On this page
ADs that cite it · 1
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 1 proposed AD and 2 difficulty reports.
Text · 110
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2018-0801; AD 2019-08-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '7cf85120c1199e47ac6f6710f45ac8c2a101505767d875378743cbd83da89756' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '7cf85120c1199e47ac6f6710f45ac8c2a101505767d875378743cbd83da89756' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SB 601R- - - 57- - - 046 Page 1 of 1 Dec 20/2012
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET CL- - -600- - -2B19Canadair Regional Jet (CRJ) Aircraft SERVICE BULLETIN 601R - - -57 - - -046 SUBJECT : Wings - - - Center Wing Primary Structure - - - Cold Working of Fastener Holes in the Main Landing Gear (MLG) Trunnion Fitting This page transmits:
Revision C of Service Bulletin 601R- - - 57- - - 046, pages 1 thru 108, dated Dec 20/2012.
The changes in this revision have no effect on aircraft that have incorporated a previous issue of this service bulletin.
Reason:
Revised Accomplishment Instructions, paragraph 2., to:
Revise some steps.
This revision also includes small editorial changes that do not have an effect on the technical content.
Instructions:
Discard the copy of Service Bulletin 601R- - - 57- - - 046, Revision B, dated Aug 24/ 2012.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated Jul 17/2009.
Revision A, dated Dec 21/2009.
Revision B, dated Aug 24/2012.
SB 601R- - - 57- - - 046 Page 1 of 108 Jul 17/2009 Revision C, Dec 20/2012
SERVICE BULLETIN T echnical Publications THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED
HAS SOLD AIRCRAFT OR TRANSFERRED SPARES IN THE LAST SIX MONTHS, THIS SERVICE
BULLETIN MUST BE SENT TO THE NEW OWNER, UNLESS CONFIRMATION WAS RECEIVED
THAT BOMBARDIER REGIONAL AIRCRAFT DIVISION HAS INCLUDED THE NEW OPERATOR AIRCRAFT , THIS SERVICE BULLETIN MUST BE SENT TO THE LESSEE. IF THE OPERATOR ON THE DISTRIBUTION LIST .
ATA SYSTEM: 57- - -11 NUMBER: 601R - - -57- - -046 SUBJECT : Wings - - - Center Wing Primary Structure - - - Cold Working of Fastener Holes in the Main Landing Gear (MLG) Trunnion Fitting
1. PLANNING INFORMATION A. Effectivity Service Bulletin: CL- - - 600- - - 2B19 Canadair Regional Jet (CRJ) Aircraft Serial Numbers 7003 thru 7067, 7069 thru 7990 and 8000 thru 8106.
Production: This change will be incorporated before delivery on aircraft with serial number 8107 and subsequent serial numbers.
NOTE: The instructions in this service bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Service Bulletins. Before you do this service bulletin, examine all Supplemental Type Certificates (STCs), Supplemental Type Approvals (STAs) or equivalent changes to make sure you can complete this service bulletin.
NOTE: The procedure in this service bulletin was validated on Aircraft 7731.
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 2 of 108 Jul 17/2009 Revision C, Dec 20/2012 B. Reason
(1) Condition It is possible for cracks to start in the fastener holes of the lower flange of the the MLG trunnion.
(2) Evidence Engineering analysis has found that cracks can occur in the fastener holes of the lower flange of the MLG trunnion.
(3) Objective/Benefit This service bulletin gives the procedure to cold work the fastener holes in the MLG trunnion. Cold work of the fastener holes will increase the life of the MLG trunnion fitting.
C. Description This service bulletin is divided into seven parts: PART A, PART B, PART C, PART D, PART E, PART F and PART G.
For Aircraft 7003 - - -7010, 7013 - - -7067, 7069 - - -7990 and 8000 - - -8017 PART A - - - Cold Work of the Fastener Holes in the Left MLG Trunnion The MLG lockpins are installed. The electrical power is applied to the aircraft. The PCU safety tool is installed. The aircraft is put on jacks. The flaps are extended.
Electrical power is removed from the aircraft. Circuit breakers are opened.
Electrical harness is removed. An access panel is removed. MLG door is removed.
The fasteners are removed. The fastener holes are inspected, cold worked and new oversized fasteners are installed in the lower wing plank, in the MLG trunnion fitting and if necessary in the trunnion strap.
The access panel is installed. The electrical harness is installed. The PCU safety tool is removed. Circuit breakers are closed. The flaps are retracted. MLG door is installed. The aircraft is removed from jacks. The lockpins are removed from the MLG.
PART B - - - Cold Work of the Fastener Holes in the Right MLG Trunnion The MLG lockpins are installed. The electrical power is applied to the aircraft. The PCU safety tool is installed. The aircraft is put on jacks. The flaps are extended.
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 3 of 108 Jul 17/2009 Revision C, Dec 20/2012 Electrical power is removed from the aircraft. Circuit breakers are opened.
Electrical harness is removed. An access panel is removed. MLG door is removed.
The fasteners are removed. The fastener holes are inspected, cold worked and new oversized fasteners are installed in the lower wing plank, in the MLG trunnion fitting and if necessary in the trunnion strap.
The access panel is installed. The electrical harness is installed. The PCU safety tool is removed. Circuit breakers are closed. The flaps are retracted. MLG door is installed. The aircraft is removed from jacks. The lockpins are removed from the MLG.
For Aircraft 7011 and 7012 PART C - - - Cold Work of the Fastener Holes in the Left MLG Trunnion The MLG lockpins are installed. The electrical power is applied to the aircraft. The PCU safety tool is installed. The aircraft is put on jacks. The flaps are extended.
Electrical power is removed from the aircraft. Circuit breakers are opened.
Electrical harness is removed. An access panel is removed. MLG door is removed.
The fasteners are removed. The fastener holes are inspected, cold worked and new oversized fasteners are installed in the lower wing plank, in the MLG trunnion fitting and if necessary in the trunnion strap.
The access panel is installed. The electrical harness is installed. The PCU safety tool is removed. Circuit breakers are closed. The flaps are retracted. MLG door is installed. The aircraft is removed from jacks. The lockpins are removed from the MLG.
PART D - - - Cold Work of the Fastener Holes in the Right MLG Trunnion The MLG lockpins are installed. The electrical power is applied to the aircraft. The PCU safety tool is installed. The aircraft is put on jacks. The flaps are extended.
Electrical power is removed from the aircraft. Circuit breakers are opened.
Electrical harness is removed. An access panel is removed. MLG door is removed.
The fasteners are removed. The fastener holes are inspected, cold worked and new oversized fasteners are installed in the lower wing plank, in the MLG trunnion fitting and if necessary in the trunnion strap.
The access panel is installed. The electrical harness is installed. The PCU safety tool is removed. Circuit breakers are closed. The flaps are retracted. MLG door is installed. The aircraft is removed from jacks. The lockpins are removed from the MLG.
For Aircraft 8018 - - -8106 PART E - - - Cold Work of the Fastener Holes in the Left MLG Trunnion The MLG lockpins are installed. The electrical power is applied to the aircraft. The PCU safety tool is installed. The aircraft is put on jacks. The flaps are extended.
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 4 of 108 Jul 17/2009 Revision C, Dec 20/2012 Electrical power is removed from the aircraft. Circuit breakers are opened.
Electrical harness is removed. An access panel is removed. MLG door is removed.
The fasteners are removed. The fastener holes are inspected, cold worked and new oversized fasteners are installed in the lower wing plank, in the MLG trunnion fitting and if necessary in the trunnion strap.
The access panel is installed. The electrical harness is installed. The PCU safety tool is removed. Circuit breakers are closed. The flaps are retracted. MLG door is installed. The aircraft is removed from jacks. The lockpins are removed from the MLG.
PART F - - - Cold Work of the Fastener Holes in the Right MLG Trunnion The MLG lockpins are installed. The electrical power is applied to the aircraft. The PCU safety tool is installed. The aircraft is put on jacks. The flaps are extended.
Electrical power is removed from the aircraft. Circuit breakers are opened.
Electrical harness is removed. An access panel is removed. MLG door is removed.
The fasteners are removed. The fastener holes are inspected, cold worked and new oversized fasteners are installed in the lower wing plank, in the MLG trunnion fitting and if necessary in the trunnion strap.
The access panel is installed. The electrical harness is installed. The PCU safety tool is removed. Circuit breakers are closed. The flaps are retracted. MLG door is installed. The aircraft is removed from jacks. The lockpins are removed from the MLG.
For aircraft that have incorporated the initial issue or revision A of this service bulletin PART G - - - Identification of the Left and Right MLG Trunnion Lockpins are installed in the MLG. The left and right MLG trunnions are identified.
For all Aircraft D. Compliance Recommended Service Bulletin. Bombardier Aerospace recommends that PART A and PART B or PART C and PART D or PART E and PART F of this service bulletin be done before the aircraft have 34 900 flight cycles, unless otherwise directed by the airworthiness authority of the operator.
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 5 of 108 Jul 17/2009 Revision C, Dec 20/2012 For aircraft that have incorporated the initial issue or revision A of this service bulletin Recommended Service Bulletin. Bombardier Aerospace recommends that PART G of this service bulletin be done before the aircraft have 38 900 flight cycles, unless otherwise directed by the airworthiness authority of the operator.
NOTE: If the identification of the MLG trunnion was done with Service Bulletin 601R- - - 57- - - 047 or 601R- - - 57- - - 048, it is not necessary to do PART G of this service bulletin.
For all Aircraft This service bulletin affects Airworthiness Limitations (AWLs) and/or Damage T olerance Inspections (DTIs). Reference applicable Post/Pre Modsum TC601R17174 and/or Service Bulletin 601R- - - 57- - - 046 in the Maintenance Requirements Manual (MRM).
E. Approval The technical content of this service bulletin has been approved under the authority of the TCCA Design Approval Organization No: DAO #93- - -Q- - -02.
F. M a n p o w e r Man hours given below are estimates for direct labor done by an experienced crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
Administrative functions such as planning, liaison, familiarization, and report writing.
Non productive elapsed time such as rest time, having meals, and crew shift changes.
Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
Preparation for modification (unless specified in the accomplishment instructions) such as cleaning and getting parts, tools, consumables, and ground equipment.
Quality assurance inspections, troubleshooting and/or correction of discrepancies found when a task is done.
All other activities that are not considered by Bombardier Aerospace as directly related to the accomplishment of this procedure.
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 6 of 108 Jul 17/2009 Revision C, Dec 20/2012 NOTE: For on-site labor assistance, please speak with a Fleet Services representative for a quote. The Fleet Services Team can be contacted via the CRC at 514- - - 855- - - 8500 or email at thd.crj@aero.bombardier.com.
For PART A It will take an estimated 9.0 man-hours to complete PART A of this service bulletin.
The man- - - hours are divided as shown in the table that follows:
TASK MAN-HOURS ( 1 ) J o b S e t --- U p 2.0
(2) Procedure 5.0
(3) T est N/A
(4) Job Close- - -Out 2.0 For PART B It will take an estimated 9.0 man-hours to complete PART B of this service bulletin.
The man- - - hours are divided as shown in the table that follows:
TASK MAN-HOURS ( 1 ) J o b S e t --- U p 2.0
(2) Procedure 5.0
(3) T est N/A
(4) Job Close- - -Out 2.0
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 7 of 108 Jul 17/2009 Revision C, Dec 20/2012 For PART C It will take an estimated 5.0 ma-hours to complete PART C of this service bulletin.
The man- - - hours are divided as shown in the table that follows:
TASK MAN-HOURS ( 1 ) J o b S e t --- U p 1.0
(2) Procedure 3.0
(3) T est N/A
(4) Job Close- - -Out 1.0 For PART D It will take an estimated 5.0 man-hours to complete PART D of this service bulletin.
The man- - - hours are divided as shown in the table that follows:
TASK MAN-HOURS ( 1 ) J o b S e t --- U p 1.0
(2) Procedure 3.0
(3) T est N/A
(4) Job Close- - -Out 1.0 For PART E It will take an estimated 8.0 man-hours to complete PART E of this service bulletin.
The man- - - hours are divided as shown in the table that follows:
TASK MAN-HOURS ( 1 ) J o b S e t --- U p 2.0
(2) Procedure 4.0
(3) T est N/A
(4) Job Close- - -Out 2.0
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 8 of 108 Jul 17/2009 Revision C, Dec 20/2012 For PART F It will take an estimated 8.0 man-hours to complete PART F of this service bulletin.
The man- - - hours are divided as shown in the table that follows:
TASK MAN-HOURS ( 1 ) J o b S e t --- U p 2.0
(2) Procedure 4.0
(3) T est N/A
(4) Job Close- - -Out 2.0 For PART G It will take an estimated 0.25 man-hours to complete PART G of this service bulletin.
The man-hours are divided as shown in the table that follows:
TASK MAN-HOURS ( 1 ) J o b S e t --- U p 0.0
(2) Procedure 0.25
(3) T est 0.0
(4) Job Close- - -Out 0.0 G. Material - - - Price and Availability
(1) The kits in the table that follows are available from Bombardier Aerospace Regional Aircraft. Refer to the paragraph below for terms and conditions.
NOTE: For a list of the kit contents, refer to paragraph 3.A.
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 9 of 108 Jul 17/2009 Revision C, Dec 20/2012 For Aircraft 7003 - - -7010, 7013 - - -7067, 7069 - - -7990 and 8000 - - -8017 PART A
KIT NUMBER NAME 601R57- - - 046K1 Left MLG Trunnion Hardware PART B
KIT NUMBER NAME 601R57- - - 046K2 Right MLG Trunnion Hardware For Aircraft 7011 and 7012 PART C
KIT NUMBER NAME 601R57- - - 046K3 Left MLG Trunnion Hardware PART D
KIT NUMBER NAME 601R57- - - 046K4 Right MLG Trunnion Hardware For Aircraft 8018 - - -8106 PART E
KIT NUMBER NAME 601R57- - - 046K5 Left MLG Trunnion Hardware PART F
KIT NUMBER NAME 601R57- - - 046K6 Right MLG Trunnion Hardware
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 10 of 108 Jul 17/2009 Revision C, Dec 20/2012 For all Aircraft
(2) Please send a purchase order to the address below to schedule the kits:
Bombardier Customer Account Service T eam (CAST) - - - Kit Group 123 Garratt Blvd, N42- - - 24 Downsview, Ontario Canada M3K 1Y5 Fax: 416- - - 375- - - 3060 Phone: 416- - - 375- - - 3920 Email: sbkits@aero.bombardier.com
(3) Refer to paragraph 3.C. for a list of consumables for this service bulletin.
H. T ooling - - - Price and Availability
(1) The tool kit in the table that follows is available from Bombardier Aerospace Regional Aircraft. Refer to the paragraph below for the terms and conditions.
NOTE: For a list of the kit contents, refer to paragraph 3.A.
For PART A, PART B, PART C, PART D, PART E and PART F
KIT NUMBER NAME TERMS ANDCONDITIONS 601R57- - - 046K90 MLG Trunnion - - - Cold WorkT ools Refer toparagraph 1.H.(2).
601R57- - - 046K91 MLG Trunnion - - - Reamers Refer toparagraph 1.H.(2).
SBTOOL- - - 004K90 Hydraulic Powerpack Refer toparagraph 1.H.(2).
SBTOOL- - - 005K90 LB Puller Assy Refer toparagraph 1.H.(2).
SERVICE BULLETIN 601R- - -57- - -046 SB 601R- - - 57- - - 046 Page 11 of 108 Jul 17/2009 Revision C, Dec 20/2012
(2) Please send a purchase order to the address below to schedule the kits:
Bombardier Customer Account Service T eam (CAST) - - - Kit Group 123 Garratt Blvd, N42- - - 24 Downsview, Ontario Canada M3K 1Y5 Fax: 416- - - 375- - - 3060 Phone: 416- - - 375- - - 3920 Email: sbkits@aero.bombardier.com NOTE: When this service bulletin is completed, tooling kits SBTOOL- - - 004K90 and SBTOOL- - - 005K90 must be returned to the address below. Please contact the Customer Account Service T eam - - - Kit Group to get a Return Material Approval (RMA):
Bombardier - - - Chicago Warehouse Distribution 251- - - A Wille Road Des Plaines, Illinois USA 60018- - - 1817 I. Weight and Balance Not changed.
J. Electrical Load Data Not changed.
K. References Restriction and/or Special Instruction (RSI) C- - -A251, Revision C Modification Summary TC601R17174, Revision D Aircraft Maintenance Manual (AMM) Structural Repair Manual (SRM) Non Destructive T esting Manual (NDTM) Refer to the SB Introduction document for definition or explanation of Service Bulletin content.
For Bombardier Aerospace reference only: PCA 03993.
L. Other Publications Affected Aircraft Illustrated Parts Catalogue (AIPC) Maintenance Requirement Manual (MRM)