TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'ca0f681a64808b971bfeaf36e5665374442e588781c219aff45e936093cbd0f5' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'ca0f681a64808b971bfeaf36e5665374442e588781c219aff45e936093cbd0f5' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 757 Service Bulletin
SPECIAL ATTENTION Number: 757-24-0132 Original Issue: April 14, 2011 Revision 1: June 19, 2012 ATA System: 2431 SUBJECT: ELECTRICAL POWER - Batteries - Change to the Battery Charger System Wiring for Extended Flight on Limited Standby Power Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2011 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management Company.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 1 of 76
11.0
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 2 of 76 BOEING SERVICE BULLETIN 757-24-0132
BLANK PAGE
Table of Contents
Revision Transmittal Sheet5
Summary9
1. PLANNING INFORMATION ........................................ 1 3 A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 1 7 B. Concurrent Requirements ...................................... 1 7 C. Reason ................................................ 1 8 D. Description .............................................. 1 8 E. Compliance .............................................. 1 9 F. Approval ............................................... 1 9 G. Manpower .............................................. 2 0 H. Weight and Balance Changes .................................... 2 3 I. Electrical Load Data ......................................... 2 3 J. References .............................................. 2 3
1. Existing Data: ......................................... 2 3
2. Data Supplied with this Service Bulletin: ........................... 2 3
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 4 K. Publications Affected ........................................ 2 4 L. Interchangeability and Intermixability of Parts ........................... 2 4 M. Software Accomplishment Summary ................................ 2 4
2. MATERIAL INFORMATION ........................................ 2 5 A. Material - Price and Availability ................................... 2 5 B. Industry Support Information .................................... 2 5 C. Parts Necessary for Each Airplane ................................. 2 6
1. Kits/Parts ............................................ 2 6
2. Parts and Materials Supplied by the Operator ........................ 2 9
3. Parts Modified and Reidentified ................................ 2 9
4. Parts Removed and Not Replaced .............................. 2 9 D. Parts Necessary to Change Spares ................................. 2 9 E. Special Tooling - Price and Availability ............................... 2 9 F. Special Tooling Necessary to do this Service Bulletin ....................... 2 9
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 1 A. GENERAL INFORMATION ..................................... 3 1 B. WORK INSTRUCTIONS ....................................... 3 1 FIGURE 1: WIRE ROUTING FOR WIRE BUNDLE W2078 ........................ 3 6 FIGURE 2: WIRING CHANGE FOR WIRE BUNDLE W2078 [Group 1] ................. 4 2 FIGURE 3: WIRING CHANGE FOR WIRE BUNDLE W2078 [Group 2] ................. 4 5 FIGURE 4: WIRING CHANGE FOR WIRE BUNDLE W2078 [Group 3] ................. 4 8 FIGURE 5: WIRING CHANGE FOR WIRE BUNDLE W2078 [Group 4] ................. 5 1 FIGURE 6: WIRING CHANGE FOR WIRE BUNDLE W2078 [Group 6] ................. 5 4 FIGURE 7: WIRING CHANGE FOR WIRE BUNDLE W2078 [Group 7] ................. 5 7 FIGURE 8: WIRING CHANGE FOR WIRE BUNDLE W2078 [Group 5, 8] ................ 6 0 FIGURE 9: WIRE ROUTING FOR WIRE BUNDLE W1260 ........................ 6 3 FIGURE 10: WIRING CHANGE FOR WIRE BUNDLE W1260 [Group 1, 8] ................ 6 5 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 3 of 76 BOEING SERVICE BULLETIN 757-24-0132
FIGURE 11: WIRING CHANGE FOR WIRE BUNDLE W1260 [Group 2, 6] ................ 6 7 FIGURE 12: WIRING CHANGE FOR WIRE BUNDLE W1260 [Group 3] ................. 6 9 FIGURE 13: WIRING CHANGE FOR WIRE BUNDLE W1260 [Group 4, 7] ................ 7 1 FIGURE 14: WIRING CHANGE FOR WIRE BUNDLE W1260 [Group 5] ................. 7 3 FIGURE 15: INSTALLATION OF RELAY ON P36 PANEL ......................... 7 5 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 4 of 76 BOEING SERVICE BULLETIN 757-24-0132
Commercial Airplanes 757 Service Bulletin
SPECIAL ATTENTION Revision Transmittal SheetNumber: 757-24-0132Original Issue: April 14, 2011 Revision 1: June 19, 2012 ATA System: 2431 SUBJECT: ELECTRICAL POWER - Batteries - Change to the Battery Charger System Wiring for Extended Flight on Limited Standby Power This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION No more work is necessary on the airplane(s) changed in accordance with the original issue of this service bulletin.
REASON FOR REVISION As a part of a service bulletin validation program, this change was completed on airplane ND049 by Service Bulletin 757-24-0132 Original Issue before the release of Revision 1 of this service bulletin. The changes completed on airplane ND049 by Service Bulletin 757-24-0132 Original Issue is equivalent to the release of Revision 1 of this service bulletin. Airplane ND049 has the configuration of a Group 1 airplane.
The original issue of this service bulletin did not provide the split configurations for wires installed in the flight deck in TB111 terminal track. As a result, airplanes in Group 1, Group 2 and Group 4 were moved into new Group 8, Group 6 and Group 7 respectively and to provides the new changed instructions for those airplanes.
This revision is sent to change the original issue service bulletin to correct the groupings in the effectivity applicabilities of section 1.A as follows:
– Airplanes moved from Group 2 to Group 6:
NB561-NB561 – Airplanes moved from Group 4 to Group 7:
NA237-NA239 – Airplanes moved from Group 1 to Group 8:
NA585-NA586, NB148, NB161-NB162, NB168, NB221-NB228, NB230, NB236, NB294-NB299, NB301-NB302, NB431-NB438, NB446, NB453-NB454, NB511-NB523, NB571, NB581-NB583, NC058-NC062, NC068-NC084, NC091-NC094, NC151, NC161, NC936-NC950, ND111-ND113, ND189-ND199, ND224-ND225, ND244-ND248, ND301-ND322, ND401, NE006-NE008, NE091-NE094, NE301-NE302, NE311-NE325, NL001-NL002, NL006-NL017, NN001-NN002, NN051-NN052, NP901-NP904, NS601-NS616, NT001-NT009, NT201-NT202, NT231-NT234, NT237-NT240, NT242, NT245-NT248, NT281-NT289, NT341-NT347, NT351-NT360, NT371-NT373, NT375-NT379, NT381-NT386, NT401-NT409, NT411-NT412, NT426-NT427, NT431-NT432, NT436-NT438, NT441-NT442, NT446, NT701-NT769, NT791-NT796, NT861-NT862, NT881-NT885, NT901-NT916, NT971-NT985, NU031-NU038, NU701-NU705, NU721-NU728, NU731-NU732 These sections were changed:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 5 of 76
1. Summary Background: Clarified to include reference to wire changes.
2. Summary Action: Clarified to include reference to wire changes.
3. Summary Manpower:
– Added new hour table for new Group 6, Group 7 and Group 8.
– Included note regarding optional open/close access hours.
4. Paragraph 1.A. Effectivity: Defined new Group 6, Group 7 and Group 8 airplanes.
5. Paragraph 1.C. Reason: Added information about the changes made as a result of the service bulletin validation.
6. Paragraph 1.D. Description: Added data for Group 6, Group 7 and Group 8 airplanes.
7. Paragraph 1.G. Manpower: Added note for optional access hours and new tables for Group 6, Group 7 and Group 8 airplanes.
8. Paragraph 1.K. Publications Affected: Added 757 Flight Crew Operations Manual NNC 06.
9. Paragraph 2.A. Material: Changed price and available date(s) of top kits (remove this paragraph if top kit price does not change).
10. Paragraph 2.C. Parts Necessary for Each Airplane: Replaced existing wire subkit kit 280N3373-101 with new wire subkit 280N3372-104 that contains new parts and wires needed to complete the service bulletin.
11. Paragraph 3.A. General Information:
– Deleted existing Note 1.
– Renumbered existing Notes 2-5 to Notes 1-4.
– Added new Note 5.
12. Paragraph 3.B. Effectivity:
a. Divided work instructions into four parts:
– Part 1 - Open Access.
– Part 2 - Rework Instructions.
– Part 3 - Close Access.
– Part 4 - Test.
b. Changed functional test steps.
13. Figure 2 - Added new terminal block (if needed), wire, I.D. tape and splice.
14. Figure 3 - Added new terminal block (if needed), wire, I.D. tape and splice.
15. Figure 4 - Added new terminal block (if needed), wire, I.D. tape and splice.
16. Figure 5 - Added new terminal block (if needed), wire, I.D. tape and splice.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 6 of 76 BOEING SERVICE BULLETIN 757-24-0132
17. Figure 6:
– Moved existing Figure 6 to Figure 9.
– Limited new Figure 6 to Group 6 airplanes.
– Added new terminal block (if needed), wire, I.D. tape and splice.
18. Figure 7:
– Moved existing Figure 7 to Figure 10.
– Limited new Figure 7 to Group 7 airplanes.
– Added new terminal block (if needed), wire, I.D. tape and splice.
19. Figure 8:
– Moved existing Figure 8 to Figure 11.
– Limited new Figure 8 to Group 5 and Group 8 airplanes.
– Added new terminal block (if needed), wire, I.D. tape and splice.
20. Figure 9:
– Moved existing Figure 9 to Figure 12.
– Was old Figure 6.
21. Figure 10:
– Moved existing Figure 10 to Figure 13.
– Was old Figure 7.
– Limited new Figure 10 to Group 1 and Group 8 airplanes.
– Added Flag Note 9.
22. Figure 11:
– Moved existing Figure 11 to Figure 14.
– Was old Figure 8.
– Limited new Figure 11 to Group 2 and Group 6 airplanes.
– Added Flag Note 9.
23. Figure 12:
– Moved existing Figure 12 to Figure 15.
– Was old Figure 9.
– Limited new Figure 12 to Group 3 airplanes.
– Added Flag Note 9.
24. Figure 13:
– Was old Figure 10.
– Limited new Figure 13 to Group 4 and Group 7 airplanes.
– Added Flag Note 9.
25. Figure 14:
– Was old Figure 11.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 7 of 76 BOEING SERVICE BULLETIN 757-24-0132
– Limited new Figure 14 to Group 5 airplanes.
– Added Flag Note 9.
26. Figure 15: Was old Figure 12.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY April 14, 2011Original Issue:
June 19, 2012Revision 1:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 8 of 76 BOEING SERVICE BULLETIN 757-24-0132
Commercial Airplanes 757 Service Bulletin
SPECIAL ATTENTION SummaryNumber: 757-24-0132Original Issue: April 14, 2011 Revision 1: June 19, 2012 ATA System: 2431 SUBJECT: ELECTRICAL POWER - Batteries - Change to the Battery Charger System Wiring for Extended Flight on Limited Standby Power BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.
CONCURRENT REQUIREMENTS None.
BACKGROUND Accomplishment of this service bulletin will let the main battery charger stay powered when the right main AC bus is powered and when the standby power switch is set to the BAT position during flight. This will prevent discharge of the main battery. If this service bulletin is not done, the battery will discharge and could cause the airplane to lose battery power. This would result in the loss of airplane systems connected to the standby buses, and could affect flight and landing operations.
During the flight of a 757 airplane, the standby power OFF indication came on. The flight crew set the standby power switch to the BAT position and continued with the flight. The flight continued beyond the battery's capability to supply power to the standby loads and a number of system annunciations came on. The hot battery bus, battery bus, DC standby bus and AC standby bus had lost power. The pilots found that the horizontal stabilizer trim was not available and lateral control was affected. During landing, the inboard tires blew due to lack of inboard anti-skid. When the airplane stopped, the engines could not be powered off until the standby power switch was set back to the AUTO position and main generators were switched on to put back power to the battery charger, battery and the fuel shutoff valves. Some of these conditions would also be found on 767 airplanes.
This service bulletin gives instructions to change wiring and add a new air/ground relay to the battery charger system. This change will keep the main battery charger powered when right main AC power is available through the ground service bus and when the standby power switch is in the BAT position during flight. This will prevent discharge of the main battery.
Boeing Service Related Problem (SRP) 757-SRP-24-0135 is related to this service bulletin.
ACTION (PRR 54530-290RS) Do the wiring changes between the P5 overhead panel and P36 miscellaneous electronics equipment panel.
Get access to the P36 miscellaneous electronics equipment panel and install a new relay and wires. Do a test to make sure the change operates correctly.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 9 of 76
EFFECTIVITY 757-200/-200CB/-200PF/-300 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done within 60 months after the Revision 1 date of this service bulletin.
INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER Elapsed HoursTotal Task HoursAirplanes
12.9*22.5*Group 1 Airplanes
12.9*22.5*Group 2 Airplanes
12.9*22.5*Group 3 Airplanes
12.9*22.5*Group 4 Airplanes
12.9*22.5*Group 5 Airplanes
12.9*22.5*Group 6 Airplanes
12.9*22.5*Group 7 Airplanes
12.9*22.5*Group 8 Airplanes * Hours do not include optional open/close access steps.
MATERIAL INFORMATION Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 10 of 76 BOEING SERVICE BULLETIN 757-24-0132
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 11 of 76 BOEING SERVICE BULLETIN 757-24-0132
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: April 14, 2011 757-24-0132Revision 1: June 19, 2012 12 of 76 BOEING SERVICE BULLETIN 757-24-0132