Copy · Boeing - Service Bulletin · 125 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0368; AD 2014-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '0a4bd23e2da7097b55ed39a2ded54d4932b24e556cf57d7fc34004073e24aa84'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 777 Service Bulletin Number: 777-24-0075 Original Issue: August 21, 2003 Revision 3: August 26, 2010 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches (Complete) Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2003 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.

This document includes proprietary information owned by The Boeing Company and/or one or more third parties.

Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 1 of 125

2.0

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 2 of 125 BOEING SERVICE BULLETIN 777-24-0075

BLANK PAGE

Table of Contents

Revision Transmittal Sheet5

Summary7

1. PLANNING INFORMATION ........................................ 1 1 A. Effectivity ............................................... 1 1

1. Airplanes ............................................ 1 1

2. Spares Affected ........................................ 1 3 B. Concurrent Requirements ...................................... 1 3 C. Reason ................................................ 1 6 D. Description .............................................. 1 7 E. Compliance .............................................. 1 9 F. Approval ............................................... 2 0 G. Manpower .............................................. 2 0 H. Weight and Balance Changes .................................... 2 2 I. Electrical Load Data ......................................... 2 2 J. References .............................................. 2 3

1. Existing Data: ......................................... 2 3

2. Data supplied with this Service Bulletin: ........................... 2 4

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 4 K. Publications Affected ........................................ 2 4 L. Interchangeability and Intermixability of Parts ........................... 2 5

2. MATERIAL INFORMATION ........................................ 2 7 A. Material - Price and Availability ................................... 2 7 B. Industry Support Information .................................... 2 8 C. Parts Necessary For Each Airplane ................................. 2 8

1. Kits/Parts: ........................................... 2 8

2. Parts and Materials Supplied by the Operator: ........................ 3 6

3. Parts Modified and Reidentified: ............................... 3 6

4. Parts Removed and Not Replaced: .............................. 3 6 D. Parts Necessary to Change Spares ................................. 3 6 E. Special Tooling - Price and Availability ............................... 3 6 F. Special Tooling Necessary to do this Service Bulletin ....................... 3 6

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 7 A. GENERAL INFORMATION ..................................... 3 7 B. WORK INSTRUCTIONS ....................................... 3 7 FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1 ....................... 5 3 FIGURE 2: CHANGE THE AIRPLANE WIRING - GROUP 2 ....................... 5 7 FIGURE 3: CHANGE THE AIRPLANE WIRING - GROUP 3 ....................... 6 2 FIGURE 4: CHANGE THE AIRPLANE WIRING - GROUP 4 ....................... 6 7 FIGURE 5: CHANGE THE AIRPLANE WIRING - GROUP 5 ....................... 7 2 FIGURE 6: CHANGE THE AIRPLANE WIRING - GROUP 6 ....................... 7 7 FIGURE 7: CHANGE THE AIRPLANE WIRING - GROUP 7 ....................... 8 2 FIGURE 8: CHANGE THE AIRPLANE WIRING - GROUP 8 ....................... 9 1 FIGURE 9: AIRPLANE WIRE ROUTING - ALL GROUPS ........................ 9 6 FIGURE 10: SUPPLEMENTAL AIRPLANE WIRE ROUTING - GROUPS 2 THRU 8 AND 10 ..... 1 0 2 FIGURE 11: P101 PANEL WIRE ROUTING - GROUP 6 ......................... 1 1 1

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 3 of 125 BOEING SERVICE BULLETIN 777-24-0075

FIGURE 12: P101 PANEL WIRE ROUTING - GROUP 7 ......................... 1 1 3 FIGURE 13: CHANGE THE AIRPLANE WIRING - GROUP 9 ...................... 1 1 5 FIGURE 14: CHANGE THE AIRPLANE WIRING - GROUP 10 ...................... 1 1 9 FIGURE 15: P101 PANEL WIRE ROUTING - GROUP 10 ........................ 1 2 4

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 4 of 125 BOEING SERVICE BULLETIN 777-24-0075

Commercial Airplanes 777 Service Bulletin Revision Transmittal SheetNumber: 777-24-0075Original Issue: August 21, 2003 Revision 3: August 26, 2010 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches (Complete) This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION No more work is necessary on airplanes changed in accordance with the original issue, Revision 1 or Revision 2 of this service bulletin.

REASON FOR REVISION This revision is sent to tell operators that airplanes WB614 and WB615 are moved from Group 6 to a new Group 10, to correct the configuration of the relay bracket in the P101 panel. Also, this revision adds the identification tapes in the figures.

Terminology has been changed in the Work Instructions to agree with the terminology defined in Paragraph

3.A., General Information - Notes.

These sections were changed:

1. In Summary, Compliance and Paragraph 1.E., Compliance, added Federal Aviation Administration (FAA) Airworthiness Directive (AD) data.

2. In Summary, Action and Paragraph 1.D., Description, added Group 10 data.

3. In Summary, Manpower, and paragraph 1.G., Manpower, added Group 10 manpower data.

4. In paragraph 1.B., Concurrent Requirements and Paragraph 3.B., Work Instructions, step 3, changed GE Aviation service bulletin data.

5. In Paragraph 1.D., Description, added Affected Maintenance Zones table.

6. In Paragraph 1.H., Weight and Balance Changes, added Group 10 data.

7. In Paragraph 1.J.1., Existing Data, added reference data.

8. In Paragraph 1.K., Publications Affected , added drawing data.

9. In Paragraph 2., Material - Price and Availability, added Group 10 data.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 5 of 125

10. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator, Parts and Materials Supplied by the Operator table, added identification tape data and notes (b) and (c).

11. In Paragraph 3.B., Work Instructions, step 2 and 4, added Group 10 data.

12. In Figures 1 thru 8 and 13, flag note table, added flag notes for identification tapes.

13. In Figures 9 and 10, step table, added strap part numbers.

14. In Figure 10:

a. Added Group 10 applicability.

b. Sheet 7, added the text "TYPICAL".

15. In Figures 11 and 12, step table, added note (a).

16. Added new Figures 14 and 15 to do wiring changes for Group 10 airplanes.

The data given in Information Notice 777-24-0075 IN 02 is included in this revision.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.

Pages with no vertical lines have no important changes.

REVISION HISTORY August 21, 2003Original Issue:

December 11, 2003Revision 1:

October 05, 2006Revision 2:

August 26, 2010Revision 3:

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 6 of 125 BOEING SERVICE BULLETIN 777-24-0075

Commercial Airplanes 777 Service Bulletin SummaryNumber: 777-24-0075Original Issue: August 21, 2003 Revision 3: August 26, 2010 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches (Complete)

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND The change described in this service bulletin will provide new switches on the flight deck than can remove power from the cabin systems if smoke or flames occur. Smoke and flames in the passenger cabin can cause injury to the passenger and damage the safety critical cabin equipments.

We have received numerous reports of smoke or flames in the passenger cabin related to the wiring for the passenger cabin in-flight entertainment system, cabin lighting and passenger seats. It is not easy to remove the electrical power to these systems to stop the smoke or flames.

Two switches can be installed to remove power from some of the passenger cabin electrical systems. When selected OFF, the IFE/PASS SEATS switch will remove power from all the components of the IFE (in-flight entertainment) system and the passenger seats (seat motor power, personal computer power outlets and telephones).

When selected OFF, the CABIN/UTILITY switch will remove power from all the galleys, the ground service bus (except the main and APU battery chargers and left forward fuel pump), the utility busses, the gasper air fan, the fluorescent cabin lighting and the beacon, wing and logo lights. While the switch is off, the nights lights, the supplemental nights lights, the reading lights, the attendant work lights and some of the galley and crew rest lights will be turned on.

Boeing Service Related Problem (SRP) 777-SRP-24-0091 is related to this service bulletin.

ACTION (PRR 61887) In the main equipment center, 15 new wires are routed from the P110 panel to the P210 panel. Three new wires are routed from the P210 panel to the P320 panel. One new wire is routed from the P110 panel aft and up to the P101 panel. For Group 6 and 10 airplanes only, one new relay and four new wires are installed in the P101 panel. For Group 7 airplanes only, two new relays and 10 new wires are installed in the P101 panel. The hardware and software is changed in the P110 panel, P210 panel and P320 panel as specified in the GE Aviation service bulletins. A test of the IFE/PASS SEATS and the CABIN UTILITY switches is done.

Refer to these GE Aviation service bulletins to determine specific applicability of the concurrent required GE Aviation service bulletins. Use the revision level of the dated service bulletins or a later FAA approved revision.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 7 of 125

Power PanelRevision and DateGE Aviation Service Bulletin Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-AAL Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-AAR Reference OnlyRev. 1, Dated February 23, 2004ELMS-24-AFA Reference OnlyRev. 1, Dated February 25, 2004ELMS-24-ANA Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-BAB Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-BEJ Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-CAL Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-CAT Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-DAL Reference OnlyRev. 1, Dated January 16, 2004ELMS-24-EAD Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-EGP Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-EIY Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-ELA Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-ILF Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-JAL Reference OnlyRev. 3, Dated May 23, 2005ELMS-24-JAS Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-KAL Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-KUW Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-LAL Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-MAS Reference OnlyRev. 0, Dated July 04, 2003ELMS-24-S160 Reference OnlyRev. 1, Dated February 23, 2004ELMS-24-SIA Reference OnlyRev. 1, Dated February 19, 2004ELMS-24-SVA Reference OnlyRev. 1, Dated May 24, 2004ELMS-24-SKL Reference OnlyRev. 1, Dated March 01, 2004ELMS-24-TII

EFFECTIVITY 777-200/300 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.

COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive (AD) related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 8 of 125 BOEING SERVICE BULLETIN 777-24-0075

Boeing recommends that this service bulletin be done within 60 months from the effective date of an applicable Airworthiness Directive.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.

MANPOWER Elapsed HoursTotal Task HoursAirplanes

17.034.0Groups 1 and 9

17.7535.5Group 2

17.535.0Group 3

17.535.0Group 4

17.2534.5Group 5

17.7535.5Groups 6 and 10

20.040.0Group 7

17.5035.0Group 8 The change to the P110, P210 and P320 panels as given in the GE Aviation service bulletins is not included.

Refer to the airplane specific service bulletins to get the man-hours necessary for each panel.

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 9 of 125 BOEING SERVICE BULLETIN 777-24-0075

Page 10OCROpen in PDF

BOEING SERVICE BULLETIN 777-24-0075 P101 PANEL CHANGE THE P210 RIGHT ROUTE THREE NEW WIRES GROUP 6 AND 10 AIRPLANES POWER MANAGEMENT PANEL FROM THE P210 PANEL TO -INSTALL ONE NEW RELAY AND HARDWARE AND SOFTWARE THE P320 PANEL

FOUR NEW WIRES ROUTE ONE GROUP 7 AIRPLANES E1/E2 RACK NEW WIRE -INSTALL TWO NEW RELAYS FROM THE AND 10 NEW WIRES P110 PANEL TO THE P101 PANEL SEE FWD K ROUTE 15 NEW WIRES FROM THE P110 PANEL TO THE P210 PANEL

MAIN EQUIPMENT CENTER ACCESS DOOR, 117AL

DO A TEST OF THE IFE/PASS SEATS

AND CABIN UTILITY SWITCHES CHANGE THE P320 GROUND

SERVICE HANDLING POWER PANEL HARDWARE AND CHANGE THE P110 LEFT

SOFTWARE POWER MANAGEMENT PANEL

FWD HARDWARE AND SOFTWARE

ELECTRICAL

BATTERY APU

IFE/PASS CABIN ON ON START MAIN EQUIPMENT CENTER

SEATS UTILITY ON ON

OFF OFF

ON FAULT OFF

L BUS TIE R BUS TIE

AUTO AUTO SEE

ISLN SECONDARY PRIMARY

EXT PWR EXT PWR R

GEN GEN

CTRL CTRL

BACKUP GEN OFF FWD OVERHEAD PANEL, P5

DRIVE DISC - FLIGHT COMPARTMENT W14812 Original Issue: August 21, 2003 Revision 3: August 26, 2010 777-24-0075

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 125

Commercial Airplanes 777 Service Bulletin Number: 777-24-0075 Original Issue: August 21, 2003 Revision 3: August 26, 2010 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches (Complete)

1. PLANNING INFORMATION A. Effectivity

1. Airplanes Refer to Service Bulletin Index Document D6-24W001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRR 61887 for data about this change.

DESCRIPTIONCONFIGURATIONGROUP 777-200/-300 airplanes with different wire changes using Top Kit 005W3198-3.

-1 777-200 airplanes with different wire changes using Top Kit 005W3198-6.

-2 777-200 airplanes with different wire changes using Top Kit 005W3198-7.

-3 777-200 airplanes with different wire changes using Top Kit 005W3198-8.

-4 777-200 airplanes with different wire changes using Top Kit 005W3198-9.

-5 777-200/-300 airplanes with different wire changes using Top Kit 005W3198-10.

-6 777-200 airplanes with different wire changes using Top Kit 005W3198-12.

-7 777-200 airplanes with different wire changes using Top Kit 005W3198-13.

-8

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 11 of 125

DESCRIPTIONCONFIGURATIONGROUP 777-200 airplanes with a different connector part number at D11042P.-9 777-300 airplanes with different wire changes using Top Kit 005W3198-10.

-10 Airplane Models:

777-200, 777-300 GroupVariable Number 1WA001 1WA101 - WA104 9WA210 - WA212 1WA221 - WA223 1WA231 - WA232 1WA241 - WA250 1WB016 - WB021 1WB031 - WB036 2WB037 - WB044 1WB105 - WB106 3WB133 - WB135 1WB151 - WB153 1WB161 - WB169 4WB170 - WB173 1WB181 - WB188 1WB231 - WB239 1WB271 - WB272 5WB276 - WB286 5WB291 - WB301 1WB306 - WB307 1WB311 - WB327 6WB336 - WB337 3WB366 - WB367 1WB371 - WB386 1WB406

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0075Revision 3: August 26, 2010 12 of 125 BOEING SERVICE BULLETIN 777-24-0075

Pages 13–24 of 125