Copy · 670BA-32-062A · 33 pages

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0885; AD 2022-21-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '7b4fcd079ca3a1182f04144a96ed84a4dd1d603e856ff58dc809fd24d958b2c6'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SB 670BA−32−062 Page 1 of 2 Dec 02/2021

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET SERVICE BULLETIN 670BA−32−062 SUBJECT: Landing Gear − Landing Gear System, General − Inspection of Landing Gear Component(s) Maintenance Documentation and, if required, removal of affected component(s) from service for overhaul These Pages transmit:

Revision A of Service Bulletin 670BA−32−062, dated Dec 02/2021 and Initial issue of Appendix A, dated Dec 02/2021.

The changes in this revision have no effect on aircraft that have had this service bulletin incorporated.

Reason:

Revised Planning Information, paragraph 1., to:

Give more information and add notes in the Reason section.

Divide the existing PART B (removal, restoration and installation of the components) into separate PARTS for the removal, the restoration and the installation of the NLG, the left MLG and the right MLG to agree with Transport Canada Airworthiness Directive (AD). The AD will only mandate the removal and installation of the affected components.

Move the Component Calendar Age from the Procedure section to the Compliance section.

Change the contact information of the Customer Response Center (CRC) Support Team.

Revised Accomplishment Instructions, paragraph 2., to:

Remove some notes that are not applicable to the Job set−Up and Close−Out sections.

Changed the title of PART B from /quoteblleftRemoval of the Landing gear Component for Overhaul" to /quoteblleftRemoval of the NLG Component(s) from the Aircraft.

Add PART C −Overhaul of the NLG Component(s) Add PART D − Installation of Serviceable NLG Component(s) on the Aircraft Add PART E − Removal of the Left MLG Component(s) from the Aircraft

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 2 of 2 Dec 02/2021 Add PART F −Overhaul of the Left MLG Component(s) Add PART G −Installation of Serviceable Left MLG Component(s) on the Aircraft Add PART H − Removal of the Right MLG Component(s) from the Aircraft Add PART I −Overhaul of the right MLG Component(s) Add PART J − Installation of Serviceable Right MLG Component(s) on the Aircraft Change the contact information of the Customer Response Center (CRC) Support Team.

Add Appendix A to:

Facilitate component tracking.

This revision also includes small editorial changes that do not have an effect on the technical content.

Instructions:

Discard the copy of Service Bulletin 670BA−32−062, dated Dec 14/2020. Replace with the copy attached.

Service Bulletin History:

Initial issue, dated Dec 14/ 2020 1

SB 670BA−32−062 Page 1 of 29 Dec 14/2020 Revision A, Dec 02/2021

SERVICE BULLETIN Technical Publications THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,

TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW

OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT MHIRJ HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION LIST .

SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR ATA SYSTEM: 32−00 NUMBER: 670BA−32−062 SUBJECT: Landing Gear − Landing Gear System, General − Inspection of Landing Gear Component(s) Maintenance Documentation and, if Required, Removal of Affected Component(s) from Service for Overhaul

1. PLANNING INFORMATION A. Effectivity

(1) Aircraft Affected:

AIRCRAFT MODEL

SERVICE AIRCRAFT

SERIAL NUMBERS

PRODUCTION

AIRCRAFT

SERIAL NUMBERS CL−600−2C10 and/or CL−600−2C11 10002 thru 10999. [1] CL−600−2D15 and/or CL−600−2D24 15001 thru 15990. [1] CL−600−2E25 19001 thru 19990. [1] [1] There is no production effectivity.

(2) Spares Affected:

SPARES: Examine all NLG and MLG spare components and dothe procedures in this service bulletin.

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 2 of 29 Dec 14/2020 Revision A, Dec 02/2021 NOTE: The instructions in this service bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by MHIRJ service bulletins. Before you do this service bulletin, examine all Supplemental Type Certificates (STCs) and Supplemental Type Approvals (STAs) or equivalent action changes to make sure you can complete this service bulletin.

B. Reason

(1) Condition The Maintenance Requirements Manual (MRM) Part 1, specifies that the Nose Landing Gear (NLG) and the Main Landing Gear (MLG) must be overhauled each 20,000 flight cycles. The MRM does not specify a calendar cap to perform the overhaul of these components.

(2) Evidence None

(3) Objective/Benefit This service bulletin gives the procedure to inspect all of the NLG and the MLG component maintenance documents and, if necessary, to remove the landing gear components for restoration (overhaul) and to install serviceable part(s) before return into service. The removal of the affected component must be done to comply with the phase−in schedule time line depending on the landing gear age since Entry Into Service (EIS) or since last overhaul.

NOTE: Aircraft that follow the Low Utilization Maintenance Program (LUMP) have a 120 month calendar cap. This service bulletin is recommended to make sure that this calendar cap limit is maintained NOTE: This service bulletin is recommended for all operators, including LUMP operators.

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 3 of 29 Dec 14/2020 Revision A, Dec 02/2021 C. Description This service bulletin is divided into ten parts: PART A, PART B, PART C, PART D, PART E, PART F , PART G, PART H, PART I, and PART J.

PART A − Inspection of the NLG and the MLG Component Maintenance Documents.

The component maintenance documents of the NLG and the MLG installed on the aircraft and all the NLG and the MLG spare components are inspected to determine the component calendar age.

Appendix A is added to facilitate component tracking as reference only.

PART B − Removal of the NLG Component(s) from the Aircraft If the inspection of the NLG component maintenance documents (PART A) identifies that the components that follow must be overhauled, then the affected NLG component(s) is/are removed from the aircraft and tagged unserviceable.

−NLG Assembly −NLG Drag Brace −NLG Door Drive Link −NLG Retract Actuator −NLG Manual Release Actuator −NLG Steering Actuator PART C −Overhaul of the NLG Component(s) If necessary, an overhaul (restoration) of the affected NLG component(s) is/are done per the AMM and MRB tasks.

PART D − Installation of Serviceable NLG Component(s) on the Aircraft If necessary, serviceable NLG component(s) are installed on the aircraft per the AMM and MRB tasks.

PART E − Removal of the Left MLG Component(s) from the Aircraft If the inspection of the left MLG component maintenance documents (PART A) identifies that the components that follow must be overhauled, then the affected left MLG component(s) is/are removed from the aircraft and tagged unserviceable.

−MLG Assembly −MLG Side Stay −MLG Shimmy Damper −MLG Retract Actuator

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 4 of 29 Dec 14/2020 Revision A, Dec 02/2021 PART F −Overhaul of the Left MLG Component(s) If necessary, an overhaul (restoration) of the affected left MLG component(s) is/are done per the AMM and MRB tasks.

PART G −Installation of Serviceable Left MLG Component(s) on the Aircraft If necessary, serviceable left MLG component(s) are installed on the aircraft.

PART H − Removal of the Right MLG Component(s) from the Aircraft If the inspection of the right MLG component maintenance documents (PART A) identifies that the components that follow must be overhauled, then the affected right MLG component(s) is/are removed from the aircraft and tagged unserviceable.

−MLG Assembly −MLG Side Stay −MLG Shimmy Damper −MLG Retract Actuator PART I −Overhaul of the right MLG Component(s) If necessary, an overhaul (restoration) of the affected right MLG component(s) is/are done per the AMM and MRB tasks.

PART J − Installation of Serviceable Right MLG Component(s) on the Aircraft If necessary, serviceable right MLG component(s) are installed on the aircraft.

D. Compliance Recommended service bulletin.

PART A − Inspection of the NLG and the MLG Component Maintenance Documents.

MHIRJ recommends that PART A of this service bulletin be done at no more than three months from the release date of this service bulletin. Refer to the component calendar age that follows to find out if some components on the NLG and the MLG must be scheduled for an overhaul, unless otherwise directed by the airworthiness authority of the operator.

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 5 of 29 Dec 14/2020 Revision A, Dec 02/2021 Component Calendar Age If the component calendar age since EIS (without overhaul) or since last overhaul is:

NOTE: The component’s calendar age is the calendar time since the aircraft Certificate of Airworthiness (C of A) date (for components initially installed on aircraft at time of delivery from the production line) or since the component’s manufacturing date or since the component’s overhaul date.

The storage time of a new or an overhauled component can be subtracted from the components age if the operator has correct documentation and that the component was stored per the manufacturer’s Component Maintenance Manual (CMM) and that the component has not been installed on an aircraft before.

− Between 120 and 144 months (10 and 12 years):

Remove the component from service and tag it unserviceable before it gets to 168 months (14 years) from EIS (without overhaul) or since it was last overhauled and do the restoration (overhaul) on the component at the operators discretion. (Refer to the COMPONENT RESTORATION (OVERHAUL) TABLE for the AMM and MRB tasks).

− Between 144 and 168 months (12 and 14 years):

Remove the component from service and tag it unserviceable before it gets to 24 months from the service bulletin PART A completion date or before it gets to 186 months (15.5 years) from EIS (without overhaul) or since it was last overhauled, whichever comes first and do the restoration on the component at the operators discretion.

(Refer to the COMPONENT RESTORATION (OVERHAUL) TABLE for the AMM and MRB tasks).

− Between 168 and 186 months (14 and 15.5 years):

Remove the component from service and tag it unserviceable before it gets to 18 months from the service bulletin PART A completion date or before it gets to 198 months (16.5 years) from EIS (without overhaul) or since it was last overhauled, whichever comes first and do the restoration on the component at the operators discretion.

(Refer to the COMPONENT RESTORATION (OVERHAUL) TABLE for the AMM and MRB tasks).

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 6 of 29 Dec 14/2020 Revision A, Dec 02/2021 − Between 186 and 204 months (15.5 and 17 years):

Remove the component from service and tag it unserviceable before it gets to 12 months from the service bulletin PART A completion date or before it gets to 213 months (17.75 years) from EIS (without overhaul) or since it was last overhauled, whichever comes first and do the restoration on the component at the operators discretion.

(Refer to the COMPONENT RESTORATION (OVERHAUL) TABLE for the AMM and MRB tasks).

− Between 204 and 216 months (17 and 18 years):

Remove the component from service and tag it unserviceable before it gets to 9 months from the service bulletin PART A completion date or before it gets to 222 months (18.5 years) from EIS (without overhaul) or since it was last overhauled, whichever comes first and do the restoration on the component at the operators discretion.

(Refer to the COMPONENT RESTORATION (OVERHAUL) TABLE for the AMM and MRB tasks).

− Higher than 216 months (18 years):

Remove the component from service and tag it unserviceable before it gets to 6 months from the service bulletin PART A completion date and do the restoration (overhaul) on the component at the operators discretion. (Refer to the COMPONENT RESTORATION (OVERHAUL) TABLE for the AMM and MRB tasks).

PART B − Removal of the NLG Component(s) from the Aircraft PART B is done if the inspection of the component maintenance documents (PART A) identifies that some NLG component(s) must be overhauled.

If an overhaul of the NLG component(s) is/are required, the affected NLG gear component(s) is removed from service unless otherwise directed by the airworthiness authority of the operator:

PART C −Overhaul of the NLG Component(s) PART C is done if the inspection of the component maintenance documents (PART A) identifies that some NLG component(s) must be overhauled.

PART D − Installation of Serviceable NLG Component(s) on the Aircraft PART D is done to install serviceable NLG components on the aircraft.

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 7 of 29 Dec 14/2020 Revision A, Dec 02/2021 PART E − Removal of the Left MLG Component(s) from the Aircraft PART E is done if the inspection of the component maintenance documents (PART A) identifies that some left MLG component(s) must be overhauled.

If an overhaul of the left MLG component(s) is/are required, the affected left MLG gear component(s) is removed from service unless otherwise directed by the airworthiness authority of the operator:

PART F −Overhaul of the Left MLG Component(s) PART F is done if the inspection of the component maintenance documents (PART A) identifies that some left MLG component(s) must be overhauled.

PART G − Installation of Serviceable Left MLG Component(s) on the Aircraft PART G is done to install serviceable left MLG components on the aircraft.

PART H − Removal of the Right MLG Component(s) from the Aircraft PART H is done if the inspection of the component maintenance documents (PART A) identifies that some right MLG component(s) must be overhauled.

If an overhaul of the right MLG component(s) is/are required, the affected right MLG gear component(s) is removed from service unless otherwise directed by the airworthiness authority of the operator:

PART I −Overhaul of the Right MLG Component(s) PART I is done if the inspection of the component maintenance documents (PART A) identifies that some right MLG component(s) must be overhauled.

PART J − Installation of Serviceable Right MLG Component(s) on the Aircraft PART J is done to install serviceable right MLG components on the aircraft.

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 8 of 29 Dec 14/2020 Revision A, Dec 02/2021

PART A, PART B, PART C,PART D, PART E, PART F , PART G, PART H, PART I and PART J NOTE: If it is not possible to complete all the instructions in this service bulletin because of the configuration of the aircraft, speak with a representative of MHIRJ in the CRC at 450−990−7CRC (450−990−7272) direct, 1−833−990−7CRC (1−833−990−7272) toll free for North America or +1−450−990−7CRC (+1−450−990−7272) for international callers or e-mail at thd.crj@MHIRJ.com for analysis and to get an approved disposition to complete this service bulletin.

This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage Tolerance Inspections (DTIs).

E. Approval The technical content of this service bulletin has been approved under the authority of the TCCA Design Approval Organization No: DAO #20−Q−01.

F . Manpower The man-hours given below are estimates for direct labor done by an experienced crew on an aircraft prepared for maintenance.

These estimates do not include the time necessary for:

−Administrative functions such as planning, liaising, familiarization, and report writing.

−Non-productive elapsed time such as rest time, having meals, and crew shift changes.

−Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.

−Preparation for modification (unless specified in the Accomplishment Instructions) such as cleaning and getting parts, tools, consumables, and ground equipment.

−Quality assurance inspections, troubleshooting and/or correction of discrepancies found when a task is done.

−All other activities that are not considered by MHIRJ as directly related to the accomplishment of this procedure.

NOTE: For on-site labor assistance, please speak with a Fleet Services representative for an estimate. Call the Fleet Services Team through the CRC at 450−990−7CRC (450−990−7272) direct, 1−833−990−7CRC (1−833−990−7272) toll free for North America or +1−450−990−7CRC (+1−450−990−7272) for international callers or e-mail at thd.crj@MHIRJ.com.

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 9 of 29 Dec 14/2020 Revision A, Dec 02/2021 It will take an estimated 4.5 man-hours to complete PART A of this service bulletin.

The man-hours are divided in the table that follows:

TASK MAN-HOURS

(1) Job Set-Up 0.0

(2) Procedure 4.0

(3) Test 0.0

(4) Job Close-Out 0.5 NOTE: The hours above are to do the inspection (PART A) of the documentation only and do not include the time to remove and/or overhaul and/or re−install the component(s) (PART B thru PART J).

G. Material − Price and Availability There are no kits for this service bulletin.

H. Tooling − Price and Availability There are no tool kits for this service bulletin. Refer to paragraph 3.C. for a list of special tools and equipment for this service bulletin.

I. Weight and Balance Not changed.

J. Electrical Load Data Not changed.

K. References Refer to the SB Introduction document for definition or explanation of service bulletin content.

For MHIRJ reference only: Restriction and/or Special Instruction (RSI) C−32−1913, Revision C.

For MHIRJ reference only: PCR 77480 L. Other Publications Affected None.

M. Relationship Chart Not applicable.

SERVICE BULLETIN 670BA−32−062 SB 670BA−32−062 Page 10 of 29 Dec 14/2020 Revision A, Dec 02/2021

2. ACCOMPLISHMENT INSTRUCTIONS PART A − Inspection of the NLG and the MLG Component Maintenance Documents.

A. Job Set-Up

(1) There is no Job set−up for the administrative inspection of the NLG and MLG component maintenance documents. If it is found necessary to do an overhaul on a NLG and/or a MLG component, then refer to the AMM and MRB tasks as noted in the Procedure section of PART B, PART C, PART D, PART E, PART F , PART G, PART H, PART I and/or PART J.

B. Procedure

(1) If it is not possible to complete all the instructions in this service bulletin because of the configuration of the aircraft, speak with a representative of MHIRJ in the CRC at 450−990−7CRC (450−990−7272) direct, 1−833−990−7CRC (1−833−990−7272) toll free for North America or +1−450−990−7CRC (+1−450−990−7272) for international callers or e-mail at thd.crj@MHIRJ.com for analysis and to get an approved disposition to complete this service bulletin.

(2) Do an inspection of the NLG and the MLG component maintenance documents of the components that follow to determine the component’s calendar age.

−NLG Assembly −NLG Drag Brace −NLG Door Drive Link −NLG Retract Actuator −NLG Manual Release Actuator −NLG Steering Actuator −MLG Assembly −MLG Side Stay −MLG Shimmy Damper −MLG Retract Actuator