TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '24d96f9361203324e4163494b543d88d531ecb26cd2b098ea10ec987eeef84bf' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '24d96f9361203324e4163494b543d88d531ecb26cd2b098ea10ec987eeef84bf' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes DC10 Requirements Bulletin ALERT Number: DC10-54A111 RB Original Issue: June 26, 2020 ATA System: 5405 SUBJECT: NACELLES/PYLONS - Wing Pylon - Aft Bulkhead Bracket Inspection Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: June 26, 2020 DC10-54A111 RB 1 of 48
4.0
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 2 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
BLANK PAGE
Table of Contents
1 . E F F E C T I V I T Y5
A. Airplanes5
B . S p a r e s A f f e c t e d6
2. CONCURRENT REQUIREMENTS6
3 . C O M P L I A N C E6
4. APPROVAL8
5. ACCOMPLISHMENT INSTRUCTIONS9
A . G e n e r a l I n f o r m a t i o n9
B. Work Instructions ........................................... 1 1 FIGURE 1: LEFT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND C OLLAR INSPECTION .................................................. 1 4 FIGURE 2: RIGHT WING PYLON - AFT BULKHEAD BRACKET - LOCKBOLT AND COLLAR INSPECTION .................................................. 1 7 FIGURE 3: LEFT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND OP EN HOLE ETHF INSPECTION .......................................... 2 0 FIGURE 4: RIGHT WING PYLON - AFT BULKHEAD BRACKET - SURFACE AND O PEN HOLE ETHF INSPECTION .......................................... 3 1 APPENDIX D: SURFACE INSPECTION PROCEDURE ........................... 4 2 APPENDIX E: OPEN HOLE INSPECTION PROCEDURE .......................... 4 6 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 3 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 4 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
BLANK PAGE
Commercial Airplanes DC10 Requirements Bulletin ALERT Number: DC10-54A111 RB Original Issue: June 26, 2020 ATA System: 5405 SUBJECT: NACELLES/PYLONS - Wing Pylon - Aft Bulkhead Bracket Inspection
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity A. Airplanes This bulletin is applicable to DC-10-10, DC-10-15, DC-10-30, DC-10-40, DC-10-10F , DC-10-30F , DC-10-40F , DC-10-30F (KC-10A), DC-10-30F (KDC-10), MD-10-10F , MD-10-30F Airplane(s), line number(s) 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45-49, 50-59, 60-69, 70-79, 80-89, 90-99, 100-109, 110-119, 120-129, 130-139, 140-149, 150-159, 160-169, 170-179, 180-189, 190-199, 200-209, 210-219, 220-229, 230-239, 240-249, 250-259, 260-269, 270-279, 280-289, 290-299, 300-309, 310-319, 320-329, 330-339, 340-349, 350-359, 360-369, 370-379, 380-389, 390-399, 400-409, 410-419, 420-429, 430-439, 440-446 in 1 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
DESCRIPTIONCONFIGURATIONGROUP DC-10/MD-10 Airplanes.-1 Airplane Models:
DC-10-10, DC-10-10F , DC-10-15, DC-10-30, DC-10-30F , DC-10-30F (KC-10A), DC-10-30F (KDC-10), DC-10-40, DC-10-40F , MD-10-10F , MD-10-30F GroupFuselage Number 11 - 446 GroupFuselage Number -- GroupFuselage Number -- B. Spares Affected Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 5 of 48
Examine your spares supply for the parts or components identified below. If any parts or components are found, refer to Work Instructions for the recommended action.
Part NamePart Number WING PYLON AFT BULKHEAD ASSYAUB7025-27 WING PYLON AFT BULKHEAD ASSYAUB7025-29 SPARES KITAUB7025-31 SPARES KITAUB7025-33 WING PYLON AFT BULKHEAD ASSYAUB7025-9 WING PYLON AFT BULKHEAD ASSYAUB7025-11 SPARES KITAUB7025-13 SPARES KITAUB7025-15 WING PYLON AFT BULKHEAD ASSYAUB7025-35 WING PYLON AFT BULKHEAD ASSYAUB7025-37 SPARES KITAUB7025-39 SPARES KITAUB7025-41
2. CONCURRENT REQUIREMENTS None.
3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin DC10-54A111 RB. The Airworthiness Directive will make the compliance tasks and times given in DC10-54A111 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Table 1, in accordance with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 6 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of the Left and Right Wing Pylon Aft Bulkhead Bracket Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Within 1,700 flight cycles after the original issue date of Requirements Bulletin DC10- 54A111 RB.
Before 19,000 total flight cycles.
Do a general visual inspection of the left and right wing pylon at the aft bulkhead bracket for any lockbolt and collar.
Airplanes with 42,299 total flight cycles or less as of the original issue date of Requirements Bulletin DC10-54A111 RB.
-Within 6 months after the original issue date of Requirements Bulletin DC10- 54A111 RB.
Before 44,000 total flight cycles.
Do a general visual inspection of the left and right wing pylon at the aft bulkhead bracket for any lockbolt and collar.
Airplanes with 42,300 total flight cycles or more as of the original issue date of Requirements Bulletin DC10-54A111 RB.
-Before further flight.CONDITION 1 (ACTION 1):
Contact The Boeing Company for modification instructions and do the modification.
CONDITION 1: ANY
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET. -Before further flight.CONDITION 1 (ACTION 2):
Do a surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
-Before further flight.CONDITION 1.1 (ACTION 1):
Contact The Boeing Company for repair or replacement instructions and do the repair or replacement.
CONDITION 1.1: ANY
CRACK FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
3,800 flight cycles.-CONDITION 1.1 (ACTION 2):
Repeat surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
3,800 flight cycles.-Repeat surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
CONDITION 1.2: NO
CRACK FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 7 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of the Left and Right Wing Pylon Aft Bulkhead Bracket Repeat Interval (Not to Exceed) Compliance Time (Whichever Occurs Later) ActionCondition -Before further flight.Do a surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
CONDITION 2: NO
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
-Before further flight.CONDITION 2.1 (ACTION 1):
Contact The Boeing Company for repair or replacement instructions and do the repair or replacement.
CONDITION 2.1: ANY
CRACK FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
3,800 flight cycles.-CONDITION 2.1 (ACTION 2):
Repeat surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
3,800 flight cycles.-Repeat surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
CONDITION 2.2: NO
CRACK FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
4. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity.This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 8 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
5. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION NOTE: 1. This is an Enhanced Required for Compliance document. There wi ll be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC; this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boei ng processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.
3. Use the approved fastener and process material substitutions, in accordance with DC-10 or MD-10 Structural Repair Manual, Chapter 51.
4. If the length of any fastener specified in this service bulle tin does not meet installation standards given in Structural Repair Manual (SRM) Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this service bulletin.
5. A 1/8-inch thick stack of the same type washers called for in this service bulletin is the maximum thickness which may be used under fastener head or nut to counteract accumulation of tolerances.
EXCEPTION: When the available fastener length increments are greater than 1/16-inch, a 3/16-inch thick stack of the same type washers may be used.
6. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets are in DC-10 or MD-1 0 Structural Repair Manual, Chapter 51.
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 9 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
– Torque Values:
— Values for structural fasteners are given in DC-10 or MD-10 Structural Repair Manual, Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of DC-10 or MD-10 Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of DC-10 or MD-10 Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the applicable installation step.
7. A General Visual Inspection is defined as: A visual examinatio n of an interior or exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to enhance visual access to all exposed surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may require removal or opening of access panels or doors. Stands, ladders or platforms may be required to gain proximity to the area being checked.
8. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
9. If it is necessary to remove more parts for access, you can r emove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
10. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.
12. The compliance times for the actions in WORK INSTRUCTIONS ar e in Compliance.
Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 10 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
B. WORK INSTRUCTIONS Actions Required for Compliance:
1. Requirements Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of the Left and Right Wing Pylon Aft Bulkhead Bracket Refer to the listed procedures in SB DC10-54A111 Original Issue or later approved revisions as an accepted procedure Method Of Compliance ActionCondition PART 1: OPEN ACCESS.-Do a general visual inspection of the left and right wing pylon at the aft bulkhead bracket for any lockbolt and collar.
All airplanes -FIGURE 1 -FIGURE 2 --CONDITION 1 (ACTION 1):
Contact The Boeing Company for modification instructions and do the modification.
CONDITION 1: ANY
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET. PART 2: PREPARATION
FOR SURFACE ETHF IN- SPECTION and PART 3:
PREPARATION FOR OPEN HOLE ETHF INSPECTION.
-CONDITION 1 (ACTION 2):
Do a surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack. -FIGURE 3 -FIGURE 4 --CONDITION 1.1 (ACTION 1):
Contact The Boeing Company for repair or replacement instructions and do the repair or replacement.
CONDITION 1.1: ANY
CRACK FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
PART 4: CLOSE ACCESS.- PART 1: OPEN ACCESS, PART 2: PREPARATION
FOR SURFACE ETHF IN- SPECTION and PART 3:
PREPARATION FOR OPEN HOLE ETHF INSPECTION.
-CONDITION 1.1 (ACTION 2):
Repeat surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
-FIGURE 3 -FIGURE 4 PART 4: CLOSE ACCESS.- Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 11 of 48 REQUIREMENTS BULLETIN DC10-54A111
ALERTALERT
Table 1: Surface Eddy Current High Frequency (ETHF) Inspection and Open Hole ETHF Inspection of the Left and Right Wing Pylon Aft Bulkhead Bracket Refer to the listed procedures in SB DC10-54A111 Original Issue or later approved revisions as an accepted procedure Method Of Compliance ActionCondition PART 1: OPEN ACCESS, PART 2: PREPARATION
FOR SURFACE ETHF IN- SPECTION and PART 3:
PREPARATION FOR OPEN HOLE ETHF INSPECTION.
-Repeat surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
CONDITION 1.2: NO
CRACK FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
-FIGURE 3 -FIGURE 4 PART 4: CLOSE ACCESS.- PART 2: PREPARATION
FOR SURFACE ETHF IN- SPECTION and PART 3:
PREPARATION FOR OPEN HOLE ETHF INSPECTION.
-Do a surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
CONDITION 2: NO
LOCKBOLT AND COL-
LAR FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
-FIGURE 3 -FIGURE 4 --CONDITION 2.1 (ACTION 1):
Contact The Boeing Company for repair or replacement instructions and do the repair or replacement.
CONDITION 2.1: ANY
CRACK FOUND AT THE
WING PYLON AFT BULKHEAD BRACKET.
PART 4: CLOSE ACCESS.- PART 1: OPEN ACCESS, PART 2: PREPARATION
FOR SURFACE ETHF IN- SPECTION and PART 3:
PREPARATION FOR OPEN HOLE ETHF INSPECTION.
-CONDITION 2.1 (ACTION 2):
Repeat surface ETHF and open hole ETHF inspection of the left and right wing pylon aft bulkhead bracket for any crack.
-FIGURE 3 -FIGURE 4 PART 4: CLOSE ACCESS.- Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 26, 2020 DC10-54A111 RB 12 of 48 REQUIREMENTS BULLETIN DC10-54A111