This text is OCR from a scan. OCR can misread letters and numbers. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2011-1095; AD 2012-08-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a8b976ae42b961c2bec45696b95d5a639b986d9884d0e5e86b0360dc589274eb' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'a8b976ae42b961c2bec45696b95d5a639b986d9884d0e5e86b0360dc589274eb' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
CHALLENGÉR 605 CUSTOMER SERVICES AIRCRA
SERVICE BULLETIN SUMMARY This Service Bulletin is available at:
www.cic.bombardier.com MODEL CL-600-2B16 ATA 24-50
ELECTRICAL POWER
INSPECTION/MODIFICATION - AC ELECTRICAL LOAD DISTRIBUTION -
INSPECTION OF LOOSE AND IMPROPERLY CRIMPED TERMINAL LUG CONNECTIONS IN CBP-1 AND REPLACEMENT/RELOCATION OF BUS BARS The information below is provided for your reference. For full details, please see corresponding paragraph contained within this bulletin.
RECOMMENDED Before or at the next 800 hour check COMPLIANCE TIME
SPECIFIED TIME COMPLIANCE EFFECTIVITY: AC Serial No. 5701 to 5752, 5754 to 5775, 5777, 5780 to 5781, 5783 to 5790, 5792, 5794 to 5796, 5798, 5801 and 5804 MANPOWER: 3 man-hours KITS and/or PARTS YES NO
TOOLING/GSE YES NO information at the start of Paragraph 1. PLANNING INFORMATION: See important YES NO
DEDICATED SCHEDULE YES NO PREREQUISITE SERVICE BULLETINS: N/A To place an order for parts or kits, please call Bombardier Parts Logistics at:
514-855-2999 or 1-866-538-1247 Basic Issue: Jan 18/2010 605-24-004 Page 1 of 1
CHÄLLỀNGÉR 605 CUSTOMER SERVICES SINE AIRCRAF
SERVICE BULLETIN This Service Bulletin is available at:
www.cic.bombardier.com MODEL CL-600-2B16 ATA 24-50
ELECTRICAL POWER
INSPECTION/MODIFICATION - AC ELECTRICAL LOAD DISTRIBUTION -
INSPECTION OF LOOSE AND IMPROPERLY CRIMPED TERMINAL LUG CONNECTIONS IN CBP-1 AND REPLACEMENT/RELOCATION OF BUS BARS
1. PLANNING INFORMATION.
NOTE: To minimize aircraft downtime, it is suggested to do SB 605-24-002 at the same time as this Service Bulletin.
A. Effectivity CL-600-2B16 aircraft, Serial No. 5701 to 5752, 5754 to 5775, 5777, 5780 to 5781, 5783 to 5790, 5792, 5794 to 5796, 5798, 5801 and 5804.
All other subsequent CL-600-2B16 aircraft are scheduled for the modification in production (Ref.: Restriction and/or Special Instruction, C-4038 and Production Modsum 600-6046).
NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aerospace Service Bulletin(s).
Before you do this bulletin, examine all SIC, STA or equivalent action changes to make sure that this bulletin can be completed.
Refer to applicable govemmental agency regulations and requirements and make sure that the work described in this service Bulletin is performed in compliance with manufacturer's recommendations and/or acceptable industry standards This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or y any means without the prior witten consent of Bombardier Inc. and/or its affiliates © 2010 Bombardier Inc. All rights reserved Challenger*, Global Express*, Global Express **+, Global 5000*, Learjet* are Trademarks of Bombardier Inc Basic Issue: Jan 18/2010 605-24-004 Page 1 of 12
CHALLENGER 605 MODEL CL-600-2B16 B. Reason Quality Control investigations have reported conditions affecting the wiring of Circuit Breaker Panel 1 (CBP-1). It was discovered that Foreign Object Damage (FOD) may be found in this locations. In addition, the crimping process of the nickel plated terminal lugs, size #22-20 with the green color insulating sleeve, may not have been manufactured as per applicable standards. It was also discovered that the possibility of a short circuit (arcing) between specific bus bars and the circuit breaker panel structure could occur, due to their close proximity.
This Service Bulletin gives instruction to inspect for FOD in the affected areas, to replace any loose or badly crimped lugs and to relocate and replace the CBP-1 Bus Bars to ensure safety, reliability and wiring integrity.
C. Description This Service Bulletin gives instructions to:
- Get access to circuit breaker panels 1, (CBP-1), Replace/relocate the CBP-1 Bus Bars, Do the wiring modification per kit drawing,
- Inspect and pull test all terminal lugs, size #22-20 with the green color insulating sleeve and replace if necessary, Perform a FOD inspection of the areas, and
- Do the necessary tests to make sure that the system operates correctly.
D. Compliance Recommended before or at the next 800 hour check from this Service Bulletin release date (Basic Issue).
The access and time required to perform this modification are minimal, and we therefore recommend you do it to improve reliability.
E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93-Q-02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by the JAA and by EASA in accordance with established procedures.
Basic Issue: Jan 18/2010 605-24-004 Page 2 of 12
CHALLENGER 605 MODEL CL-600-2B16 F. Manpower NOTES: 1. The man-hours given are estimates to help you schedule the tasks given in this bulletin. The estimates are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.
For more information related to the manpower estimates, refer to SB 605-00-002.
2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the labor estimates and should be considered for planning purposes before you schedule this Service Bulletin.
3. Labor hours are based on the fact that the modification will be done at the next scheduled maintenance task or inspection (e.g. 800 hour inspection).
3 man-hours are necessary to do this inspection/rework.
The labor required to do this Service Bulletin is available at no cost if:
the work is done during new aircraft warranty period, and (i¡) the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and (III) this Service Bulletin is scheduled in less than 12 months from its release date (Basic Issue).
G. Material - Cost and Availability Kit 605K24-004 is necessary to do this inspection/modification. Only the U.S.
domestic price is shown:
KIT NO. PRICE 605K24-004 $346.80 The above price can change. For the price outside of the U.S., refer to the last applicable Spare Parts Price Catalog. This data is also available from Bombardier Business Aviation Services (BBAS) at the addresses shown in the catalog.
Sufficient kits will be kept for the estimated amount of orders.
In addition to the kit shown above, the part in Paragraph 3.B. may be necessary to do this inspection/modification.
The kit and/or part are available at no cost if:
ordered during new aircraft warranty period, and (i¡) a no-charge purchase order is sent to Bombardier Aerospace in less than 12 months from this Service Bulletin release date (Basic Issue).
Basic Issue: Jan 18/2010 605-24-004 Page 3 of 12
čHẤLLỀNGÉR 605 OM MODEL CL-600-2B16 Smart Parts Plus does not pay for the kit at any time as all affected aircraft were in warranty at the time of this Service Bulletin distribution.
H. Tooling GSE REFERENCE NO. PART NO. DESCRIPTION Commercially Available Tag Rag Commercially Available Vacuum Commercially Available 69692-1 Crimper Commercially Available 69710-1 Crimper Commercially Available 22-20 Positioner Commercially Available 69732 Positioner NOTES: 1. Refer to the CL-605 Illustrated Tool and Equipment Manual to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement for acceptable GSE equivalents.
I. Weight and Balance No change.
J. Electrical Load Data No change.
K. References
- Bombardier Aerospace, Modification Summary, 600-6056, Rev. B-1.
- Bombardier Aerospace, Modification Summary, 600-6046, Rev. B-1.
Bombardier Aerospace, Restriction and/or Special Instruction (RSI), C-4038, Rev. B.
Bombardier Aerospace, Kit Drawing K604-54046, Rev. A.
- CL-605 Aircraft Maintenance Manual (AMM), Chapters 6, 24 and 31.
- CL-605 Wiring Manual (WM), Chapter 20.
L. Other Publications Affected
- CL-605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 31.
M. Equivalent Service Bulletin None.
Basic Issue: Jan 18/2010 605-24-004 Page 4 of 12
CHALLENGER 605 MODEL CL-600-2B16
2. ACCOMPLISHMENT INSTRUCTIONS NOTES: 1. All TASKs given in the procedures that follow are from the CL-605 Aircraft Maintenance Manual unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the CL-605 Aircraft Maintenance Manual, Chapter 6.
A. Aircraft Setup
(1) Obey all electrical/electronic safety precautions. Refer to TASK 24-00-00-910-801.
(2) Make sure that the BATT MASTER switch on the ELECTRICAL POWER control panel is set to the OFF position. Put a tag on the BATT MASTER switch.
(3) Disconnect the main battery. Refer to TASK 24-32-00-040-801.
(4) Disconnect the APU battery. Refer to TASK 24-32-00-040-802.
B. Inspection/Rework
(1) Gain access to the affected CBP-1 panel. Refer to Figure 1:
CBP-1 Part # 604-54046-1, -3 or -5 Remove, TASK 31-18-01-000-801 Install, TASK 31-18-01-400-801 Figure 1 Location of Affected CBP-1 Panel
(2) Remove existing bus bars W50PA & W52PA and retain for re-installation.
Refer to the attached Kit Drawing K604-54046.
NOTE: Bus bar W52PA may be installed in position L2 - Q2 due to a production modification.
(3) Relocate wires PA94D8 and PA31M8 as per attached Kit Drawing K604-54046. Refer to Chapter 20, Wiring Manual, Standard Practices.
Basic Issue: Jan 18/2010 605-24-004 Page 5 of 12
CHÄLLENGER 605 ARDIER MODEL CL-600-2B16
(4) Replace existing bus bar W5PA. Refer to the attached Kit Drawing K604-54046.
(5) Re-install existing bus bar W50PA (previously retained at step (2)) at the new location. Refer to the attached Kit Drawing K604-54046.
(6) Relocate or replace existing bus bar W25PA (if required). Refer to the attached Kit Drawing K604-54046.
(7) Re-install existing bus bar W52PA (previously retained at step (2)) at the new location. Refer to the attached Kit Drawing K604-54046.
(8) Add new wires PA309A20 and PA310A20 as per attached Kit Drawing K604-54046. Refer to Chapter 20, Wiring Manual, Standard Practices and the Table 1 below for crimping tool required
(9) Inspect all green terminal lugs (Part No. B0808005-005N) within CBP-1 by doing the following:
(a) Verify all affected terminal lugs by doing a manual pull test (light finger force) on all size #22 and #20 gauge wires located in the specified circuit panel locations. This also includes the Lower part of CBP-1 (P/N 604-54043-1).
(b) If any wire is found loose or any wire separates from the lug, the lug must be discarded and the wire tip cut back and re-terminated with a new lug of the appropriate part number. Refer to Chapter 20, Wiring Manual, Standard Practices and Table 1, which follows:
Part Number Equivalent P/N Tool Positioner Remarks B0808005-005N N538-8043 69692-1 22-20 SEL #1 AWG, #3 AWG 22 M7928/4-149 47386 47806-2 Table 1
(c) The above procedure is repeated until all wires successfully pass the pull test.
(d) All crimped terminal lugs showing any of the following conditions must also be repaired per the same standard practices:
- Cracked lug barrel,
- Cracked or perforated lug insulation,
- Asymmetrical secondary crimp,
- Broken wire strands, and Insufficient or partial wire insertion into lug barrel.
Basic Issue: Jan 18/2010 605-24-004 Page 6 of 12
CHALLENGER 605 MODEL CL-600-2B16
(10) Verify all electrical connections involving screw and nut fasteners. Make sure that there are no loose connections and that the lugs cannot rotate on the fastener axis. Refer to the following Table 2 for the recommended torque values:
Component Screw / Stud Size Torque Value (in Ibs) Circuit Breaker #8 - Steel 17 - 19 P/N MS24571-50 (Qty 3 units) (Qty 2 per unit) All other Circuit Breaker P/N's #8 - Steel 13-15 (Qty 2 per unit) Power Diodes (Qty 2 units) M5 Steel (Qty 2 per unit) 24 - 30 Table 2 C. Testing
(1) Do a continuity test of all newly installed wires, relocated wires and any wiring disturbed by this inspection/modification.
(2) Do a visual inspection of CBP-1 upper and CBP-1 lower to ensure that there is no FOD. If FOD is found to be present, clean as required.
(3) Connect and energize the external ac power. Refer to TASK 24-41-00-861-801.
(4) Verify if power is available on the bus bar of CBP 1, rows F, G, L, M, N and P.
(5) Verify if power is available on load side of circuit breakers on rows Hand Q.
(6) Do the operational test of the associated system of any lug that was replaced.
(7) Remove power from the aircraft. Refer to TASK 24-00-00-861-802.
(8) Close circuit breaker panel CBP-1.
D. Close-out Remove all tools, equipment and unwanted materials from the aircraft.
E. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).
Basic Issue: Jan 18/2010 605-24-004 Page 7 of 12
CHALLENGER 605 DI MODEL CL-600-2B16
3. MATERIAL INFORMATION A. Kit Kit 605K24-004 is necessary to do this Service Bulletin and contains the parts that follow:
NEW QTY ITEM USED INSTRUCTIONS - PART NO. PART NO. DISPOSITION K604-54046-1/01 1 Wire Kit S1448-10-28-13 1 Bus Bar NOTES: 1. In case of discrepancy between this list and the Service Bulletin Kit Parts List" contained in the respective kit, then the latter list prevails.
2. The actual quantity for some of the hardware contained in the kit can be greater than the amount shown in the table as these items are supplied in prepackaged quantities.
B. Parts The part that follows may be necessary to do this Service Bulletin and is available from Bombardier Aerospace Parts Logistics, Montréal:
NEW QTY ITEM USED INSTRUCTIONS - PART NO. PART NO. DISPOSITION B0808005-005N AIR Terminal Lug same Discard NOTE: The part number for the item listed above is subject to change without revision to this Service Bulletin. In case of discrepancy between this list and any other list, the Illustrated Parts Catalog prevails and shall be used to determine the latest part number.
C. Material No materials required.
D. Publications No publications required.
Basic Issue: Jan 18/2010 605-24-004 Page 8 of 12
CHALLENGER 605 MODEL CL-600-2B16 REV CODE C z MS CODE PLK604-54048 cc MODEL VERSION04 MODEL TYPE: MATERIAL SPEC B0801220-20-9 B0801220-20-9 CB1-H1, -H3, -Q1, -Q2 SHEET DRAWN BY: 1 OF 2 J.-M. BENOIT TITLE KIT-INSTL'N, CBP-1 REWORK CAGE CODE 88308 SIZE DESCRIPTION KIT-INSTL'N. CBP-1 REWORK 12 INS
BUS BAR WIRE WIRE LUG PART, DASH OR IDENTIFYING NO. K804-54046-1 S1448-10-28-13 PA309A20 PA310A20 M7928/4-149 P.O. Box 6087, Station Centre-ville Montreal, Quebec, Canada H3C 3GB CAGE CODE 88308 88308 88308 88308 88308 BOMBARDIER AEROSPACE Bombardier Inc., Montreal ZONE FIND SHEET NO. 11 18 18 BT0501-1 CT4 REV 1999-05 SB804-24-004-54048-A-S1-PL
QTY REQ'D LH PER RH PL K604-54046 - Kit Installation - Rework of CBP-1 (Sheet 1 of 2, Rev. A) Basic Issue: Jan 18/2010 605-24-004 Page 9 of 12
CHALLENGER 605 MODEL CL-600-2B16 TREV ASSY ©19g0 Bombardier Inc.
MS CODE PL K604-54048 cc MODEL VERSION: 04 MODEL TYPE: CULING CONDITION AS REVISION ORBUTT ENSURE THAT CIRCUIT BREAKERS ELECTRICAL ATTACHMENT POINTS (A1 & A2 TERMINALS SCREW) LENGTH IS ADEQUATE. i.e. 3 TO 7 THREADS SHOULD BE A/C INCORPORATED WITH S/B 805-34-004 "3RD IRS" REVISION 02 OR EARLIER ARE FITTED WITH A BUS BAR P/N S1448-10-28-10 (10 CIRCUIT IN THIS CASE, THE BUS BAR P/N -10 SHALL BE REPLACED WITH A BUS BAR ¡.e. THE FINAL CONFIGURATION SHOULD SHOW A BUS BAR FROM POSITION SHEET DRAWN BY: J.-M. BENOIT CAGE CODE 88308 DENOTES NEW WIRE. DENOTES EXISTING WIRE OR CABLE. PROTRUDING AND, NO FOULING CONDITIONS SHOULD OCCUR. BREAKER HOLE LOCATIONS) FROM POSITION CB1-Q1 TO -Q10. -9 (8 CIRCUIT BREAKER HOLE LOCATIONS).
Bombardier Inc., Montreal 400 Cote Vertu Road, West Dorval, Quebec, Canada H4S 1Y8 CB1-Q2 TO -Q10 ONLY.
BOMBARDIER AEROSPACE NOTES 2. BT0501-2 CT4 REY 1999-01 SB604-24-004-54048-A-S2-PL PL K604-54046 - Kit Installation - Rework of CBP-1 (Sheet 2 of 2, Rev. A) Basic Issue: Jan 18/2010 605-24-004 Page 10 of 12
605-24-004 Page 11 of 12 2221 VIEM LOOKINA FED REAR OF PANEL K604-54046 - Kit Installation - Rework of CBP-1 95525552 (Sheet 1 of 1, Rev. A) Basic Issue: Jan 18/2010