Copy · U.S. DOT/FAA - SB-777-24-0077-R04 · 51 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0544; AD 2014-16-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'cde70e573fbf0162b311e99e9a23f10791fd249d2325a1cac3ab874e689368de'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 777 Service Bulletin Number: 777-24-0077 Original Issue: August 21, 2003 Revision 4: October 17, 2012 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2003 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management Company.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 1 of 51

2.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 2 of 51 BOEING SERVICE BULLETIN 777-24-0077

BLANK PAGE

Table of Contents

Revision Transmittal Sheet5

Summary7

1. PLANNING INFORMATION ........................................ 1 1 A. Effectivity ............................................... 1 1

1. Airplanes ............................................ 1 1

2. Spares Affected ........................................ 1 2 B. Concurrent Requirements ...................................... 1 2 C. Reason ................................................ 1 4 D. Description .............................................. 1 5 E. Compliance .............................................. 1 6 F. Approval ............................................... 1 7 G. Manpower .............................................. 1 7 H. Weight and Balance Changes .................................... 1 8 I. Electrical Load Data ......................................... 1 8 J. References .............................................. 1 9

1. Existing Data: ......................................... 1 9

2. Data Supplied with this Service Bulletin: ........................... 1 9

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 0 K. Publications Affected ........................................ 2 0 L. Interchangeability and Intermixability of Parts ........................... 2 0 M. Software Accomplishment Summary ................................ 2 0

2. MATERIAL INFORMATION ........................................ 2 1 A. Material - Price and Availability ................................... 2 1 B. Industry Support Information .................................... 2 1 C. Parts Necessary for Each Airplane ................................. 2 1

1. Kits/Parts: ........................................... 2 1

2. Parts and Materials Supplied by the Operator: ........................ 2 3

3. Parts Modified and Reidentified: ............................... 2 4

4. Parts Removed and Not Replaced: .............................. 2 5 D. Parts Necessary to Change Spares ................................. 2 5 E. Special Tooling - Price and Availability ............................... 2 5 F. Special Tooling Necessary to do this Service Bulletin ....................... 2 5

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 7 A. GENERAL INFORMATION ..................................... 2 7 B. WORK INSTRUCTIONS ....................................... 2 7 FIGURE 1: CHANGE THE AIRPLANE WIRING - GROUP 1 [Group 1, Configuration 1] ........ 4 0 FIGURE 2: FLIGHT DECK - AIRPLANE WIRE ROUTING [Group 1, Configuration 1] ......... 4 4 FIGURE 3: MAIN EQUIPMENT CENTER - AIRPLANE WIRE ROUTING [Group 1, Configuration 1] . 46 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 3 of 51 BOEING SERVICE BULLETIN 777-24-0077

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 4 of 51 BOEING SERVICE BULLETIN 777-24-0077

BLANK PAGE

Commercial Airplanes 777 Service Bulletin Revision Transmittal SheetNumber: 777-24-0077Original Issue: August 21, 2003 Revision 4: October 17, 2012 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION No more work is necessary on the airplanes changed in accordance with Revision 3 of this service bulletin.

REASON FOR REVISION This revision is sent to tell operators that GE Aviation Service Bulletin 4000ELM-24-435 has been revised, and to give data to change an Electrical Power Control Panel, part number 233W3202-9 to the new part number 233W3202-18.

These sections were changed:

1. In Paragraph 1.B., Concurrent Requirements, changed the GE Aviation service bulletin data.

2. In Summary, Background, Summary Manpower, Paragraph 1.C., Reason, Paragraph 1.G., Manpower and Paragraph 1.J.1., Existing Data, added BAE Systems SB 233W3202-24-03 reference.

3. In Paragraph 1.K., Publications Affected, changed the publications data.

4. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator:

a. Added an Electrical Power Control Panel part number.

b. Added a note.

5. In Paragraph 2.C.3., Parts Modified and Reidentified, added a table.

6. In Paragraph 3.B., Work Instructions:

a. Step 3, added a note.

b. Step 5, changed the GE Aviation service bulletin data.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.

Pages with no vertical lines have no important changes.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 5 of 51

REVISION HISTORY August 21, 2003Original Issue:

May 24, 2007Revision 1:

December 17, 2009Revision 2:

December 06, 2011Revision 3:

October 17, 2012Revision 4:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 6 of 51 BOEING SERVICE BULLETIN 777-24-0077

Commercial Airplanes 777 Service Bulletin SummaryNumber: 777-24-0077Original Issue: August 21, 2003 Revision 4: October 17, 2012 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND The change described in this service bulletin will provide new switches on the flight deck that can remove power from the cabin systems if smoke or flames occur.

We have received numerous reports of smoke or flames in the passenger cabin related to the wiring for the passenger cabin in-flight entertainment system, cabin lighting and passenger seats. It is not easy to remove the electrical power to these systems to stop the smoke or flames.

Two switches can be installed to remove power from some of the passenger cabin electrical systems. When selected OFF, the IFE/PASS SEATS switch will remove power from all the components of the IFE (in-flight entertainment) system and the passenger seats (seat motor power, personal computer power outlets and telephones).

When selected OFF, the CABIN/UTILITY switch will remove power from all the galleys, the ground service bus (except the main and APU battery chargers and left forward fuel pump), the utility busses, the gasper air fan, the fluorescent cabin lighting and the beacon, wing and logo lights. While the switch is off, the night lights, the supplemental night lights, the reading lights, the attendant work lights and some of the galley and crew rest lights will be turned on.

Boeing Service Related Problem (SRP) 777-SRP-24-0091 is related to this service bulletin.

BAE Systems SB 233W3202-24-03 Original Issue and BAE Systems SB 233W3202-24-04 Revision 2 are related to this service bulletin.

ACTION (PRR 61887) Group 1, Configuration 1:

On the P5 panel, replace the electrical power control panel. Install eight new wires and remove two wires between the P5 panel and the P61 overhead panel. Install 13 new wires between the P110 panel and the P210 panel.

Remove one wire between the P210 panel and the P101 panel. Install four new wires between the P210 panel and the P320 panel. Make the changes to the P110, P210 and P320 panels in accordance with the Smiths/GE Aviation service bulletins. Do a test of the passenger cabin systems, including the IFE/PASS SEATS switch.

Do a test of the CABIN UTILITY switch.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 7 of 51

Group 1, Configuration 2:

More work is necessary. In the flight compartment, get access to the electrical power control panel. Do an inspection on the electrical power control panel for the part number. If the electrical power control panel has the part number 233W3202-18, and does have lockwire provisions on the switch guards at switches S6 and S10, then change the part number to 233W3202-19. If the electrical power control panel has the part number 233W3202-19, and does not have lockwire provisions on the switch guards at switches S6 and S10, then change the part number to 233W3202-18.

EFFECTIVITY 777-200 Airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.

COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive (AD) related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that the change given in this service bulletin be done 60 months after the Revision 1 date of this service bulletin.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.

MANPOWER Group 1, Configuration 1:

Elapsed HoursTotal Task HoursAirplanes

13.5027.00777-200 Group 1, Configuration 1:

The time to make the change to the P110, P210 and P320 panels in accordance with the Smiths/GE Aviation Service Bulletins is not included.

Group 1, Configuration 1:

This estimate does not include the task hour data given in the Boeing service bulletins in Paragraph 1.B., Concurrent Requirements.

Group 1, Configuration 1:

The time to make the change to the electrical power control panel in accordance with the BAE Systems SB 233W3202-24-03 Original Issue and/or BAE Systems SB 233W3202-24-04 Revision 2 is not included.

Group 1, Configuration 2:

Elapsed HoursTotal Task HoursAirplanes

1.001.00More Work Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 8 of 51 BOEING SERVICE BULLETIN 777-24-0077

Page 9OCROpen in PDF

BOEING SERVICE BULLETIN 777-24-0077

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

SEE

• SEE D

MAIN EQUIPMENT CENTER ACCESS DOOR, 117AL CHANGE THE P210 RIGHT ROUTE FOUR NEW WIRES POWER MANAGEMENT PANEL FROM THE P210 PANEL TO HARDWARE AND SOFTWARE THE P320 PANEL E1/E2 RACK ROUTE 13 NEW WIRES FROM THE P110 PANEL TO THE P210 PANEL CHANGE THE P320 GROUND

SERVICE HANDLING POWER PANEL HARDWARE AND CHANGE THE P110 LEFT

SOFTWARE POWER MANAGEMENT PANEL FWD * HARDWARE AND SOFTWARE

MAIN EQUIPMENT CENTER W27991 Original Issue: August 21, 2003 Revision 4: October 17, 2012 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 777-24-0077 Work - See page 1 for details. 9 of 51

Page 10OCROpen in PDF

BOEING SERVICE BULLETIN 777-24-0077

DO A TEST OF THE

SEE D IFE/PASS SEATS AND

CABIN UTILITY SWITCHES

SEE (C ELECTRICAL

BATTERY APU ON

IFE/PASS CABIN ON OFF START

SEATS UTILITY OFF ON

OFF OFF APU GEN

ON FAULT OFF BUS TIE BUS 1IE

AUTO AUTO

FWD ISLN SECONDARY PRIMARY ISLN

EXT PWR EXT PWR OVERHEAD PANEL, P5 ON

FLIGHT COMPARTMENT AVAIL AVAIL

GEN GEN

CTRL CTRL

BACKUP GEN

OFF ON ON OFF

OFF OFF DRIVE

DRIVE DISC

REPLACE THE

ELECTRICAL POWER

CONTROL PANEL INSTALL 8 NEW WIRES AND REMOVE 2 WIRES BETWEEN THE P5 PANEL AND THE P61

OVERHEAD PANEL

•FWD W27984 Original Issue: August 21, 2003 Revision 4: October 17, 2012 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 777-24-0077 Work - See page 1 for details. 10 of 51

Commercial Airplanes 777 Service Bulletin Number: 777-24-0077 Original Issue: August 21, 2003 Revision 4: October 17, 2012 ATA System: 2400 SUBJECT: ELECTRICAL POWER - General - Install the Passenger Compartment Electrical Power Isolation Switches

1. PLANNING INFORMATION A. Effectivity

1. Airplanes Refer to Service Bulletin Index Document D6-24W001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRR 61887 for data about this change.

DESCRIPTIONCONFIGURATIONGROUP 777-200 Airplanes with classic core IFE interface.-1 777-200 Airplanes that have not accomplished BAE Systems Service Bulletin 233W3202-24-04 Original Issue or Revision 1.

1 777-200 Airplanes that have accomplished BAE Systems Service Bulletin 233W3202-24-04 Original Issue or Revision 1.

2 Airplane Models:

777-200 GroupVariable Number 1WA002 - WA017 1WA076 - WA080 1WA086 - WA093 1WA116 - WA119 1WA131 - WA137 1WA171 - WA175 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 11 of 51

GroupVariable Number 1WA196 - WA198 1WA206 - WA209 1WA261 - WA266 1WB001 - WB015 1WB051 - WB082 1WB101 - WB104 1WB121 - WB125 1WB131 - WB132

2. Spares Affected Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for the recommended use.

B. Concurrent Requirements Group 1, Configuration 1:

The service bulletins listed below must be done before or at the same time as this service bulletin:

Group 1, Configuration 1:

DescriptionService BulletinCompany Installs new OPS in the Cabin Area Control Panel (CACP) to change the operation of the cabin lighting system when the CABIN/UTILITY switch is installed.

777-23-0176 Original Issue thru Revision 2.

Boeing Changes the ELMS OPS and OPC software to decrease the number of ELMS P110 Panel, ELMS P210 Panel and ELMS P310 Panel EICAS status messages. (a) 777-24-0087 Original Issue thru Revision 2.

Boeing

(a) The changes in accordance with Boeing Service Bulletin 777-24-0087 can only be done at the same time as the changes in accordance with this service bulletin.

Group 1, Configuration 1:

The Smiths/GE Aviation Service Bulletins listed below must be done to complete the changes in accordance with this service bulletin.

Group 1, Configuration 1:

Description (Power Panel) Service BulletinCompany P3204000ELM-24-435 Revision 8, Dated March 26, 2012GE Aviation Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: August 21, 2003 777-24-0077Revision 4: October 17, 2012 12 of 51 BOEING SERVICE BULLETIN 777-24-0077

Pages 13–24 of 51