TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'cd3e3ba0d0c6b7e7d8715aedf962ed4438b9dcb76368d3de5f51417ef6e57119' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'cd3e3ba0d0c6b7e7d8715aedf962ed4438b9dcb76368d3de5f51417ef6e57119' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 747 Service Bulletin
SPECIAL ATTENTION Number: 747-71-2332 Original Issue: May 30, 2014 Revision 1: May 28, 2015 ATA System: 7121 SUBJECT: POWER PLANT - Engine Mounts - Forward Engine Mount Barrel Nut Installation Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2014 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 1 of 67
4.0
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 2 of 67 BOEING SERVICE BULLETIN 747-71-2332
BLANK PAGE
Table of Contents
Revision Transmittal Sheet5
Summary7
1. PLANNING INFORMATION13
A. Effectivity13
1. Airplanes13
2. Spares Affected14
B. Concurrent Requirements14
C. Reason14
D. Description16
E. Compliance17
F. Approval19
G. Manpower19
H. Weight and Balance Changes21
I. Electrical Load Data21
J. References21
1. Existing Data:21
2. Data Supplied with this Service Bulletin:22
3. Installation Drawings Used in the Preparation of this Service Bulletin:22
K. Publications Affected22
L. Interchangeability and Intermixability of Parts22
M. Software Accomplishment Summary22
2. MATERIAL INFORMATION23
A. Material - Price and Availability23
B. Industry Support Information23
C. Parts Necessary for Each Airplane23
1. Kits/Parts23
2. Parts and Materials Supplied by the Operator24
3. Parts Modified and Reidentified24
4. Parts Removed and Not Replaced24
D. Parts Necessary to Change Spares24
E. Special Tooling - Price and Availability24
F. Special Tooling Necessary to do this Service Bulletin25
3. ACCOMPLISHMENT INSTRUCTIONS27
A. GENERAL INFORMATION27
B. WORK INSTRUCTIONS29
FIGURE 1: FORWARD ENGINE MOUNT BARREL NUT INSTALLATION34
FIGURE 2: STRUT BULKHEAD AND FORWARD ENGINE MOUNT GENERAL VISUAL INSPECTION. 39
FIGURE 3: FORWARD ENGINE MOUNT BARREL NUT ULTRASONIC INSPECTION41
FIGURE 4: ENGINE 1 AND 2 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
.44
FIGURE 5: ENGINE 3 AND 4 FORWARD ENGINE MOUNT BARREL NUT NUT-BY-NUT REPLACEMENT
.50
FIGURE 6: FORWARD ENGINE MOUNT BARREL NUT TORQUE AND TORQUE STRIPE APPLICATION
.56
APPENDIX A: ULTRASONIC (UT) INSPECTION PROCEDURE59
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 3 of 67 BOEING SERVICE BULLETIN 747-71-2332
APPENDIX B: LOGIC DIAGRAM66
APPENDIX C: PART DEMAND INTENT67
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 4 of 67 BOEING SERVICE BULLETIN 747-71-2332
Commercial Airplanes 747 Service Bulletin
SPECIAL ATTENTION Revision Transmittal SheetNumber: 747-71-2332Original Issue: May 30, 2014 Revision 1: May 28, 2015 ATA System: 7121 SUBJECT: POWER PLANT - Engine Mounts - Forward Engine Mount Barrel Nut Installation This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION Effects of this Revision on airplanes on which Original Issue was previously done:
See Paragraph 1.D., Description for more information.
No airplanes were added to this service bulletin effectivity.
REASON FOR REVISION This revision is sent to add notes to state that removed forward engine mount barrel nuts cannot be reinstalled in the forward engine mount assemblies after incorporation of this service bulletin.
These sections were changed:
1. Airplanes RC573, RC526, RC510, RC511, RC009, RC642 were moved from Group 1 to the new Group
2.
NOTE: These airplanes were moved from Group 1 to the new Group 2 because these airplanes were delivered with the original release of this service bulletin incorporated.
2. In Summary, Summary Evaluation Table was changed.
3. In Paragraph 1.A.2, Spares Affected, paragraph and table were added.
4. In Paragraph 1.D., WORK PACKAGE 2, Added Group 1 and Group 2 Condition table
5. In Paragraph 1.E., Compliance, Note (b) was added to the Table 3.
6. In Paragraph 3.B., Work Instructions, a Note was added to the Work Package 2.
7. In Figure 1, Note (h) was added to the table.
8. In Figure 4, Note (g) was added to the table.
9. In Figure 5, Note (g) was added to the table.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 5 of 67
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes, to show the location of all content changes.
Pages with no vertical lines have no changes.
REVISION HISTORY May 30, 2014Original Issue:
May 28, 2015Revision 1:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 6 of 67 BOEING SERVICE BULLETIN 747-71-2332
Commercial Airplanes 747 Service Bulletin
SPECIAL ATTENTION SummaryNumber: 747-71-2332Original Issue: May 30, 2014 Revision 1: May 28, 2015 ATA System: 7121 SUBJECT: POWER PLANT - Engine Mounts - Forward Engine Mount Barrel Nut Installation BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS None.
BACKGROUND Accomplishment of this service bulletin will install newly designed barrel nuts on the forward engine mount to eliminate the complete failure of barrel nuts. Some existing barrel nuts on the forward engine mount have been found to be cracked. A crack on both sides of the barrel nut will cause complete failure of the barrel nut. If the existing barrel nuts on the forward engine mount are not replaced, the existing barrel nuts could become cracked.
A complete failure of two or more barrel nuts on the same engine reduces the load capacity of the forward engine mount and could result in separation of an engine from the airplane. Separation of an inboard engine under power could result in loss of control of the airplane.
An operator reported that while replacing the No.2 engine, the Non Destructive Test (NDT) inspection of the barrel nuts on the forward engine mount revealed cracks on 2 out of 4 barrel nuts. The operator also discovered 1 cracked barrel nut on the No. 1 engine. This was the first reported occurrence on the 747-8. Also, The Boeing Company did a NDT inspection of barrel nuts on a flight test airplane. There were 2 barrel nuts where a crack had initiated on the No. 2 engine. Since that time, Boeing service bulletin 747-71A2329 was issued to inspect the barrel nuts on the forward engine mounts. A total of 8 barrel nuts have been found with cracks. These barrel nuts are located at the forward end of the strut box and are used to fasten the forward engine mount to the strut.
A barrel nut with a crack on one side will still be able to carry ultimate load. A crack on both sides of the barrel nut will cause complete failure of the barrel nut. Boeing has not received any reports of a barrel nut with a crack on both sides.
The newly designed barrel nut has increased strength due to its improved features. There is a deeper counterbore to help prevent high stress concentrations around the saddle of the barrel nut. As well, the barrel nut has more material added to it than the previous barrel nut to increase strength. As well, the reduced torque will prevent the newly designed barrel nuts from cracking.
This service bulletin gives instructions to install newly designed barrel nuts on the forward engine mount. This will prevent the complete failure of barrel nuts that could result in the separation of an engine from the airplane.
This service bulletin also gives instructions to update the airplane scheduled maintenance program to incorporate the 747-8/-8F Airworthiness Limitation (AWL), Document Number D011U721-02-01, SSI 54-50-003c, applicable to 747-8/-8F airplanes with barrel nut SL4750NA at the forward engine mount.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 7 of 67
This service bulletin is terminating action for all actions in Boeing service bulletin 747-71A2329 original release and AD 2013-24-12.
Boeing Fleet Team Digest (FTD) 747 FTD 71-13001 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-8-SRP-71-0060 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.
ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedYesSpares Affected Paragraph 1.E., Compliance and Paragraph
1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION (PRR 85901-134S) WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
1. Do one of the following:
a. Do PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT.
(1) Gain access. Install forward bootstrap. Replace barrel nuts on forward engine mount. Remove forward bootstrap. Close access.
or
b. Do PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD ENGINE MOUNT and PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT BARREL NUTS and PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 8 of 67 BOEING SERVICE BULLETIN 747-71-2332
(1) Gain access. Do general visual inspection of strut bulkhead and forward engine mount. Do ultrasonic inspection of forward engine mount barrel nuts. Replace forward engine mount barrel nuts. Close access.
WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED
MAINTENANCE PROGRAM CHANGE
1. Update the airplane scheduled maintenance program to incorporate the 747-8/-8F Airworthiness Limitation (AWL), Document Number D011U721-02-01, SSI 54-50-003c, applicable to 747-8/-8F airplanes with barrel nut SL4750NA at the forward engine mount.
EFFECTIVITY 747-8/-8F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-24-12 is related to this service bulletin.
The effective date of AD 2013-24-12 is December 17, 2013.
This service bulletin is terminating action for all actions in Boeing service bulletin 747-71A2329 original release and AD 2013-24-12.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION Please refer to Paragraph 2.B., Industry Support Information.
MANPOWER Elapsed HoursTotal Task HoursEngines
7.0017.00PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT (a)
3.953.95PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD ENGINE MOUNT (a)
4.254.25PART 3: ULTRASONIC INSPECTION OF FORWARD EN- GINE MOUNT BARREL NUTS (a)
6.0010.00PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT (a)
3.009.00PART 5: BOOTSTRAP INSTALLATION AND CONTACT BOEING. (a) (b)
(a) Estimated hours are for 1 engine.
(b) The hours required to contact Boeing for the repair and to do the repair could not be estimated and are not included.
Refer to Paragraph 1.G., Manpower.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 9 of 67 BOEING SERVICE BULLETIN 747-71-2332
MATERIAL INFORMATION Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Operators are encouraged to complete the survey provided in APPENDIX C of this service bulletin to help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 10 of 67 BOEING SERVICE BULLETIN 747-71-2332
BOEING SERVICE BULLETIN 747-71-2332 WORK PACKAGE 1 - FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT
1. DO ONE OF THE FOLLOWING:
A. DO PART 1: BOOTSTRAP INSTALLATION AND FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT.
1. GAIN ACCESS. INSTALL FORWARD BOOTSTRAP. REPLACE BARREL NUTS ON FORWARD ENGINE MOUNT. REMOVE FORWARD BOOTSTRAP. CLOSE ACCESS
2. DO PART 2: GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD ENGINE MOUNT AND PART 3: ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT BARREL NUTS AND PART 4: NUT-BY-NUT METHOD OF FORWARD ENGINE MOUNT BARREL NUT REPLACEMENT.
A. GAIN ACCESS. DO GENERAL VISUAL INSPECTION OF STRUT BULKHEAD AND FORWARD ENGINE MOUNT. DO ULTRASONIC INSPECTION OF FORWARD ENGINE MOUNT BARREL NUTS. REPLACE FORWARD ENGINE MOUNT BARREL NUTS.
CLOSE ACCESS.
WORK PACKAGE 2: FORWARD ENGINE MOUNT BARREL NUT - AIRPLANE SCHEDULED
MAINTENANCE PROGRAM CHANGE
1. UPDATE THE AIRPLANE SCHEDULED MAINTENANCE PROGRAM TO INCORPORATE THE 747-8/-8F AIRWORTHINESS LIMITATION (AWL), DOCUMENT NUMBER D011U721-02-01, SSI 54-50-003, APPLICABLE TO 747-8/-8F AIRPLANES WITH BARREL NUT SL4750NA AT THE FORWARD ENGINE MOUNT.
Original Issue: May 30, 2014 Revision 1: May 28, 2015 Export Controlled ECCN: 9E991 - BOEING 747-71-2332 PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 67
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: May 30, 2014 747-71-2332Revision 1: May 28, 2015 12 of 67 BOEING SERVICE BULLETIN 747-71-2332