance with Appendix A.
*[2] As an option, do a High Frequency Eddy Current (HFEC) inspection of the RAT forward fitting to determine the material in accordance with 787 NDT Manual Part 6, 51-00-13.
B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 11 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM
REQUIREMENTS BULLETIN
Task 2 – RAM AIR TURBINE FORWARD FITTING REMOVAL [Group 1:]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM Page 12 of 31 Export Controlled ECCN: 9E991 See page 1 for details B787-81205-SB530090-00 RB Issue 001, 24 Feb 2025 12:00:00 AM