Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'afefaafef16e06092be92a35e47d91b8b67ed476595fee925c08cf7293f65cb8' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'afefaafef16e06092be92a35e47d91b8b67ed476595fee925c08cf7293f65cb8' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SB 670BA- - - 53- - - 042 Page 1 of 1 Oct 20/2017
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET SERVICE BULLETIN 670BA - - -53 - - -042 S U B J E C T: F u s e l a g e --- M i d d l e F u s e l a g e --- I n s p e c t i o n o f t h e W i n g --- t o --- F u s e l a g e Attachment Nuts This page transmits:
Revision B of Service Bulletin 670BA- - - 53- - - 042, pages 1 thru 28, dated Oct 20/2017 For aircraft that have incorporated a previous issue of this service bulletin, refer to the compliance section.
Reason:
Revised Planning Information, paragraph 1., to:
Add aircraft models CL- - - 600- - - 2D15, CL- - - 600- - - 2D24, and CL- - - 600- - - 2E25 for the inspection of the wing to fuselage attach nuts of the forward keel beam.
Change the compliance time from 6600 to 8800 flight hours for the repeat inspection of the wing to fuselage attach nuts of the forward keel beam.
Remove the repeat inspection requirements for the nuts on the aft keel, rear spar links, and the side stay fittings.
Revised Accomplishment Instructions, paragraph 2., to:
D i v i d et h ei n s t r u c t i o n si n t of i v ep a r t s .P A R TA ,P A R TB ,P A R TC ,P A R TD ,a n d PART E.
Change the inspection of the wing to fuselage attach nuts of the forward keel beam from two nuts to four nuts for all aircraft.
This revision also includes small editorial changes that do not have an effect on the technical content.
Instructions:
Discard the copy of Service Bulletin 670BA- - - 53- - - 042, Revision A, dated Apr 27/ 2012.
Replace with the copy attached.
Service Bulletin History:
Initial issue, dated Dec 21/2011.
Revision A, dated Apr 27/2012 1
SB 670BA−53−042 Page 1 of 28 Dec 21/2011 Revision B, Oct 20/2017
SERVICE BULLETIN Technical Publications THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT ,
TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND THIS SERVICE BULLETIN TO THE NEW
OWNER, UNLESS CONFIRMATION WAS RECEIVED THAT BOMBARDIER COMMERCIAL AIRCRAFT HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION LIST .
SEND THIS SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR HAS SOLD AIRCRAFT OR ATA SYSTEM: 53−20 NUMBER: 670BA−53−042 SUBJECT: Fuselage − Middle Fuselage − Inspection of the Wing−to−Fuselage Attachment Nuts
1. PLANNING INFORMATION A. Effectivity
(1) Aircraft Affected:
Aircraft Model Service Aircraft SerialNumbers Production Aircraft SerialNumbers CL−600−2C10 10002 thru 10999 none [1] CL−600−2D15 and CL−600−2D24 15001 thru 15990 none [1] CL−600−2E25 19001 thru 19990 none [1] [1] There is no production effectivity at this time.
NOTE: The instructions in this service bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Service Bulletins. Before you do this bulletin, examine all STC, STA or equivalent action changes to make sure you can complete this bulletin.
B. Reason
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 2 of 28 Dec 21/2011 Revision B, Oct 20/2017
(1) Condition It is possible that some nuts of the wing−to−fuselage joints are non−compliant with the certification design specifications. Also, it is possible that some nuts were not manufactured to MIL−DTL−25027 standards and do not have self−locking properties. Non−compliant nuts only have a single locking device and not the dual locking function necessary at these joints.
This increases the probability that a nut could loosen and let the bolt migrate and cause a loss of integrity of the joint.
(2) Evidence Non−compliant nuts were found on CRJ700/900 aircraft.
(3) Objective/Benefit This service bulletin gives the procedure to inspect the wing−to−fuselage attachments. This will make sure that one locking device (cotter pin) is installed.
C. Description This service bulletin is divided into 5 parts: PART A, PART B, PART C, PART D, and PART E.
PART A − Detailed visual inspection of the wing to fuselage attach nuts of the aft keel beam.
The Main Landing Gear (MLG) wheel bins are removed. A detailed visual inspection of the nuts of the aft keel beam is done to make sure that cotter pins are installed.
The MLG wheel bins are installed.
PART B − Detailed visual inspection of the wing to fuselage attach nuts of the rear spar links.
Access panels are removed. A detailed visual inspection of the nuts of the rear spar links is done to make sure that cotter pins are installed. The access panels are installed.
PART C − Detailed visual inspection of the wing to fuselage attach nuts of the side stay fittings.
The Main Landing Gear (MLG) wheel bins are removed. A detailed visual inspection of the nuts of the side stay fittings is done to make sure that cotter pins are installed.
The Main Landing Gear (MLG) wheel bins are installed.
PART D − Detailed visual inspection of the wing to fuselage attach nuts of the forward keel beam.
The forward fairing access panels are removed. A detailed visual inspection of the
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 3 of 28 Dec 21/2011 Revision B, Oct 20/2017 nuts of the forward keel beam is done to make sure that cotter pins are installed.
The forward fairing access panels are installed.
PART E − Repeat detailed visual inspection of the wing to fuselage attach nuts of the forward keel beam.
The forward fairing access panels are removed. A detailed visual inspection of the nuts of the forward keel beam is done to make sure that cotter pins are installed.
The forward fairing access panels are installed.
D. Compliance Recommended Service Bulletin.
For aircraft 10002 thru 10337, 15001 thru 15299, and 19001 thru 19037 that have not done a previous issue of this service bulletin.
Bombardier recommends that PART A of this service bulletin be done at no more than 6600 flight hours from the initial release date of this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
For aircraft 10002 thru 10329, and 15001 thru 15272 pre-service bulletin 670BA-57-016, and for aircraft 10330 thru 10331, and 15273 thru 15279, that have not done a previous issue of this service bulletin.
Bombardier recommends that PART B of this service bulletin be done at no more than 6600 flight hours from the initial release date of this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
For aircraft 10011 thru 10337, 15001 thru 15299, and 19001 thru 19037 that have not done a previous issue of this service bulletin.
Bombardier recommends that PART C of this service bulletin be done at no more than 6600 flight hours from the initial release date of this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
For aircraft 10002 thru 10337 that have not done a previous issue of this service bulletin.
Bombardier recommends that PART D of this service bulletin be done at no more than 6600 flight hours from the initial release date of this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
For aircraft 10338 thru 10999, 15001 thru 15990, and 19001 thru 19990 that have not done a previous issue of this service bulletin.
Bombardier recommends that PART D of this service bulletin be done at no more than 8800 flight hours from the revision B release date of this service bulletin, unless otherwise directed by the airworthiness authority of the operator.
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 4 of 28 Dec 21/2011 Revision B, Oct 20/2017 For aircraft 10002 thru 10999, 15001 thru 15990, and 19001 thru 19990 Bombardier recommends that PART E of this service bulletin be repeated every 8800 flight hours from the initial inspection date, unless otherwise directed by the airworthiness authority of the operator.
This service bulletin does not affect Airworthiness Limitations (AWLs) or Damage Tolerance Inspections (DTIs).
E. Approval The technical content of this service bulletin has been approved under the authority of the TCCA Design Approval Organization No: DAO #93−Q−02.
F . Manpower The man-hours given below are estimates for direct labor done by an experienced crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
Administrative functions such as planning, liaising, familiarization, and report writing.
Non-productive elapsed time such as rest time, having meals, and crew shift changes.
Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
Preparation for modification (unless specified in the Accomplishment Instructions) such as cleaning and getting parts, tools, consumables, and ground equipment.
Quality assurance inspections, troubleshooting and/or correction of discrepancies found when a task is done.
All other activities that are not considered by Bombardier as directly related to the accomplishment of this procedure.
NOTE: For on-site labor assistance, please speak with a Fleet Services representative for a quote. Contact the Fleet Services Team through the CRC at 514-855-8500 or email at thd.crj@aero.bombardier.com.
PART A It will take an estimated 3.0 man-hours to complete this service bulletin. The man-hours are divided in the table that follows (elapsed cure time is not included in the man-hour summary given above):
TASK MAN-HOURS
(1) Job Set-Up 1.0
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 5 of 28 Dec 21/2011 Revision B, Oct 20/2017
TASK MAN-HOURS
(2) Procedure 0.5
(3) Test 0.5
(4) Job Close-Out 1.0 PART B It will take an estimated 2.0 man-hours to complete this service bulletin. The man-hours are divided in the table that follows (elapsed cure time is not included in the man-hour summary given above):
TASK MAN-HOURS
(1) Job Set-Up 0.5
(2) Procedure 0.5
(3) Test 0.5
(4) Job Close-Out 0.5 PART C It will take an estimated 2.0 man-hours to complete this service bulletin. The man-hours are divided in the table that follows (elapsed cure time is not included in the man-hour summary given above):
TASK MAN-HOURS
(1) Job Set-Up 0.5
(2) Procedure 0.5
(3) Test 0.5
(4) Job Close-Out 0.5 PART D
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 6 of 28 Dec 21/2011 Revision B, Oct 20/2017 It will take an estimated 2.0 man-hours to complete this service bulletin. The man-hours are divided in the table that follows (elapsed cure time is not included in the man-hour summary given above):
TASK MAN-HOURS
(1) Job Set-Up 0.5
(2) Procedure 0.5
(3) Test 0.5
(4) Job Close-Out 0.5 PART E It will take an estimated 2.0 man-hours to complete this service bulletin. The man-hours are divided in the table that follows (elapsed cure time is not included in the man-hour summary given above):
TASK MAN-HOURS
(1) Job Set-Up 0.5
(2) Procedure 0.5
(3) Test 0.5
(4) Job Close-Out 0.5 G. Material − Price and Availability There are no kits for this service bulletin.
H. Tooling − Price and Availability There are no tool kits for this service bulletin. Refer to paragraph 3.C. for a list of special tools and equipment for this service bulletin.
I. Weight and Balance Not changed.
J. Electrical Load Data Not changed.
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 7 of 28 Dec 21/2011 Revision B, Oct 20/2017 K. References Restriction and/or Special Instruction (RSI) C−53−1458−00, Revision H Aircraft Maintenance Manual (AMM) For Bombardier reference only: PCA 74320.
L. Other Publications Affected None M. Relationship Chart Not applicable.
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 8 of 28 Dec 21/2011 Revision B, Oct 20/2017
2. ACCOMPLISHMENT INSTRUCTIONS PART A − Detailed visual inspection of the wing to fuselage attach nuts of the aft keel beam.
For aircraft 10002 thru 10337, 15001 thru 15299, and 19001 thru 19037 that have not done a previous issue of this service bulletin.
Reference Information
REFERENCE DESIGNATION AMM 12−00−00−867−801 Standard Aircraft Configuration for Maintenance AMM 24−00−00−910−801 Electrical/Electronic Safety Precautions AMM 26−14−00−710−801 Operational test of the MLG Overheat detection and Warning System AMM 53−83−89−000−801 Removal of the Main Landing Gear (MLG) Wheel Bin AMM 53−83−89−400−801 Installation of the Main Landing Gear (MLG) Wheel Bin NDTM 51−20−009−210 Visual Inspection Procedures A. Job Set-Up NOTE: The steps in the Job Set-Up section of this service bulletin are recommended steps. The steps give a recommendation to get access to the work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator discretion.
(1) Make sure that the aircraft is in standard configuration for maintenance (AMM 12−00−00−867−801).
WARNING: OBEY ALL THE SAFETY PRECAUTIONS WHEN YOU DO
MAINTENANCE ON OR NEAR ELECTRICAL/ELECTRONIC EQUIPMENT. IF YOU DO NOT OBEY THE SAFETY PRECAUTIONS,
INJURIES TO PERSONS AND/OR DAMAGE TO THE EQUIPMENT CAN OCCUR.
(2) Obey all the electrical/electronic safety precautions (AMM 24−00−00−910−801).
(3) Remove the MLG wheel bins (AMM 53−83−89−000−801).
B. Procedure
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 9 of 28 Dec 21/2011 Revision B, Oct 20/2017
(1) If it is not possible to complete all the instructions in this service bulletin because of the configuration of the aircraft, speak with a representative of Bombardier in the CRC at 1−844−272−2720 (1−844−CRC−CRC0) or 1−514−855−8500 or e-mail at thd.crj@aero.bombardier.com for analysis and to get an approved disposition to complete this service bulletin.
Refer to Figure 1 .
(2) Do a detailed visual inspection of the two nuts that attach the aft keel−beam to the fitting (refer to NDTM 51−20−009−210).
(3) Make sure that cotter pins are installed on the two nuts.
(4) If a nut does not have a cotter pin installed, speak with a customer response center (CRC) representative at 1−844−272−2720 (1−844−CRC−CRC0) or 1−514−855−8500 or send an e−mail at thd.crj@aero.bombardier.com for a disposition.
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 10 of 28 Dec 21/2011 Revision B, Oct 20/2017 Aft Keel Beam Figure 1 ba7187a01.cgm, FP , 12/12/11
FITTING (REF) B B A
COTTER PIN (REF) NUT (REF) TYPICAL 2 PLACESA Aft
AFT KEEL BEAM (REF)
AFT KEEL BEAM (REF)
SERVICE BULLETIN 670BA−53−042 SB 670BA−53−042 Page 11 of 28 Dec 21/2011 Revision B, Oct 20/2017 C. Job Close-Out NOTE: The steps in the Job Close-Out section of this service bulletin, except for the return-to-service tests, are recommended steps. The steps give a recommendation to install components removed during the Job Set-Up.
This recommendation is to make sure that the aircraft is safe and ready to return to service. Alternative steps can be used at the operator discretion.
(1) Remove all tools, equipment, and unwanted materials from the work area.
(2) Install the Main Landing Gear (MLG) wheel bins (AMM 53−83−89−400−801).
(3) Do the Operational test of the MLG Overheat detection and Warning System (AMM 26−14−00−710−801)
(4) When PART A of this service bulletin is completed, make this entry in the applicable logbooks: /quoteblleftService Bulletin 670BA−53−042, Revision B, Fuselage − Middle Fuselage − Inspection of the Wing−to−Fuselage Attachment Nuts, PART A, incorporated."