TextOCR
This text is OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '5afc55d7f1bc1a9e6f842b12cba687d323f4d2715b4bf911e3569c44f22149a5' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '5afc55d7f1bc1a9e6f842b12cba687d323f4d2715b4bf911e3569c44f22149a5' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
(MASTER COPIED! SEF 5 1095 BOEING BOEING COMMERCIAL AIRPLANE COMPANY P.O. BOX 3707 SEATTLE, WASHINGTON 98124 757
REVISION TRANSMITTAL SHEET Boeing Service Bulletin 757-54-0003 This sheet transmits REVISION 1 dated August 30, 1985 of Service Bulletin 757-54-0003, NACELLES/PYLONS - UPPER LINK BACKUP STRUCTURE MODIFICATION".
NOTE: This revision constitutes a complete reissue.
SUMMARY This revision is issued to provide tooling information which may be helpful in accomplishing this bulletin. In addition, Notice of Status Change 757-54-0003NSC1 has been incorporated.
Airplanes modified per the previous release of this service bulletin do not require additional work.
A revision bar in the left margin along with this revision number and date indicates a change. Absence of a revision bar on a page bearing a 'revised' notice means only that existing copy has been moved or that a minor typographical error has been corrected.
REVISION HISTORY Original Issue: December 14, 1984 Revision 1: August 30, 1985
BOEING 757
BOEING COMMERCIAL AIRPLANE COMPANY SUBJECT: NACELLES/PYLONS - UPPER LINK
BACKUP STRUCTURE MODIFICATION
BACKGROUND
SERVICE BULLETIN
SUMMARY P.O. BOX 3707 SEATTLE, WASHINGTON 98124 ATA: 5451 NO: 757-54-0003 DATE: December 14, 1984 REVISION 1: August 30, 1985
EFFECTIVITY Fatigue tests and analysis at Boeing Line Numbers 2 through 30 and 32 show that cracks can occur in the through 34.
horizontal flanges of the nacelle strut upper link attachment fitting, MANPOWER mid-bulkhead where the fitting attaches, and the center chord Total Man-Hours - 142 vertical flange forward of the attachment. Elapsed Time - 27 Hours Crack progression in this area could MATERIAL INFORMATION affect the integrity of the upper link attachment and, consequently, the Kit Delivery Price fail-safe design of the strut-to-wing attachment. 012N8258-1 Available No Charge ACTION (PRR N53101) Prior to accumulation of 6000 flight cycles, modify the nacelle strut upper spar at the affected areas to prevent cracking.
See Paragraph I. F. for applicable terms and conditions.
CRACKS Modification consists of fastener LINK installation changes at the attachment FITTING ATTACHMENT - UPPER of the upper link attach fitting to LINK
STRUT UPPER the mid-bulkhead and replacement of a SPAR WEB stiffener on the lower side of the CRACK!
upper spar weo, just forward of the SPAR oulkhead, on the left and right struts. CENTER CHORD On the left strut only, replacement of a pulley bracket assembly is required to eliminate attachment of the assembly to the vertical flange of the LEFT STRUT SHOWN center chord. RIGHT STRUT OPPOSITE On both struts, replacement of the insulation blankets and replacement of one heat shield, and rework of the other, is required to accommodate the modification.
SECTION A-A Summary Page 1 of 1
BOEING BOEING COMMERCIAL AIRPLANE COMPANY P.O. BOX 3707 SEATTLE, WASHINGTON 98124
SERVICE BULLETIN ATA NO: 757-54-0003 SYSTEM: 5451 DATE: December 14, 1984 757 REVISION 1: August 30, 1985 SUBJECT: NACELLES/PYLONS - UPPER LINK BACKUP STRUCTURE MODIFICATION
PLANNING INFORMATION Effectivity
1. Airplanes Affected See Service Bulletin Index Part 3 for cross reference of Variable Number to Airplane Serial Number.
An equivalent change will be incorporated in production in accordance with PRR N53101 on applicable airplanes other than those listed below.
LISTING BY CUSTOMER CODE AND VARIABLE NUMBER BAB NA201-NA204 NA206-NA213 EAL NA002-NA016 INT NA205 NA214 MON NA401-NA403
LISTING BY VARIABLE NUMBER NA002-NA016 NA201-NA214 NA401-NA403
2. Spares Affected None Dec 14/84 757-54-0003 REV. 1: Aug 30/85 Page 1 of 11
BOEING SERVICE BULLETIN 757-54-0003 B. Reason Modification of the nacelle strut at and adjacent to the attachment of the upper link will reduce the possibility of fatigue cracks. Crack progression in this area could affect the integrity of the attachment of the upper link and, consequently, the fail-safe design of the strut-to-wing attachment.
During fatigue tests at Boeing, cracks were found in the upper link attach fitting horizontal flange and the upper horizontal flange of the mid-bulkhead. Several of the fasteners attaching the fitting to the bulkhead were fractured. A crack was also found at one of two fastener holes in the vertical flange of the left strut upper spar center chord where a thrust control pulley Analysis shows that the horizontal flange cracks and fractured fasteners resulted from clamp-up and cyclic stresses during flight. The cyclic stresses were accentuated by inadequate fit of the tension fasteners through the vertical flange of the attach fitting and the mid-bulkhead. The crack in the chord vertical flange at the pulley bracket fastener hole was caused by vertical bending load in the chord. The load initiates at a change in the chord axial load path and is insufficiently supported by the one-piece stiffener under the spar upper web forward of the mid-bulkhead.
Revision l is issued to provide tooling information which may be helpful in accomplishing this bulletin. In addition, Notice of Status Change 757-54-0003NSC1 has been incorporated.
C. Description Prior to accumulation of 6000 flight cycles, modify the fastener installation at the attach fitting for the upper link and replace a web stiffener forward of the fitting on the left and right nacelle struts.
On the left nacelle strut, also replace the thrust control system pulley bracket assembly with one that does not attach to the strut center chord vertical flange.
Oversizing the eight link fitting attach holes in the mid-bulkhead upper horizontal flange and installing bushings which protrude below the flange will prevent flange clamp-up from the attach bolts, Replacement of the two fasteners through the lower vertical flange of the link attach fitting and the mating flanges of the bulkhead with sleeve bolts will provide the necessary interference fit to accommodate the vertical loads in the fitting.
Dec 14/84 757-54-0003 REV. 1: Aug 30/85 2
BOEING SERVICE BULLETIN 757-54-0003 On the lower side of the upper spar web forward of the link attach fitting, replacement of the one-piece stiffener with a two-piece stiffener will minimize chord bending load.
On the left strut after replacement of the pulley bracket assembly, the two vacated assembly attach holes in the center chord vertical flange are filled with sleeve bolts.
On both struts, replacement of the stiffener requires replacement of the two insulation blankets and forward heat shield and rework NOTES: 1. Concurrent incorporation of Boeing Service Bulletin 757-54-2 is suggested on commonly affected airplanes in the interest of airplane down time savings.
2. Operators may find it convenient to use tool ME311N5178 to perform the above counterboring and oversizing operations.
Attached to this service bulletin is an Evaluation Form provided for the purpose of communicating information to the Boeing organization responsible for the service bulletin and its contents. The data you provide will be used to improve the Boeing Service Bulletin Program.
Please forward this form to your Boeing Field Service Representative or mail directly to:
Boeing Commercial Airplane Company P. 0. Box 3707 Seattle, Washington 98124 Attention: Manager, Service Bulletin Engineering Dec 14/84 757-54-0003 REV. 1: Aug 30/85 3
BOEING SERVICE BULLETIN 757-54-0003 D. ApprovaL This service bulletin has been reviewed by the Federal Aviation Administration (FAA) and the modifications herein comply with the applicable Federal Aviation Regulations (FAR's) and are FAA APPROVED.
E• Manpower Approximately 142 man-hours and a crew of 6 are required to accomplish this modification per airplane.
The following breakdown of manpower requirements is suggested as a guide to assist operators in planning and accomplishing this experienced crew. It does not include setup, lost time. modification. This estimate is for direct labor performed by an familiarization, cure time, tool acquisition, or Factor this estimate as necessary based on your own experience.
Elapsed Time Operation Crew Size Man-Hours (Hours) Access 48 8 Modification 4 40 10 Restoration and Operational Check 6 54 9 TOTAL PER AIRPLANE 142 27 Dec 14/84 757-54-0003
BOEING SERVICE BULLETIN 757-54-0003 Material - Price and Availability The kit identified in Paragraph II.A may be obtained from Boeing within the terms and conditions defined below. After expiration of the quotation, price and delivery data will be provided upon request.
The delivery quotation below indicates the date when initial kits will be available. When source capacity is limited and tooling or material availability is the pacing factor, operator purchase orders will receive an allocation from the available quantities based on receipt date of purchase order by the Spares Department and based on operator's planned modification schedules. Therefore, operators are requested to include planned dates of incorporation on their purchase order.
Kit Number Description Delivery Unit Price 012N8258-1 Kit Available No Charge Date December 14, 1984 The prices quoted are subject to the terms and conditions of Boeing's standard purchase order acknowledgement. Quotations are subject to acceptance within 120 days from date hereon. Prices quoted in United States Dollars. Terms: Net 30 days.
Items offered at "No Charge" are subject to charge after expiration of the 120-day period.
Address purchase orders and correspondence pertaining to quotation to Director of Spares, and refer to this service bulletin number.
G. Tooling - Price and Availability The tooling identified in Paragraph II.C may be rented from Boeing.
ddress correspondence pertaining to tools to Director of Spares, cefer to this service bulletin number, and provide the period of intended possession on your purchase order.
When source capacity is limited, tool allocation will be based on receipt date of purchase order and operator's planned modification schedule.
Kit Number Description Rent/Day Rent/Month ME311N5178 Kit Tool-Strut $237.00 (a) $2,368.00 (a) Fatigue Rework
(a) A $15.00 handling charge is applied to all rentals.
Operators may, at their option, fabricate their own tool to alleviate any constraints that may be caused by tool allocation. Therefore, tool drawing is being supplied in support of this service bulletin.
Dec 14/84 757-54-0003 REV. 1: Aug 30/85 5
BOEING SERVICE BULLETIN 757-54-0003 Weight and Balance Change in Change in Weight Moment (Pounds) (Pound-Inches) +4.0 +3107.0 References 1 • Existing Data:
a• Engineering Change Memo PRR 53101
b. 757 Maintenance Manual Subjects 06-43-00, 07-11-01, 29-11-00, 36-00-00, 36-11-15 and 54-51-02 C. Boeing Service Bulletin 757-54-2 "Nacelle/Pylon - Strut Access Door/Panel Attachment Modification.
2. Data supplied in support of this service bulletin:
Drawing No. Sheet DCN ADCN Title 012N8258 PL B 2*,3* Spar Installation - Upper Nacelle Strut 012N8258 1 1,2*,3* Spar Installation - Upper Nacelle Strut ME311N5178* 1 F Kit Tool - Strut Fatigue Rework Supplied in support of Revision l of this bulletin.
Process Data:
Boeing Process Specifications that are listed on drawings supplied in support of this service bulletin are not detailed in this service bulletin since they are common practices which can be accomplished in accordance with operator's normal procedures.
Publications Affected Publication Chapter/Section 757 Structural Repair Manual...... ... 54-50 Dec 14/84 757-54-0003 REV. 1: Aug 30/85
BOEING SERVICE BULLETIN 757-54-0003 II. MATERIAL INFORMATION A. Parts Required Per Airplane
1. The following kit may be obtained as noted in Paragraph I.F.
NOTE: Only one kit and operator furnished materials listed in Paragraph II.A.2 are required to modify each airplane.
012N8258 - KIT, SPAR INSTALLATION - UPPER NACELLE STRUT -1 Quantity Part Number Nomenclature 012N8258-1 Kit, Spar Installation - Upper Nacelle Strut 012N8258-2 (a) Kit
(a) Contains all parts shipped to operator. See drawing supplied with bulletin for contents of kit.
2. The following materials are to be furnished by the operator.
Part Number or Quantity Specification Nomenclature As Required BMS 10-11, Type I Primer As Required DC93-006 (a) Sealant
(a) Dow Corning Corp. (V71984) 3901 South Saginaw Road Midland, Michigan 48641 Parts Required to Modify Spares None C. Special Tools and Equipment Required The following tools may be obtained as noted in Paragraph I.G.
ME311N5178 "Kit Tool - Strut Fatigue Rework" D. Existing Parts Accountability None Dec 14/84 757-54-0003 REV. 1: Aug 30/85 7
BOEING SERVICE BULLETIN 757-54-0003
THIS PAGE INTENTIONALLY LEFT BLANK Dec 14/84 757~54~0003
BOEING SERVICE BULLETIN 757-54-0003 III. ACCOMPLISHMENT INSTRUCTIONS NOTE: The following paragraphs outline the general accomplishment instructions and test requirements. The suggested sequence of operations and detailed accomplishment instructions are indicated by circle notes on the figures.
A. Stabilize the airplane on jacks at wing and body Jack Points A, B, C and D per 757 Maintenance Manual Subject 07-11-01 to prevent movement during modification.
B• Support weight of engine and strut per 757 Maintenance Manual Subject 54-51-02 to remove all load from the upper link attachment to the strut. If engine is removed for any reason, support weight of strut.
C. Depressurize pneumatic system per 757 Maintenance Manual Subject 36-00-00 and install DO-NOT-OPERATE placards on all pneumatic system controls.
D. Depressurize the left and right hydraulic systems per 757 Maintenance Manual Subject 29-11-00.
E. Open all affected electrical circuit breakers on the Pll overhead panel and install DO-NOT-CLOSE placards.
or open access panels per 757 Maintenance Manual Subject 06-43-00 to obtain access to the upper and lower side of the strut upper spar web at and immediately forward of the upper link attachment to the strut.
At the upper side of the strut upper spar between Power Plant Stations 152 and 180, remove system cables and plumbing, as required, for access to the spar web.
In the same area below the spar web, remove the pneumatic system precooler and ducting, as required, per 757 Maintenance Manual Subject 36-11-15.
Modify the spar structure per Figure 1.
J. Upon completion of modification, reinstall the precooler and all ducting, plumbing and cables removed for access.
K. Remove engine or strut supports, lower airpiane and remove jacks, pressurize pneumatic and hydraulic systems, restore electrical power and check operation of affected systems.
L• Reinstall or close all access panels.
Dec 14/84 757-54-0003 REV. 1: Aug 30/85 9
BOEING SERVICE BULLETIN 757-54-0003 LINK
ATTACHMENT
FITTING - UPPER LINK
STRUT UPPER
SPAR WEB SPAR CENTER • STA CHORD 174.30
MID-BULKHEAD
•STA 00 OX 162.80
LEFT STRUT SHOWN
RIGHT STRUT OPPOSITE STA 162,80
STA OWDO SECTION A-A 174.30 FIGURE 1. ENGINE STRUT MODIFICATION Dec 14/84 757-54-0003 10