Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '003cd4cc3ccab724f96f828a433cdb52bfb2aa855c7453a4337c1d3e08a45e7a' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '003cd4cc3ccab724f96f828a433cdb52bfb2aa855c7453a4337c1d3e08a45e7a' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
the evolution of mobility SB 670BA- - - 25- - - 101 Page 1 of 1 Jan 12/2017
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET SERVICE BULLETIN 670BA - - -25 - - -101 SUBJECT : Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and Aft Lavatory This Page transmits:
Revision B of Service Bulletin 670BA- - - 25- - - 101, dated Jan 12/2017 For aircraft that have had the initial issue or Revision A of this service bulletin incorporated, it is necessary to refer to the Compliance p a r a g r a p h1 . D .o ft h i ss e r v i c eb u l l e t i n .
Reason:
Revised Planning Information, paragraph 1., to:
Change the Compliance Change a Reference Revised Accomplishment Instructions, paragraph 2., to:
Add the C&D Zodiac Service Bulletin Revision numbers in the Procedure sections.
This revision also includes small editorial changes that do not have an effect on the technical content.
Instructions:
Discard the copy of Service Bulletin 670BA- - - 25- - - 101 Revision A, dated Oct 31/2016.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated Dec 17/2015 Revision A, dated Oct 31/2016 1
the evolution of mobility SB 670BA- - - 25- - - 101 Page 1 of 32 Dec 17/2015 Revision B, Jan 12/2017
SERVICE BULLETIN T echnical Publications THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT BOMBARDIER HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION LIST .
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR ATA SYSTEM: 25- - -00 NUMBER: 670BA - - -25- - -101 SUBJECT : Equipment and Furnishings - - - General - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 1, Galley 2, Galley 4, Forward Lavatory and Aft Lavatory
1. PLANNING INFORMATION A. Effectivity
(1) Aircraft Affected:
AIRCRAFT MODEL
SERVICE AIRCRAFT
SERIAL NUMBERS
PRODUCTION
AIRCRAFT
SERIAL NUMBERS CL- - - 600- - - 2C1010001 thru 10344 [1] [1] CL- - - 600- - - 2D15 and CL- - - 600- - - 2D24 15001 thru 15382 [1] [1] CL- - - 600- - - 2E2519001 thru 19044 [1] [1] [1] Aircraft serial numbers 10345 and subsequent serial numbers, 15383 and subsequent serial numbers, and 19045 and subsequent serial numbers will have an equivalent modification incorporated before delivery.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 2 of 32 Dec 17/2015 Revision B, Jan 12/2017 NOTE: The instructions in this service bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier service bulletins. Before you do this service bulletin, examine all Supplemental Type Certificates (STCs) and Supplemental Type Approvals (STAs) or equivalent action changes to make sure you can complete this service bulletin.
B. Reason
(1) Condition It is possible for the un-insulated bonding jumper wire of the galleys and lavatories (lavs) to have an electrical short. This can cause an electrical fire in the aircraft.
(2) Evidence One in-service aircraft had this condition reported.
(3) Objective/Benefit This service bulletin gives the instruction to do the applicable C&D Zodiac Service Bulletin. This is to add a protective sleeve on the bonding jumper wires for the galleys and lavs. This is to protect the bonding jumper wire and prevent an electrical short.
C. Description This service bulletin is divided into six parts: PART A, PART B, PART C, PART D, PART E and PART F .
PART A - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 1 If necessary, the G1 galley is removed or the applicable galley equipment, doors and access panels are removed or opened. C&D Zodiac Service Bulletin 9327336- - - 25- - - 01 is done. If removed, the G1 galley is installed. The removed or opened access panels, doors and galley equipment are installed or closed.
PART B - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 2 If necessary, the G2 galley is removed, or the applicable galley equipment, doors and access panels are removed or opened. A detailed inspection is done to find if a bonding jumper is installed. If a bonding jumper is installed, C&D Zodiac Service Bulletin 9327336- - - 25- - - 02 is done. If removed, the G2 galley is installed. The removed or opened access panels, doors and galley equipment are installed or closed.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 3 of 32 Dec 17/2015 Revision B, Jan 12/2017 PART C - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 4 If necessary, the G4 galley is removed, or the applicable galley equipment, doors and access panels are removed or opened. A detailed inspection is done to find if a bonding jumper is installed. If a bonding jumper is installed, C&D Zodiac Service Bulletin 9327336- - - 25- - - 03 is done. If removed, the G4 galley is installed. The removed or opened access panels, doors and galley equipment are installed or closed.
PART D - - - Installation of a Protective Sleeve on the Bonding Jumper of the Forward Lavatory If necessary, the forward lav is removed, or the applicable access doors and access panels are removed or opened. C&D Zodiac Service Bulletin 9327336- - - 25- - - 04 is done. If removed, the forward lav is installed. The removed or opened access panels and access doors are installed or closed.
PART E - - - Installation of a Protective Sleeve on the Bonding Jumper of the Aft Lavatory If necessary, the aft lav is removed, or the applicable access doors and access panels are removed or opened. C&D Zodiac Service Bulletin 9327336- - - 25- - - 05 is done. If removed, the aft lav is installed. The removed or opened access panels and access doors are installed or closed.
PART F - - - Detailed Inspection for the Installation of a Protective Sleeve on the Bonding Jumper of the G1 galley, G2 galley, G4 galley, Forward Lavatory and Aft Lavatory The applicable access doors and access panels are removed or opened. For aircraft that have a G2 and/or a G4 galley installed, a detailed inspection is done to find if a bonding jumper is installed. A detailed inspection is done to find if a protective sleeve is installed on the bonding jumper for the monuments that follow:
--- G 1 g a l l e y,
- - - G2 galley if installed and if a bonding jumper is installed,
- - - G4 galley if installed and if a bonding jumper is installed,
- - - Forward lav if installed, --- A f t l a v.
If a protective sleeve is not installed on a bonding jumper, the applicable PART A and/or PART B and/or PART C and/or PART D and/or PART E of this service bulletin is done. The removed or opened access panels and access doors are installed or closed.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 4 of 32 Dec 17/2015 Revision B, Jan 12/2017 D. Compliance Recommended service bulletin.
For aircraft that have not had the initial issue or Revision A of this service bulletin incorporated For all aircraft B o m b a r d i e rr e c o m m e n d st h a tP A R TAo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e than 6600 flight hours or no later than 36 months from the initial release date of this service bulletin, whichever comes first, unless otherwise directed by the airworthiness authority of the operator.
For aircraft that have a G2 galley installed B o m b a r d i e rr e c o m m e n d st h a tP A R TBo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e than 6600 flight hours or no later than 36 months from the initial release date of this service bulletin, whichever comes first, unless otherwise directed by the airworthiness authority of the operator.
For aircraft that have a G4 galley installed B o m b a r d i e rr e c o m m e n d st h a tP A R TCo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e than 6600 flight hours or no later than 36 months from the initial release date of this service bulletin, whichever comes first, unless otherwise directed by the airworthiness authority of the operator.
For aircraft that have a forward lavatory installed B o m b a r d i e rr e c o m m e n d st h a tP A R TDo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e than 6600 flight hours or no later than 36 months from the initial release date of this service bulletin, whichever comes first, unless otherwise directed by the airworthiness authority of the operator.
For all aircraft B o m b a r d i e rr e c o m m e n d st h a tP A R TEo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e than 6600 flight hours or no later than 36 months from the initial release date of this service bulletin, whichever comes first, unless otherwise directed by the airworthiness authority of the operator.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 5 of 32 Dec 17/2015 Revision B, Jan 12/2017 For aircraft that have had the initial issue of this service bulletin incorporated AND For aircraft that have had Revision A of this service bulletin incorporated and did not use Revision 2 of C&D Zodiac Service Bulletins 9327336 - - -25 - - -01, 9327336 - - -25 - - -02, 9327336 - - -25 - - -03, and/or 9327336 - - -25 - - -05, and/or Revision 4 of C&D Zodiac Service Bulletin 9327336 - - -25 - - -04 B o m b a r d i e rr e c o m m e n d st h a tP A R TFo ft h i ss e r v i c eb u l l e t i nb ed o n ea tn om o r e than 6600 flight hours or no later than 36 months from the release date of Revision A of this service bulletin, whichever comes first, unless otherwise directed by the airworthiness authority of the operator:
During the detailed inspection done in PART F , Bombardier recommends that the applicable PART of this service bulletin be done as shown in the table below, unless otherwise directed by the airworthiness authority of the operator:
Monument/Result Action For all aircraft, if there is no protective sleeve on the bonding jumper of the G1 galley PART A must be done at no more than 6600 flight hours or no later than 36 months from the release date of Revision A of this service bulletin, whichever comes first.
F o ra i r c r a f tt h a th a v eaG 2g a l l e y installed with a bonding jumper, i ft h e r ei sn op r o t e c t i v es l e e v eo n the bonding jumper of the G2 galley PART B must be done at no more than 6600 flight hours or no later than 36 months from the release date of Revision A of this service bulletin, whichever comes first.
F o ra i r c r a f tt h a th a v eaG 4g a l l e y installed with a bonding jumper, i ft h e r ei sn op r o t e c t i v es l e e v eo n the bonding jumper of the G4 galley PART C must be done at no more than 6600 flight hours or no later than 36 months from the release date of Revision A of this service bulletin, whichever comes first.
For aircraft that have a forward lavatory installed, if there is no protective sleeve on the bonding jumper of the forward lavatory PART D must be done at no more than 6600 flight hours or no later than 36 months from the release date of Revision A of this service bulletin, whichever comes first.
For all aircraft, if there is no protective sleeve on the bonding jumper of the aft lavatory PART E must be done at no more than 6600 flight hours or no later than 36 months from the release date of Revision A of this service bulletin, whichever comes first.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 6 of 32 Dec 17/2015 Revision B, Jan 12/2017 For all aircraft NOTE: If it is not possible to complete all the instructions in this service bulletin because of the configuration of the aircraft, speak with a representative of Bombardier in the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or 1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com for analysis and to get an approved disposition to complete this service bulletin.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage T olerance Inspections (DTIs).
E. Approval The technical content of this service bulletin has been approved under the authority of the TCCA Design Approval Organization No: DAO #93- - -Q- - -02.
F. M a n p o w e r The man-hours given below are estimates for direct labor done by an experienced crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
- - - Administrative functions such as planning, liaising, familiarization, and report writing.
- - - Non-productive elapsed time such as rest time, having meals, and crew shift changes.
- - - Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
- - -Preparation for modification (unless specified in the Accomplishment Instructions) such as cleaning and getting parts, tools, consumables, and ground equipment.
- - -Quality assurance inspections, troubleshooting and/or correction of discrepancies found when a task is done.
- - -All other activities that are not considered by Bombardier as directly related to the accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services representative for an estimate. Call the Fleet Services Team through the CRC at 1- - - 844- - - 272- - - 2720 (1- - - 844- - - CRC - - - CRC0) or 1- - - 514- - - 855- - - 8500 or e-mail at thd.crj@aero.bombardier.com.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 7 of 32 Dec 17/2015 Revision B, Jan 12/2017
FOR PART A It will take an estimated 1.5 man-hours to complete PART A of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75 NOTE: These estimates do not include the man-hours necessary to remove and install the G1 galley.
NOTE: These estimates do not include the man-hours necessary to do C&D Zodiac Service Bulletin 9327336- - - 25- - - 01.
FOR PART B It will take an estimated 1.5 man-hours to complete PART B of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75 NOTE: These estimates do not include the man-hours necessary to remove and install the G2 galley.
NOTE: These estimates do not include the man-hours necessary to do C&D Zodiac Service Bulletin 9327336- - - 25- - - 02.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 8 of 32 Dec 17/2015 Revision B, Jan 12/2017
FOR PART C It will take an estimated 1.5 man-hours to complete PART C of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75 NOTE: These estimates do not include the man-hours necessary to remove and install the G4 galley.
NOTE: These estimates do not include the man-hours necessary to do C&D Zodiac Service Bulletin 9327336- - - 25- - - 03.
FOR PART D It will take an estimated 1.5 man-hours to complete PART D of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75 NOTE: These estimates do not include the man-hours necessary to remove and install the forward lav.
NOTE: These estimates do not include the man-hours necessary to do C&D Zodiac Service Bulletin 9327336- - - 25- - - 04.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 9 of 32 Dec 17/2015 Revision B, Jan 12/2017
FOR PART E It will take an estimated 1.5 man-hours to complete PART E of this service bulletin.
The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure N/A
(3) T est N/A
(4) Job Close-Out 0.75 NOTE: These estimates do not include the man-hours necessary to remove and install the aft lav.
NOTE: These estimates do not include the man-hours necessary to do C&D Zodiac Service Bulletin 9327336- - - 25- - - 05.
FOR PART F It will take an estimated 1.75 man-hours for each monument to complete PART F of this service bulletin The man-hours are divided in the table that follows:
TASK MAN-HOURS
(1) Job Set-Up 0.75
(2) Procedure 0.25
(3) T est N/A
(4) Job Close-Out 0.75 G. Material - - - Price and Availability Refer to paragraph 3.B. and to C&D Zodiac Service Bulletins 9327336- - - 25- - - 01, 9327336- - - 25- - - 02, 9327336- - - 25- - - 03, 9327336- - - 25- - - 04 and 9327336- - - 25- - - 05 for a list of consumables for this service bulletin.
H. T ooling - - - Price and Availability Refer paragraph 3.C. and to C&D Zodiac Service Bulletins 9327336- - - 25- - - 01, 9327336- - - 25- - - 02, 9327336- - - 25- - - 03, 9327336- - - 25- - - 04, and 9327336- - - 25- - - 05 for a list of special tools and equipment for this service bulletin.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 10 of 32 Dec 17/2015 Revision B, Jan 12/2017 I. Weight and Balance Not changed.
J. Electrical Load Data Not changed.
K. References Refer to the SB Introduction document for definition or explanation of service bulletin content.
Restriction and/or Special Instruction (RSI) C- - -25- - -1712- - -00, Revision C Modification Summary 670T014674, Revision A Modification Summary 670T014850, Revision A C&D Zodiac Service Bulletin 9327336- - - 25- - - 01, Revision 2 dated Sep13/16 C&D Zodiac Service Bulletin 9327336- - - 25- - - 02, Revision 2 dated Sep13/16 C&D Zodiac Service Bulletin 9327336- - - 25- - - 03, Revision 2 dated Sep13/16 C&D Zodiac Service Bulletin 9327336- - - 25- - - 04, Revision 4 dated Sep13/16 C&D Zodiac Service Bulletin 9327336- - - 25- - - 05, Revision 2 dated Sep13/16 Aircraft Maintenance Manual (AMM) For Bombardier reference only: PCA 76217 L. Other Publications Affected Aircraft Illustrated Parts Catalogue (AIPC) M. Relationship Chart Not applicable.
SERVICE BULLETIN 670BA- - -25- - -101 SB 670BA- - - 25- - - 101 Page 11 of 32 Dec 17/2015 Revision B, Jan 12/2017
2. ACCOMPLISHMENT INSTRUCTIONS PART A - - - Installation of a Protective Sleeve on the Bonding Jumper of the Galley 1 Reference Information
REFERENCE DESIGNATION A M M 1 2 --- 0 0 --- 0 0 --- 8 6 7 --- 8 0 1Standard Aircraft Configuration for Maintenance A M M 2 4 --- 0 0 --- 0 0 --- 9 1 0 --- 8 0 1Electrical/Electronic Safety Precautions A M M 2 5 --- 3 1 --- 0 1 --- 0 0 0 --- 8 0 2 Removal of the Galley 1 A M M 2 5 --- 3 1 --- 0 1 --- 4 0 0 --- 8 0 2 Installation of the Galley 1 A. Job Set-Up NOTE: The steps in the Job Set-Up section of this service bulletin are recommended steps. The steps give a recommendation to get access to the work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance (refer to AMM 12- - - 00- - - 00- - - 867- - - 801).
(2) Obey all the electrical/electronic safety precautions (refer to AMM 24- - - 00- - - 00- - - 910- - - 801).
(3) If necessary, remove the G1 galley (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).
(4) If the G1 galley is not removed, do the steps that follow:
(a) Open and tag the circuit breakers (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).
(b) Remove or open the applicable galley equipment, doors and access panels (refer to AMM 25- - - 31- - - 01- - - 000- - - 802).