Copy · SB-MD11-28-126-06--BOEING · 252 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0770; AD 2018-07-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'f38d9bab1714a5c768dcc54685ea637d098e703ec6d6c91618be9d364752a897'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes MD11 Service Bulletin Number: MD11-28-126 Original Issue: March 03, 2009 Revision 6: July 01, 2016 ATA System: 2811 SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies Routed Above the Center Upper Auxiliary Fuel Tank Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2009 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 1 of 252

2.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 2 of 252 BOEING SERVICE BULLETIN MD11-28-126

BLANK PAGE

Table of Contents

Revision Transmittal Sheet5

S u m m a r y7

1. PLANNING INFORMATION ........................................ 1 1 A . E f f e c t i v i t y ............................................... 1 1

1. Airplanes ............................................ 1 1 2 . S p a r e s A f f e c t e d ........................................ 1 4 B. Concurrent Requirements ...................................... 1 4 C. Reason ................................................ 1 4 D. Description .............................................. 1 5 E. Compliance .............................................. 1 7 F . A p p r o v a l ............................................... 1 8 G. Manpower .............................................. 1 8 H. Weight and Balance Changes .................................... 2 1 I. Electrical Load Data ......................................... 2 2 J . R e f e r e n c e s .............................................. 2 2

1. Existing Data: ......................................... 2 2

2. Data Supplied with this Service Bulletin: ........................... 2 2

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 2 K. Publications Affected ........................................ 2 2 L. Interchangeability and Intermixability of Parts ........................... 2 3 M. Software Accomplishment Summary ................................ 2 3

2. MATERIAL INFORMATION ........................................ 2 5 A. Material - Price and Availability ................................... 2 5 B. Industry Support Information .................................... 2 6 C. Parts Necessary for Each Airplane ................................. 2 6 1 . K i t s / P a r t s : ........................................... 2 6

2. Parts and Materials Supplied by the Operator: ........................ 3 6

3. Parts Modified and Reidentified: ............................... 3 7

4. Parts Removed and Not Replaced: .............................. 3 7 D. Parts Necessary to Change Spares ................................. 3 7 E. Special Tooling - Price and Availability ............................... 3 7 F. Special Tooling Necessary to do this Service Bulletin ....................... 3 7

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 9 A. GENERAL INFORMATION ..................................... 3 9 B. WORK INSTRUCTIONS ....................................... 4 2 FIGURE 1: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 1, Configuration 1] .... 5 6 FIGURE 2: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 1, Configuration 1] . 61 FIGURE 3: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 1, Configuration 1 ] ................................................ 6 5 FIGURE 4: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 1, Configuration 1; Group 3] .................................................. 7 2 FIGURE 5: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 1, Configuration 1; Group 3 ] ................................................ 7 7 FIGURE 6: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 1, Configuration 1; Group 3] ........................................... 8 0 FIGURE 7: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 2, Configuration 1] .... 8 6 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 3 of 252 BOEING SERVICE BULLETIN MD11-28-126

FIGURE 8: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 2, Configuration 1] . 91 FIGURE 9: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 2, Configuration 1 ] ................................................ 9 4 FIGURE 10: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 2, Configuration 1; Group 4] ................................................. 1 0 1 FIGURE 11: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 2, Configuration 1; Group 4 ] ................................................ 1 0 6 FIGURE 12: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 2, Configuration 1; Group 4] .......................................... 1 0 9 FIGURE 13: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 3] ............ 1 1 5 FIGURE 14: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 3] ......... 1 2 3 FIGURE 15: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 3] .... 1 2 8 FIGURE 16: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 4] ............ 1 3 7 FIGURE 17: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 4] ......... 1 4 4 FIGURE 18: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 4] .... 1 4 9 FIGURE 19: LEFT AND RIGHT SIDE WIRE BUNDLE - INSPECTION [Group 1, Configuration 2] . . . 158 FIGURE 20: LEFT AND RIGHT SIDE WIRE BUNDLE - INSPECTION [Group 2, Configuration 2] . . . 163 FIGURE 21: BARRIER/SHIELD SLEEVING AND CLAMPING INSTALLATION - LEFT AND RIGHT SIDE [Group 1, Configuration 2] .................................. 1 6 8 FIGURE 22: BARRIER/SHIELD SLEEVING AND CLAMPING INSTALLATION - LEFT AND RIGHT SIDE [Group 2, Configuration 2] .................................. 1 7 4 FIGURE 23: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 5, Configuration 1] . . . 181 FIGURE 24: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 5, Configuration 1] . 186 FIGURE 25: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 5, Configuration 1 ] ................................................ 1 8 9 FIGURE 26: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 5, Configuration 1] . . 196 FIGURE 27: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 5, Configuration 1] . 201 FIGURE 28: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 5, Configuration 1 ] ................................................ 2 0 4 FIGURE 29: WIRE BUNDLE - INSPECTION [Group 5, Configuration 2] ................. 2 1 0 FIGURE 30: BARRIER SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 5, Configuration 2] . 212 FIGURE 31: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 5, Configuration 2 ] ................................................ 2 1 5 FIGURE 32: CLAMPS AT FLOOR BEAMS, LEFT SIDE - REMOVAL [Group 6] ............ 2 1 9 FIGURE 33: BARRIER/SHIELD SLEEVING, LEFT SIDE - INSTALLATION [Group 6] ......... 2 2 4 FIGURE 34: CLAMPS AND EXTRUDED CHANNEL, LEFT SIDE - INSTALLATION [Group 6] .... 2 2 7 FIGURE 35: CLAMPS AT FLOOR BEAMS, RIGHT SIDE - REMOVAL [Group 6] ............ 2 3 4 FIGURE 36: BARRIER/SHIELD SLEEVING, RIGHT SIDE - INSTALLATION [Group 6] ........ 2 3 9 FIGURE 37: CLAMPS AND EXTRUDED CHANNEL, RIGHT SIDE - INSTALLATION [Group 6] .... 2 4 2 APPENDIX A: TYPICAL APPLICATION OF DMS 2379, TYPE 4, CLASS 4 SLEEVING (ROUNDIT 2000NX) FOR INSTALLATION ..................................... 2 4 8 APPENDIX B: TYPICAL JOINING OF TWO PIECES OF DMS2379, TYPE 4 CLASS 4 SLEEVING . . . 249 APPENDIX C: TYPICAL DMS 2379, TYPE 4, CLASS 4 SLEEVING AT BREAKOUTS .......... 2 5 0 APPENDIX D: PART DEMAND ........................................ 2 5 2 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 4 of 252 BOEING SERVICE BULLETIN MD11-28-126

Commercial Airplanes MD11 Service Bulletin Revision Transmittal SheetNumber: MD11-28-126Original Issue: March 03, 2009 Revision 6: July 01, 2016 ATA System: 2811 SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies Routed Above the Center Upper Auxiliary Fuel Tank This revision includes all page of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Airworthiness Directive AD 2014-03-07 is related to this service bulletin.

Effects of this Revision on airplanes on which Original Issue, Revision 1, Revision 2, Revision 3, Revision 4 or Revision 5 was previously done:

See Paragraph 1.D., Description for more information.

REASON FOR REVISION This Revision is sent to add the instructions for the additional "General Visual Inspection of the additional center upper auxiliary fuel tank locations of the wires bundles" for Group 1, 2, 5, Configuration 2 airplanes to Paragraph

3.B., Work Instructions. Revision 5 of this service bulletin added the requirement for the additional Inspection but did not include the information in Paragraph 3.B., Work Instructions.

This revision is also sent to tell operators that Administration (FAA) Airworthiness Directive AD 2014-03-07 supersedes Airworthiness Directive AD 2009-26-16.

These sections are changed:

Summary Background: Added Planning Data table.

Summary Action: Changed to match Paragraph 1.D., Description.

Summary Compliance: Latest standards applied and reference to AD 2009-26-16 removed.

Summary Material Information: Changed to add reference to part demand intent appendix.

Paragraph 1.E., Compliance: Latest standards applied and reference to AD 2009-26-16 removed.

Paragraph 1.F., Approval: Changed to remove AMOC paragraph related to AD 2009-26-16 and updated AMOC paragraph related to AD 2014-03-07.

Paragraph 1.J., References: Airworthiness Directive AD 2009-26-16 removed from the reference list.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 5 of 252

Paragraph 2.A., Material - Price and Availability: Changed to update price information and to add reference to part demand intent appendix.

Paragraph 3.B., Work Instructions: Changed to add new General Visual Inspection requirements for Groups 1, 2 and 5, Configuration 2 airplanes.

APPENDIX D: Part demand intent added.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes, to show the location of all content changes.

Pages with no vertical lines have no changes.

REVISION HISTORY March 03, 2009Original Issue:

June 18, 2009Revision 1:

November 18, 2010Revision 2:

June 03, 2011Revision 3:

November 29, 2011Revision 4:

July 29, 2014Revision 5:

July 01, 2016Revision 6:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 6 of 252 BOEING SERVICE BULLETIN MD11-28-126

Commercial Airplanes MD11 Service Bulletin SummaryNumber: MD11-28-126Original Issue: March 03, 2009 Revision 6: July 01, 2016 ATA System: 2811 SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies Routed Above the Center Upper Auxiliary Fuel Tank

CONCURRENT REQUIREMENTS None.

BACKGROUND Boeing Special Federal Aviation Regulation (SFAR) 88 engineering investigations have determined that wires routed above the center upper auxiliary fuel tank are in close proximity to the upper surface of the tank. In addition some wire harness mounts may have loosened, allowing the wires to contact the tank. This condition may cause wire damage or chafing that can lead to possible arcing and sparking on the fuel tank upper surface.

Inspecting the wires will determine the condition of the wires. Installation of nonmetallic barrier/shield sleeving, new clamps, and new extruded channels for wiring support will minimize the possibility of wires contacting the fuel tank upper surface. If not corrected, wires contacting the center upper auxiliary fuel tank surface may become damaged, and the possibility of arcing and sparking may lead to burn-through of the upper surface of the fuel tank. Burn-through on the upper surface of the fuel tank could potentially result in a tank explosion.

This service bulletin resulted from the safety assessments conducted by Boeing under Special Federal Aviation Regulation (SFAR) 88, Fuel Tank System Fault Tolerance Evaluation Requirements.

This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.

ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph

1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedNoPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 7 of 252

ReferenceAffectedPlanning Data Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION Group 1-2, Configuration 1; Group 3-4; Group 5, Configuration 1; Group 6:

This service bulletin gives instructions to do as follows:

1. Does a General Visual Inspection of the wires bundles to determine if wires touch the upper surface of the center upper auxiliary fuel tank and marking locations as necessary.

2. Does a Detailed Inspection of the wires routed above the center upper auxiliary fuel tank for splices and damage (such as chafing, arcing and broken insulation) to wire bundles and does corrective action if necessary.

3. Does a Detailed Inspection of the upper surface of the center upper auxiliary fuel tank for damage to the fuel barrier seal and damage to the fuel tank and does corrective action as necessary.

4. Installs a nonmetallic barrier/shield sleeving to the wire harnesses, new clamps, new attaching hardware, and a new extruded channel, to raise the wire harnesses off the upper surface of the center upper auxiliary fuel tank.

Group 1, Configuration 2:

This service bulletin gives instructions to do as follows:

1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the wires bundles to determine if wires touch the upper surface of the additional center upper auxiliary fuel tank and corrective actions as necessary.

2. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic barrier/shield sleeving, extruded channels and replaces clamps in the locations that follow:

a. Passenger Configuration - From Y=1238.950 to 1256.000, Between X=81.00 to X=106.00

b. Passenger Configuration - From Y=1238.950 to 1256.800, Between X= -81.00 to X= -106.00

c. Passenger or Freighter - From Y=1238.950 to 1381.000, Between X=60.00 to X=70.00.

Group 2, Configuration 2:

This service bulletin gives instructions to do as follows:

1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the wires bundles to determine if wires touch the upper surface of the additional center upper auxiliary fuel tank and corrective actions as necessary.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 8 of 252 BOEING SERVICE BULLETIN MD11-28-126

2. A Detailed Inspection (DI) of wire bundles for splices, damage and fuel tank fuel barrier seal damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic barrier/shield sleeving, extruded channels and replaces clamps in the locations that follow:

a. Passenger Configuration - From Y=1238.950 to 1275.250, Between X=81.00 to X=106.00

b. Passenger Configuration - From Y=1238.950 to 1275.250, Between X= -81.00 to X= -106.00.

Group 5, Configuration 2:

This service bulletin gives instructions to do as follows:

1. Does General Visual Inspection of the additional center upper auxiliary fuel tank locations of the wires bundles to determine if wires touch the upper surface of the additional center upper auxiliary fuel tank and corrective actions as necessary.

2. A Detailed Inspection (DI) of wire assembly run AES9601 - ENR for splices, damage and fuel tank fuel barrier seal damage on the center upper auxiliary fuel tank and corrects as necessary. Also installs nonmetallic barrier/shield sleeving, extruded channels and replaces clamps.

a. Passenger or Freighter - From Y=1238.950 to 1381.000, Between X= 60.00 to X= 70.00.

EFFECTIVITY MD-11 and MD-11F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).

COMPLIANCE Federal Aviation Administration (FAA) Airworthiness DirectiveAD 2014-03-07 is related to this service bulletin.

The effective date of AD 2014-03-07 is March 26, 2014.

Boeing recommends that the inspection/change given in this service bulletin be done within 60 months after the effective date of Federal Aviation Administration (FAA) Airworthiness Directive AD 2014-03-07 .

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the changes and/or repair procedures given in this service bulletin.

MANPOWER Refer to Paragraph 1.G., Manpower

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability Operators are encouraged to complete the survey provided in APPENDIX D of this service bulletin to help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 9 of 252 BOEING SERVICE BULLETIN MD11-28-126

Page 10OCROpen in PDF

BOEING SERVICE BULLETIN MD11-28-126 D D

INSPECTION AND SLEEVING INSTALLATION OF

WIRE ASSEMBLIES ROUTED ABOVE THE CENTER

UPPER AUXILIARY FUEL TANK 2022707 Original Issue: March 03, 2009 Revision 6: July 01, 2016 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING MD11-28-126 Work - See page 1 for details. 10 of 252

Commercial Airplanes MD11 Service Bulletin Number: MD11-28-126 Original Issue: March 03, 2009 Revision 6: July 01, 2016 ATA System: 2811 SUBJECT: FUEL - Integral Fuel Tanks - Inspection and Sleeving Installation of Wire Assemblies Routed Above the Center Upper Auxiliary Fuel Tank

1. PLANNING INFORMATION A. Effectivity

1. Airplanes This service bulletin is for the airplanes shown below.

When a Group 3 or Group 4 airplane shown below is modified to a freighter configuration by Boeing Passenger to Freighter (P to F) engineering, it will become a Group 1 or Group 2 airplane respectively.

DESCRIPTIONCONFIGURATIONGROUP Applicable to MD-11/MD-11F airplanes with Wire Support Brackets P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary Fuel Tank.

-1 Applicable to MD-11/MD-11F operators who have not accomplished prior issues of this service bulletin.

1 Applicable to MD-11/MD-11F operators who have accomplished prior issues of this service bulletin.

2 Applicable to MD-11/MD-11F airplanes without Wire Support Brackets P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary Fuel Tank.

-2 Applicable to MD-11/MD-11F operators who have not accomplished prior issues of this service bulletin.

1 Applicable to MD-11 operators who have accomplished prior issues of this service bulletin.

2 Applicable to MD-11/MD-11F airplanes with Wire Support Brackets P/N AAP8000-559 and AAP8000-1527 and with Forward Auxiliary Fuel Tank.

-3 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 11 of 252

DESCRIPTIONCONFIGURATIONGROUP Applicable to MD-11 airplanes without Wire Support Brackets P/N AAP8000-559 and AAP8000-1527 and with Forward Auxiliary Fuel Tank.

-4 Applicable to MD-11/MD-11F airplanes with Wire Support Brackets P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary Fuel Tank.

-5 Applicable to MD-11/MD-11F operators who have not accomplished prior issues of this service bulletin.

1 Applicable to MD-11/MD-11F operators who have accomplished prior issues of this service bulletin.

2 Applicable to MD-11F airplanes without Wire Support Brackets P/N AAP8000-559 and AAP8000-1527 and without Forward Auxiliary Fuel Tank.

-6 Airplane Models:

MD-11, MD-11F GroupFuselage Number 2447 - 449 2451 - 459 2460 - 464 2466 - 469 2470 - 479 2480 - 487 6488 2489 6491 2492 - 499 2500 - 509 2510 - 517 2519 2520 - 529 2530 - 531 4532 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: March 03, 2009 MD11-28-126Revision 6: July 01, 2016 12 of 252 BOEING SERVICE BULLETIN MD11-28-126

Pages 13–24 of 252