Copy · SB-737-29-1127-00--RB · 12 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0114, the docket of AD 2019-14-02. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '86569929f3753c93eb90def1b61b9f4069e79e8bc35d68a8a989d4ab22675ae5'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 737 Requirements Bulletin

SPECIAL ATTENTION Number: 737-29-1127 RB Original Issue: October 08, 2018 ATA System: 2911 2915 SUBJECT: HYDRAULIC POWER - Hydraulic Systems A and B - Pressure Module Check Valve Inspection And Replacement Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

Copyright © 2018 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: October 08, 2018 737-29-1127 RB 1 of 12

2.0

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 2 of 12 REQUIREMENTS BULLETIN 737-29-1127

BLANK PAGE

Table of Contents

1. EFFECTIVITY5

A. Airplanes5

B. Spares Affected5

2. CONCURRENT REQUIREMENTS5

3. COMPLIANCE6

4. APPROVAL7

5. ACCOMPLISHMENT INSTRUCTIONS9

A. General Information9

B. Work Instructions10

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 3 of 12 REQUIREMENTS BULLETIN 737-29-1127

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 4 of 12 REQUIREMENTS BULLETIN 737-29-1127

BLANK PAGE

Commercial Airplanes 737 Requirements Bulletin

SPECIAL ATTENTION Number: 737-29-1127 RB Original Issue: October 08, 2018 ATA System: 2911 2915 SUBJECT: HYDRAULIC POWER - Hydraulic Systems A and B - Pressure Module Check Valve Inspection And Replacement BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE

THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

1. EFFECTIVITY A. Airplanes This bulletin is applicable to 737-100/200/200C/300/400/500 Airplanes, line number 1-3132.

DESCRIPTIONCONFIGURATIONGROUP 737-100, 737-200, 737-200C airplanes line numbers 1 thru 291.-1 737-200, 737-200C airplanes that could have one or more Parker P/N H61C0552M1 pressure module check valves installed in hydraulic system A.

-2 737-300, 737-400, 737-500 airplanes that could have one or more Parker P/N H61C0552M1 pressure module check valves installed in hydraulic systems A and B.

-3 B. Spares Affected None.

2. CONCURRENT REQUIREMENTS None.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 5 of 12

3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin 737-29-1127 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin 737-29-1127 RB mandatory.

Accomplish the required actions, based on the applicable conditions in Table 1, in accordance with the Accomplishment Instructions.

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.

Group 1:

Boeing endorses the FAA rules related to Limit of Validity (LOV) and recommends immediate and permanent removal from service of any airplanes upon reaching the LOV, whether or not it is operated under FAA jurisdiction. As such, Boeing no longer provides maintenance instructions for airplanes that have accumulated flight cycles beyond the LOV. Airplanes in Group 1 (line numbers 1-291) have accumulated flight cycles beyond the LOV of the maintenance program. 14 CFR 121.1115 and 129.115 prohibit operation of an airplane beyond its LOV.

Group 2-3:

Table 1: Main Landing Gear Wheel Well - Pressure Module Check Valve Replacement Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 5,360 flight hours after the original issue date of Requirements Bulletin 737-29- 1127 RB.

OPTION 1: Do a check of maintenance and delivery records to identify the part numbers of the two hydraulic system A pressure module check valves. (a)(b) All Group 2 Airplanes OPTION 2: Do an on-airplane inspection for the part numbers of the two hydraulic system A pressure module check valves. (b) Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 6 of 12 REQUIREMENTS BULLETIN 737-29-1127

Group 2-3:

Table 1: Main Landing Gear Wheel Well - Pressure Module Check Valve Replacement Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 5,360 flight hours after the original issue date of Requirements Bulletin 737-29- 1127 RB.

OPTION 1: Do a check of maintenance and delivery records to identify the part numbers of the four hydraulic systems A and B pressure module check valves. (a)(b) All Group 3 Airplanes OPTION 2: Do an on-airplane inspection for the part numbers of the four hydraulic systems A and B pressure module check valves. (b) --No further action is required.

CONDITION 1: NO PARK- ER P/N H61C0552M1

CHECK VALVE FOUND -Within 5,360 flight hours after the original issue date of Requirements Bulletin 737-29- 1127 RB.

Replace with a Crissair P/N 1C4196 check valve.

CONDITION 2: ANY

PARKER P/N H61C0552M1 CHECK

VALVE FOUND

(a) It is necessary to do OPTION 2 if the manufacturer's name or part numbers of the installed check valves cannot be positively identified in the records check.

(b) If the part number cannot be positively identified, it is acceptable to identify the installed check valve by the manufacturer's name.

4. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 7 of 12 REQUIREMENTS BULLETIN 737-29-1127

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 8 of 12 REQUIREMENTS BULLETIN 737-29-1127

BLANK PAGE

5. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD.

Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures.

For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC; this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition.

Figures not required for compliance are omitted from the RB.

2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.

3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.

4. These work instructions refer to procedures included in other Boeing documents.

When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.

5. Unless shown differently, these dimensions and tolerances are used:

– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in Structural Repair Manual (SRM) Chapter 51 – Torque Values:

— Values for structural fasteners are given in 737 Structural Repair Manual, Chapter 51.

— Values for airframe maintenance tasks are included in Chapter 20 of 737 Aircraft Maintenance Manual (AMM).

— Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).

— Values for engine maintenance tasks are included in Chapter 70 of 737 Aircraft Maintenance Manual (AMM).

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 9 of 12 REQUIREMENTS BULLETIN 737-29-1127

— Non-standard torque values for maintenance tasks are included in the applicable installation step.

6. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.

7. If the length of any fastener specified in this service bulletin does not meet installation standards given in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this service bulletin.

8. The instructions in the Work Instructions and the figures can include operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain data on versions of the tools or test equipment that you can use. It is permitted to use replaced tools. It is not permitted to use superseded tools.

9. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.

B. WORK INSTRUCTIONS Actions Required for Compliance

1. Requirements Group 1:

Boeing endorses the FAA rules related to Limit of Validity (LOV) and recommends immediate and permanent removal from service of any airplanes upon reaching the LOV, whether or not it is operated under FAA jurisdiction. As such, Boeing no longer provides maintenance instructions for airplanes that have accumulated flight cycles beyond the LOV. Airplanes in Group 1 (line numbers 1-291) have accumulated flight cycles beyond the LOV of the maintenance program. 14 CFR

121.1115 and 129.115 prohibit operation of an airplane beyond its LOV.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 10 of 12 REQUIREMENTS BULLETIN 737-29-1127

Group 2-3:

Table 1: Main Landing Gear Wheel Well - Pressure Module Check Valve Replacement Refer to the listed procedures in SB 737-29-1127 Original Issue or later approved revisions as an accepted procedure:

Method of Compliance ActionCondition Do PART 1: RECORDS CHECK -OPTION 1: Do a check of maintenance and delivery records to identify the part numbers of the two hydraulic system A pressure module check valves.

(a)(b) All Group 2 Airplanes Do PART 2: PREPARA- TION -OPTION 2: Do an on-airplane inspection for the part numbers of the two hydraulic systems A and B pressure module check valves. (b) Do PART 3: PART NUM-

BER INSPECTION - Do PART 1: RECORDS CHECK -OPTION 1: Do a check of maintenance and delivery records to identify the part numbers of the four hydraulic systems A and B pressure module check valves. (a)(b) All Group 3 Airplanes Do PART 2: PREPARA- TION -OPTION 2: Do an on-airplane inspection for the part numbers of the four hydraulic systems A and B pressure module check valves. (b) Do PART 3: PART NUM-

BER INSPECTION - Do PART 5: RESTORA- TION if PART 2 was done -No further action is required.

CONDITION 1: NO PARK- ER P/N H61C0552M1

CHECK VALVE FOUND Do PART 2: PREPARA- TION if not previously done -Replace with a Crissair P/N 1C4196 check valve.

CONDITION 2: ANY

PARKER P/N H61C0552M1 CHECK VALVE FOUND Do PART 4: CHECK

VALVE REPLACEMENT - Do PART 5: RESTORA- TION -

(a) It is necessary to do OPTION 2 if the manufacturer's name or part numbers of the installed check valves cannot be positively identified in the records check.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 11 of 12 REQUIREMENTS BULLETIN 737-29-1127

Group 2-3:

Table 1: Main Landing Gear Wheel Well - Pressure Module Check Valve Replacement Refer to the listed procedures in SB 737-29-1127 Original Issue or later approved revisions as an accepted procedure:

Method of Compliance ActionCondition

(b) If the part number cannot be positively identified, it is acceptable to identify the installed check valve by the manufacturer's name.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: October 08, 2018 737-29-1127 RB 12 of 12 REQUIREMENTS BULLETIN 737-29-1127