Copy · U.S. DOT/FAA - SB-767-27-0201-00 · 18 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0095; AD 2013-25-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '9c2b7e6d05be9621163eb07b7a0cbe8c9276abd4f57827804ed2df878a688413'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 18

Commercial Airplane Group 767 Service Bulletin Number: 767-27-0201 Date: June 27, 2007 ATA System: 2731 SUBJECT: FLIGHT CONTROLS - Elevator - Repetitive Pogo Check

BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2007 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.

This document includes proprietary information owned by The Boeing Company and/or one or more third parties. Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, DC-8, DC-9, DC-10, MD-10, MD-11, MD-80, MD-88, MD-90, and the red-white-and-blue Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

BLANK PAGE June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 18 BOEING SERVICE BULLETIN 767-27-0201

BLANK PAGE

Table of Contents June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 18 BOEING SERVICE BULLETIN 767-27-0201

Table of Contents Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 E. Compliance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

2. Data supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . 13

3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . 13 K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . 13

2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 A. Material - Price and Availability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 C. Parts Necessary For Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

1. Kits/Parts: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

2. Parts and Materials Supplied by the Operator: . . . . . . . . . . . . . . . . . . . . . . 15

3. Parts Modified and Reidentified: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

4. Parts Removed and Not Replaced: . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 E. Special Tooling - Price and Availability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . 15

3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Table of Contents June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 18 BOEING SERVICE BULLETIN 767-27-0201

BLANK PAGE

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 18

Commercial Airplane Group 767 Service Bulletin Number: 767-27-0201 Summary Date: June 27, 2007 ATA System: 2731 SUBJECT: FLIGHT CONTROLS - Elevator - Repetitive Pogo Check

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND This service bulletin gives instructions to do repetitive pogo checks of the elevator Power Control Actuator (PCA) input rod assemblies. As an alternative to Boeing Alert Service Bulletin 767-27A0169, the incorporation of Boeing Service Bulletin 767-27-0187 to replace or rework elevator PCA bellcranks combined with the repetitive check of the elevator PCA input rod assemblies recommended in this service bulletin and the repetitive check ofthe elevator PCA rigging recommended in Boeing Service Bulletin 767-27-0203 will prevent continued operation with yielded or failed shear rivets in a bellcrank assembly for the elevator PCA and will also allow for longer inspection intervals. Operators are currently required by the Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2001-04-09 to do the 400 flight-hour repetitive check recommended in Boeing Alert Service Bulletin 767-27A0169.

One operator reported the left elevator drooping during a preflight check. Examination of the elevator control system found sheared rivets in the left-inboard and center PCA bellcrank assemblies. The elevator single hydraulic system check required by a Certification Maintenance Requirement (CMR) may not detect yielded or failed shear rivets in the bellcrank assemblies for the elevator PCA. As a result, the FAA issued AD 2000-17-05 to mandate the accomplishment of the actions specified in Boeing Alert Service Bulletin 767-27A0166, dated August 17, 2000.

Since the issuance of AD 2000-17-05, the FAA has received reports that several 767-200, 767-300, and 767- 300F airplanes failed the one-time functional check of the shear rivets required by the AD. As a result, the FAA issued AD 2001-04-09 to mandate the accomplishment of the actions specified in Boeing Alert Service Bulletin 767-27A0169, dated November 21, 2000.

A detailed design review found that the override device incorporated into the input rod assembly of the PCA provides protection against malfunctions and non-normal PCA operation. This design review also found that the shear rivets are not needed. The completion of Boeing Service Bulletin 767-27-0187 to replace or rework elevator PCA bellcranks combined with the repetitive check of the elevator PCA input rod assemblies recommended in this service bulletin and the repetitive check of the elevator PCA rigging recommended in Boeing Service Bulletin 767-27-0203 is an alternative to the 400 fllight-hour repetitive check recommended in Boeing Alert Service Bulletin 767-27A0169.

Boeing Service Related Problem (SRP) 767-SRP-27-0128 is related to this service bulletin.

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 18 BOEING SERVICE BULLETIN 767-27-0201

ACTION (PRR B12901-35S) Do a pogo check of the input rod assembly on each of the six elevator PCAs.

EFFECTIVITY 767-400ER airplanes. See Service Bulletin Paragraph 1.A.1 for effectivity.

COMPLIANCE The FAA will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

See Service Bulletin Paragraph 1.E. for compliance information.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this service bulletin.

MANPOWER

MATERIAL INFORMATION None.

Total Task Hours Elapsed Hours

32.0 16.0

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 18 BOEING SERVICE BULLETIN 767-27-0201

ELEVATOR PCA'S (LEFT SIDE SHOWN)

ASSEMBLY (TYPICAL)

DO POGO CHECK (6 LOCATIONS)

INPUT ROD FWD 479835

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 18 BOEING SERVICE BULLETIN 767-27-0201

BLANK PAGE

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 18

Commercial Airplane Group 767 Service Bulletin Number: 767-27-0201 Date: June 27, 2007 ATA System: 2731 SUBJECT: FLIGHT CONTROLS - Elevator - Repetitive Pogo Check

1. PLANNING INFORMATION A. Effectivity

1. Airplanes Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

This service bulletin is for the airplanes shown below. Refer to PRR B12901-35S for data about this change.

NOTE: This service bulletin is for the airplanes identified below. The effectivity list shown below is complete for airplanes through line number 878. Airplanes after line number 878 are also affected by this service bulletin. These airplanes will be added to the service bulletin’s MyBoeingFleet.com (MBF) "get effectivity" result when they are added to the MBF Fleet Profile Page.

Airplane models:

767-400ER

IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER

CONTINENTAL AIRLINES (CAL) 1 VQ071–VQ086

DELTA AIR LINES (DAL) 1 VQ001–VQ021

GROUP CONFIGURATION DESCRIPTION 1 - 767-400ER airplanes line numbers 1-901 require incorporation of SB 767-27-0187.

2 - 767-400ER airplanes line numbers 902 and on do not require SB 767-27-0187. Intent of SB 767-27-0187 was done in production for these airplanes.

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 18 BOEING SERVICE BULLETIN 767-27-0201

IDENTIFICATION BY VARIABLE NUMBER

2. Spares Affected None.

B. Concurrent Requirements The service bulletin listed below must be done before or at the same time as this service bulletin:

Group 2: None. The changes given in Boeing Service Bulletin 767-27-0187 were made on these airplanes before delivery.

C. Reason This service bulletin gives instructions to do repetitive pogo checks of the elevator Power Control Actuator (PCA) input rod assemblies. As an alternative to Boeing Alert Service Bulletin 767-27A0169, the incorporation of Boeing Service Bulletin 767-27-0187 to replace or rework elevator PCA bellcranks combined with the repetitive check of the elevator PCA input rod assemblies recommended in this service bulletin and the repetitive check ofthe elevator PCA rigging recommended in Boeing Service Bulletin 767-27-0203 will prevent continued operation with yielded or failed shear rivets in a bellcrank assembly for the elevator PCA and will also allow for longer inspection intervals. Operators are currently required by the Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2001-04- 09 to do the 400 flight-hour repetitive check recommended in Boeing Alert Service Bulletin 767- 27A0169.

One operator reported the left elevator drooping during a preflight check. Examination of the elevator control system found sheared rivets in the left-inboard and center PCA bellcrank assemblies. The elevator single hydraulic system check required by a Certification Maintenance Requirement (CMR) may not detect yielded or failed shear rivets in the bellcrank assemblies for the elevator PCA. As a result, the FAA issued AD 2000-17-05 to mandate the accomplishment of the actions specified in Boeing Alert Service Bulletin 767-27A0166, dated August 17, 2000.

Since the issuance of AD 2000-17-05, the FAA has received reports that several 767-200, 767-300, and 767-300F airplanes failed the one-time functional check of the shear rivets required by the AD.

As a result, the FAA issued AD 2001-04-09 to mandate the accomplishment of the actions specified in Boeing Alert Service Bulletin 767-27A0169, dated November 21, 2000.

Variable Group VQ001–VQ021 1 VQ071–VQ086 1 Group 1:

Company Service Bulletin Description Boeing 767-27-0187 Original Issue Elevator Power Control Actuator Bellcrank Replacement

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 18 BOEING SERVICE BULLETIN 767-27-0201

A detailed design review found that the override device incorporated into the input rod assembly of the PCA provides protection against malfunctions and non-normal PCA operation. This design review also found that the shear rivets are not needed. The completion of Boeing Service Bulletin 767-27- 0187 to replace or rework elevator PCA bellcranks combined with the repetitive check of the elevator PCA input rod assemblies recommended in this service bulletin and the repetitive check of the elevator PCA rigging recommended in Boeing Service Bulletin 767-27-0203 is an alternative to the 400 fllight-hour repetitive check recommended in Boeing Alert Service Bulletin 767-27A0169.

Boeing Service Related Problem (SRP) 767-SRP-27-0128 is related to this service bulletin.

D. Description Do a pogo check of the input rod assembly on each of the six elevator PCAs.

E. Compliance The FAA will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/ JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

Table 1: Check Operation of the Input Rod Assemblies of the Left and Right Elevator PCA Condition Action Compliance Time (Whichever Occurs Last) Repeat Interval (Not to Exceed) All Airplanes Do Elevator Pogo Check as given in Accomplishme nt Instructions

3.B.

Before 12,000 total flight hours since the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness Before 12,000 total flight hours since completion of the last pogo check Within 6,000 flight hours after the date on this service bulletin 12,000 flight hours

June 27, 2007 767-27-0201 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 18 BOEING SERVICE BULLETIN 767-27-0201

This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the action (i.e. inspection or modification) defined in this service bulletin combined with the actions defined in Boeing Service Bulletins 767-27-0187 and 767-27-0203 as an alternative method of compliance to the requirements of paragraph (a) of AD 2001-04-09. All provisions of AD 2001-04-09 that are not specifically referenced in the above statement remain fully applicable and must be complied with.

G. Manpower The table below shows an estimate of the task-hours necessary to do the pogo check for each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task-hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

— Time to adjust to the workplace — Time to schedule the work — Time to examine the work — Time to find the tools.

H. Weight and Balance Changes None.

I. Electrical Load Data Not changed.

Group 1-2:

Work Package Number Task Number of Persons Task-Hours Elapsed Hours 1 Remove input rod assemblies 2 1.5 0.75 Check input rod assemblies 2 12.0 6.0 Install input rod assemblies 2 1.5 0.75 Adjust input rod assemblies 2 1.0 0.5 TOTAL FOR WORK PACKAGE 1 (a) 16.0 8.0 2 Remove input rod assemblies 2 1.5 0.75 Check input rod assemblies 2 12.0 6.0 Install input rod assemblies 2 1.5 0.75 Adjust input rod assemblies 2 1.0 0.5 TOTAL FOR WORK PACKAGE 2 (a) 16.0 8.0 TOTAL FOR EACH AIRPLANE 32.0 16.0

(a) This is total time to do tasks for all 3 elevator PCAs

Pages 13–18 of 18