TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'f5b0d04ce35ad2ad36dfc7ee016dd3daac79bffd9e76a5f94dbf1e2b5ab19476' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'f5b0d04ce35ad2ad36dfc7ee016dd3daac79bffd9e76a5f94dbf1e2b5ab19476' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 767 Service Bulletin Number: 767-21-0235 Original Issue: October 08, 2009 Revision 1: July 29, 2011 ATA System: 2158 SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve Control Logic Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2009 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 1 of 56
2.0
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 2 of 56 BOEING SERVICE BULLETIN 767-21-0235
BLANK PAGE
Table of Contents
Revision Transmittal Sheet5
Summary7
1. PLANNING INFORMATION ........................................ 1 1 A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 2 B. Concurrent Requirements ...................................... 1 2 C. Reason ................................................ 1 2 D. Description .............................................. 1 3 E. Compliance .............................................. 1 3 F. Approval ............................................... 1 3 G. Manpower .............................................. 1 4 H. Weight and Balance Changes .................................... 1 5 I. Electrical Load Data ......................................... 1 5 J. References .............................................. 1 5
1. Existing Data .......................................... 1 5
2. Data supplied with this Service Bulletin ............................ 1 5
3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 1 6 K. Publications Affected ........................................ 1 6 L. Interchangeability and Intermixability of Parts ........................... 1 6
2. MATERIAL INFORMATION ........................................ 1 7 A. Material - Price and Availability ................................... 1 7 B. Industry Support Information .................................... 1 7 C. Parts Necessary For Each Airplane ................................. 1 8
1. Kits/Parts ............................................ 1 8
2. Parts and Materials Supplied by the Operator ........................ 1 9
3. Parts Modified and Reidentified ................................ 1 9
4. Parts Removed and Not Replaced .............................. 1 9 D. Parts Necessary to Change Spares ................................. 1 9 E. Special Tooling - Price and Availability ............................... 1 9 F. Special Tooling Necessary to do this Service Bulletin ....................... 1 9
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 1 A. GENERAL INFORMATION ..................................... 2 1 B. WORK INSTRUCTIONS ....................................... 2 1 FIGURE 1: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 - ROUTING [Group 1] ...................................... 3 1 FIGURE 2: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 - WIRING CHANGES [Group 1] ................................. 3 7 FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLES W0176 AND W0184 - ROUTING [Group 2-3] ............................. 3 9 FIGURE 4: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 - WIRING CHANGES [Group 2] ................................. 4 5 FIGURE 5: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0176 - WIRING CHANGES [Group 3] ................................. 4 7 FIGURE 6: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 - WIRING CHANGES [Group 2] ................................. 4 9
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 3 of 56 BOEING SERVICE BULLETIN 767-21-0235
FIGURE 7: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W0184 - WIRING CHANGES [Group 3] ................................. 5 1 FIGURE 8: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL NEW RELAY - INSTALLATION .................................................. 5 3
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 4 of 56 BOEING SERVICE BULLETIN 767-21-0235
Commercial Airplanes 767 Service Bulletin Revision Transmittal SheetNumber: 767-21-0235Original Issue: October 08, 2009 Revision 1: July 29, 2011 ATA System: 2158 SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve Control Logic Change This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION No more work is necessary on the airplane(s) changed in accordance with the original issue of this service bulletin.
REASON FOR REVISION This revision is sent to tell operators that when they do the change in the P36 left miscellaneous electrical equipment panel electrical power must be removed from the airplane.
These sections are changed:
1. Accomplishment Instructions:
a. Paragraph B., Work Instructions: A step is added to remove electrical power from the airplane.
b. Paragraph B., Work Instructions: A step is added to supply electrical power to the airplane.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY October 08, 2009Original Issue:
July 29, 2011Revision 1:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 5 of 56
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 6 of 56 BOEING SERVICE BULLETIN 767-21-0235
BLANK PAGE
Commercial Airplanes 767 Service Bulletin SummaryNumber: 767-21-0235Original Issue: October 08, 2009 Revision 1: July 29, 2011 ATA System: 2158 SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve Control Logic Change
CONCURRENT REQUIREMENTS None.
BACKGROUND This service bulletin gives instructions to install a relay and related wiring in the P36 panel to change the control logic for the equipment cooling 3-way valve on freighter airplanes. The logic is changed to make the 3-way valve close when the Electrical/Electronic (E/E) cooling system is put in STBY mode, when selected from the P5 overhead panel in the flight compartment. This will result in the continued supply of cooled air to the flight compartment avionic equipment. If this service bulletin is not done, a loss of air flow from the Air Conditioning (A/C) packs could occur and result in a loss of the displays in the flight compartment.
A 767-300F operator experienced an air turn-back event caused by the loss of one of the first officer’s primary displays and the loss of color on two of the captain’s primary displays. The display problems were followed by electrical burning smells in the flight compartment, which was found to be the result of an overheat condition from a decreased supply of cooling air to the avionic equipment in the flight compartment. The cause of the occurrence was found to be ice accumulation in the supply line orifice, which was sufficient in quantity to block the conditioned air flow to the flight compartment. The icing condition is found to start during ground operations in high humidity environments and when the cooling packs are selected to full cold. The packs cannot fully remove all moisture from the air in high humidity environments which subsequently causes small quantities of airborne ice crystals in the released air flow. After a period of time, the ice crystals cause frost to collect on the internal walls of the A/C ducts. If a large quantity of frost collects in the ducts and is not cleared, the frost becomes ice. The combination of one cooling pack in operation above freezing and the other cooling pack in operation below freezing, in humid environments, increases the amount of frost that can accumulate. To give continuous cooling to the flight compartment avionic equipment, Boeing has made changes to the control logic for the equipment cooling 3-way valve, which will give the pilots the option to select to have replacement cooling airflow supplied from the E/E cooling system, if the airflow from the A/C packs becomes unavailable or not sufficient.
The changes make the operation of the valve close when the E/E cooling system is put in the STBY mode when selected from the flight compartment.
Accomplishment of this service bulletin installs a relay in the lower section of the P36 Left Miscellaneous Electrical Equipment Panel, with related wiring changes to change the operation of the 3-way valve when the E/E cooling system is selected to the STBY mode from the flight compartment. This gives the pilots the option to choose an alternative supply of cooling airflow to prevent overheating of the avionic equipment in the flight compartment.
Boeing Service Related Problem (SRP) 767-SRP-21-0173 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 767 FTD 21-08002 and 767 FTD 21-08001 are related to this service bulletin.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 7 of 56
ACTION (PRR B12900-255) Group 1:
Get access and prepare the airplane to do work in the P36 Left Miscellaneous Electrical Equipment Panel in the Main Equipment Center (MEC). Add new wires and replace a wire in wire bundle W0176 and install a new relay in the lower section of the panel. Do a functional test of the system.
Group 2-3:
Get access and prepare the airplane to do work in the P36 Left Miscellaneous Electrical Equipment Panel in the Main Equipment Center (MEC). Add new wires and replace wires in wire bundles W0176 and W0184 and install a new relay in the lower section of the panel. Do a functional test of the system.
EFFECTIVITY 767-300F Airplanes. Refer to Paragraph 1.A., Effectivity for the list of affected airplanes.
COMPLIANCE No compliance time is given.
INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER Elapsed HoursTotal Task HoursAirplanes
4.957.60Group 1
6.859.50Group 2 and 3
MATERIAL INFORMATION Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 8 of 56 BOEING SERVICE BULLETIN 767-21-0235
BOEING SERVICE BULLETIN 767-21-0235 GROUP 1:
ADD WIRES AND REPLACE A WIRE IN WIRE BUNDLE W0176 IN THE P36 MISCELLANEOUS
ELECTRICAL EQUIPMENT PANEL. INSTALL A NEW RELAY
IN THE LOWER SECTION OF THE PANEL.
GROUP 2 AND 3:
ADD WIRES AND REPLACE
WIRES IN WIRE BUNDLES W0176 AND W0184 IN THE P36
MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL. INSTALL A
NEW RELAY IN THE LOWER SECTION OF THE PANEL.
MAIN EQUIPMENT CENTER (MEC) 1850353 (TYPICAL) Original Issue: October 08, 2009 Revision 1: July 29, 2011 767-21-0235
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 56
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 10 of 56 BOEING SERVICE BULLETIN 767-21-0235
BLANK PAGE
Commercial Airplanes 767 Service Bulletin Number: 767-21-0235 Original Issue: October 08, 2009 Revision 1: July 29, 2011 ATA System: 2158 SUBJECT: AIR CONDITIONING - Cooling - Freighter Equipment Cooling System 3-Way Valve Control Logic Change
1. PLANNING INFORMATION A. Effectivity
1. Airplanes This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRR B12900-255 for data about this change.
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP 767-300F airplanes, delivered with a General Market Freighter configuration, that have P36 panel wiring differences.
-1 767-300F airplanes, delivered with a Manual Freighter configuration, that have P36 panel wiring differences.
-2 767-300F airplanes, delivered with a Manual Freighter configuration, that have P36 panel wiring differences.
-3 Airplane Models:
767-300F GroupVariable Number 2VR201 - VR211 1VR251 1VR256 - VR260 1VT501 1VT511 - VT513
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 11 of 56
GroupVariable Number 1VT521 - VT523 1VT531 - VT533 3VW701 - VW721 1VW851
2. Spares Affected None.
B. Concurrent Requirements None.
C. Reason This service bulletin gives instructions to install a relay and related wiring in the P36 panel to change the control logic for the equipment cooling 3-way valve on freighter airplanes. The logic is changed to make the 3-way valve close when the Electrical/Electronic (E/E) cooling system is put in STBY mode, when selected from the P5 overhead panel in the flight compartment. This will result in the continued supply of cooled air to the flight compartment avionic equipment. If this service bulletin is not done, a loss of air flow from the Air Conditioning (A/C) packs could occur and result in a loss of the displays in the flight compartment.
A 767-300F operator experienced an air turn-back event caused by the loss of one of the first officer’s primary displays and the loss of color on two of the captain’s primary displays. The display problems were followed by electrical burning smells in the flight compartment, which was found to be the result of an overheat condition from a decreased supply of cooling air to the avionic equipment in the flight compartment. The cause of the occurrence was found to be ice accumulation in the supply line orifice, which was sufficient in quantity to block the conditioned air flow to the flight compartment. The icing condition is found to start during ground operations in high humidity environments and when the cooling packs are selected to full cold. The packs cannot fully remove all moisture from the air in high humidity environments which subsequently causes small quantities of airborne ice crystals in the released air flow. After a period of time, the ice crystals cause frost to collect on the internal walls of the A/C ducts.
If a large quantity of frost collects in the ducts and is not cleared, the frost becomes ice. The combination of one cooling pack in operation above freezing and the other cooling pack in operation below freezing, in humid environments, increases the amount of frost that can accumulate. To give continuous cooling to the flight compartment avionic equipment, Boeing has made changes to the control logic for the equipment cooling 3-way valve, which will give the pilots the option to select to have replacement cooling airflow supplied from the E/E cooling system, if the airflow from the A/C packs becomes unavailable or not sufficient. The changes make the operation of the valve close when the E/E cooling system is put in the STBY mode when selected from the flight compartment.
Accomplishment of this service bulletin installs a relay in the lower section of the P36 Left Miscellaneous Electrical Equipment Panel, with related wiring changes to change the operation of the 3-way valve when the E/E cooling system is selected to the STBY mode from the flight compartment. This gives the pilots the option to choose an alternative supply of cooling airflow to prevent overheating of the avionic equipment in the flight compartment.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: October 08, 2009 767-21-0235Revision 1: July 29, 2011 12 of 56 BOEING SERVICE BULLETIN 767-21-0235