Service bulletin · Bombardier

No revision namedFAA-2016-7418_SB 605-28-009 · 23 pages · 1.7 MB

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2016-7418; AD 2016-20-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2016-7418 (document 0004) · AD 2016-20-09

Manufacturer
Bombardier
Type
Service Bulletin
Number
605-28-009

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 23Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2016-7418; AD 2016-20-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '1eaf726d9a9c426c3f6a499cc29155526a279ff06a606a825117158d3904b009'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SPECIAL CHECK/MODIFICATION - AUXILIARY POWER UNIT (APU) FUEL-FEED

SYSTEM - POSSIBLE CHAFING OF THE APU NEGATIVE-G FUEL-FEED DRAIN LINE The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.

RECOMMENDEDSPECIFIED TIME COMPLIANCE COMPLIANCE TIMESee Paragraph 1. D.

EFFECTIVITY: AC Serial No. 5701 to 5970 MANPOWER: 0.5 man−hour is necessary to do the special check in Part A.

8 man−hours may be necessary for the modification in Part B.

22 man−hours may be necessary for the modification in Part C.

CONTINUED AIRWORTHINESS (CAW)

FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO

TOOLING/GSE YES NO

PLANNING INFORMATION NOYES

DEDICATED SCHEDULE NOYES PREREQUISITE SERVICE BULLETINS: N/A

SERVICE BULLETIN SUMMARY www.cic.bombardier.com MODEL CL−600−2B16 ATA 28−24 FUEL Basic Issue: May 19/2015 605−28−009Page 1 of 1 This Service Bulletin is available at:

SPECIAL CHECK/MODIFICATION - AUXILIARY POWER UNIT (APU) FUEL-FEED

SYSTEM - POSSIBLE CHAFING OF THE APU NEGATIVE-G FUEL-FEED DRAIN LINE

1. PLANNING INFORMATION A. Effectivity CL−600−2B16 aircraft Serial No. 5701 to 5970.

B. Reason There is a possibility that the APU negative−G fuel−feed drain line attached to the drain shroud at the pressure bulkhead FS621.00, LBL20.30 and WL59.00, may be interfering with the wires and/or backshell of the connector P251 and/or frame at FS625.00.

This Service Bulletin gives instructions to do an inspection of the affected aircraft to make sure that there is sufficient clearance along the APU negative−G fuel−feed drain line. Instructions are given to replace the APU negative−G fuel−feed drain line, hose and/or fuel feed tube assembly, if there is any fouling of the APU negative−G fuel−feed drain line with wires and backshell of the connector P251 and/or with frame.

C. Description This Service Bulletin gives instructions to:

− Open the Aft equipment compartment door (311BB) to access the area around the APU negative−G fuel−feed drain line at FS621.00, LBL20.30 and WL59.00, − Inspect the APU negative−G fuel−feed drain line (drain line),

SERVICE BULLETIN www.cic.bombardier.com MODEL CL−600−2B16 ATA 28−24 FUEL Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.

This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.

2015 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.

Basic Issue: May 19/2015 605−28−009Page 1 of 20 This Service Bulletin is available at:

− Remove components for access to replace the APU negative−G fuel feed tube assembly, if necessary, − Replace the APU negative−G fuel−feed tube, if necessary, − Replace the drain line, if necessary, − Install components that were removed for access, if necessary, − Do the fuel feed line leak check, if necessary, − Do the pressure and blockage test to make sure that the APU fuel−feed tube is correctly installed, if necessary, and − Close the Aft equipment compartment door (311BB) which was opened for access.

D. Compliance Recommended within 24 months from this Service Bulletin release date (Basic Issue).

E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.

NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.

2. The technical content of this Service Bulletin is accepted by EASA in accordance with established procedures.

F. Manpower NOTES: 1. The man −hours given are estimates to help you schedule the tasks given in this bulletin. The estimates are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.

For more information related to the manpower estimates, refer to SB 605−00−002.

2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the labor estimates and should be considered for planning purposes before you schedule this Service Bulletin.

MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 2 of 20

0.5 to 22 man−hours total may be necessary to do this special check/modification.

− 0.5 man−hour is necessary for the special check in Part A, − 8 man−hours may be necessary for the modification in Part B, − 22 man−hours may be necessary for the modification in Part C.

Note:The 22 man−hours for Part C also includes the man−hours to perform Part B.

For aircraft in new aircraft warranty at the time of the Service Bulletin (Basic Issue) release date, labor (does not include the Special Check, Part A) required to do this modification (Part B or C) is at no cost if:

1. the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and

2. this Service Bulletin is scheduled in less than 24 months from its release date (Basic Issue).

For aircraft out of warranty, Bombardier Aerospace does not pay for the labor to do this special check or for any rework that may be necessary.

G. Material − Cost and Availability Kit 605K28−009A may be necessary for aircraft, Serial No. 5701 to 5913, 5917, 5918, 5923 to 5970 to do this modification.

KIT NO. PRICE 605K28−009A Please contact Bombardier Aerospace Parts Services, in Montreal, for delivery lead times and confirmation of prices.

Kit 605K28−009B is necessary for aircraft, Serial No. 5914 to 5916 and 5919 to 5922 to do this modification.

NOTE: The kit 605K28 −009B will be available to order at the end of June 2015.

KIT NO. PRICE 605K28−009B Please contact Bombardier Aerospace Parts Services, in Montreal, for delivery lead times and confirmation of prices.

The kits are available at no cost for aircraft in new aircraft warranty at time of the Service Bulletin (Basic Issue) release date if:

− a no−charge purchase order is sent to Bombardier Aerospace in less than 24 months from this Service Bulletin release date (Basic Issue).

For those aircraft in new aircraft warranty at the time of Service Bulletin distribution Smart Parts Plus does not pay for the kit to do this modification at any time.

MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 3 of 20

For those aircraft out of new aircraft warranty at the time of Service Bulletin distribution Smart Parts Plus pays for the kit for up to 24 months from the Service Bulletin distribution date (Basic Issue).

H. Tooling The equipment and tools listed below are necessary to do this modification:

GSE REFERENCE NO. PART NO. DESCRIPTION Commercially Available − Air Test Stand Commercially Available − Plug, Shroud Drain I. Weight and Balance No change.

J. Electrical Load Data No change.

K. References − Bombardier Aerospace, Modification Summary, 600−6425, Rev. C.

− Bombardier Aerospace, Restriction and/or Special Instruction (RSI), C−4121, Rev. A.

− Bombardier Aerospace, Kit Drawing K601−62706, Rev. B.

− CL−605 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 28, 51 and 53.

L. Publications Affected − CL−605 Aircraft Maintenance Manual (AMM), Chapters 28.

− CL−605 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.

M. Equivalent Service Bulletins − For the CL−601 aircraft, use SB 601−0640.

− For the CL−604 aircraft, use SB 604−28−021.

MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 4 of 20

2. ACCOMPLISHMENT INSTRUCTIONS NOTES: 1. All TASKs given in the procedures that follow are from the CL −605 Aircraft Maintenance Manual unless otherwise specified.

2. All references made to zones, access panels and/or doors, are from the CL−605 Aircraft Maintenance Manual, Chapter 6.

A. Aircraft Setup

(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.

(2) Remove electrical power from the aircraft. Refer to AMM 24 −00−00−861−802.

(3) Obey the fuel system safety precautions. Refer to AMM 28 −00−00−910−801.

(4) Open the aft equipment compartment door (311BB). Refer to AMM 52−41−00−010−801.

(5) For access to do the pressure and blockage check of the shroud, remove the cargo compartment floor panels 241DLF and 241FLF. Refer to AMM 53−01−01−000−803.

(6) If the replacement of the APU negative −G fuel feed tube assembly is necessary, remove the components that follow to get access:

(a) Remove the APU battery. Refer to AMM 24 −32−04−000−801.

(b) Remove the radio altimeter transceiver. Refer to AMM 34−44−01−000−801.

(c) Remove the LH wing anti −ice manifold duct (Part No. 14246−1). Refer to AMM 30−11−01−000−801.

B. PART A: Special Check − Possible Chafing of the APU Negative−G Fuel Feed Drain Line (Applicable for aircraft Serial No. 5701 to 5913, 5917, 5918 and 5923 to 5970) For aircraft Serial No. 5914 to 5916 and 5919 to 5922, PART A is not applicable, you must proceed to do Part C in Paragraph 2.D.

(1) Inspect the drain line which is attached to the shroud, at FS621.00, LBL20.30 and WL59.00, as follows: Refer to Figures 1, 2, 3, 4 and 5 for examples of potential fouling.

(a) Make sure that the drain line does not foul with the following:

(i) The connector P251 backshell or wires.

(ii) The wing Anti −Ice shroud boot which is located immediately above and to the left of the drain line at FS621.00.

(iii) The frame at FS625.00.

MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 5 of 20

(iv) Any other component.

(2) For aircraft, Serial No. 5701 to 5913, 5917, 5918 and 2923 to 5970, make sure that there is a 0.5 in (12.7 mm) minimum clearance along the drain line and the surrounding structure and other components as follows:

(a) For aircraft, Serial No. 5923 and 5928 to 5970, to avoid a potential risk of fouling between the drain line and the electrical wiring from the connector P251, do the step that follows:

(i) Reclock the connector P251 backshell to get a 0.5 in (12.7 mm) minimum clearance.

(b) If the clearance is below 0.50 in (12.7 mm) and is greater or equal to 0.25 in (6.35 mm) along the drain line and the surrounding structure and other components, locally apply a small hand pressure load of 5 to 10 lbs (2.3 to

4.5 kg) in all directions to the drain line, and continue as follows:

(i) If no fouling is found, condition is acceptable. Proceed to the Close−Out in Paragraph 2.F.

(ii) If fouling occurs or if clearance is less than 0.25 in (6.4 mm) replace the drain line. Proceed to do Part B in Paragraph 2.C.

C. PART B: Modification − Replacement of the APU Negative−G Fuel−Feed Drain Line

(1) Replace the APU negative −G fuel−feed drain line as follows:

(a) Remove and discard the drain line Part No. 601 −62706−21 and hose Part No. 600−97000−53. Refer to Kit Drawing K601−62706.

NOTE: Make sure you keep all the clamps for the new installation.

(b) Install new drain hose Part No. K601 −62706−003 and elbow Part No.

N4EUB4 per Kit Drawing K601−62706.

NOTES: 1. Make sure that there is 0.5 in (12.7 mm) minimum clearance between the drain hose and structure, connector or any other components.

2. Make sure you install the short end of the elbow Part No.

N4EUB4 to the shroud Part No. 600−62247−1 and the long end to the drain hose Part No. K601−62706−003.

3. It is permissible to cut the drain hose to Part No.

K601−62706−003 to suit installation.

4. Keep the drain hose Part No. K601 −62706−003 as short as possible to prevent it from sagging.

5. Reclock the shroud between 5 o’clock and 8 o’clock position to achieve maximum possible clearance with the structure, connector and any other components.

MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 6 of 20

6. Replace teflon tape between shroud and clamps.

(c) Secure the drain hose Part No. K601 −62706−003 on the LH stringer No.3 at FS630.00 with the new clamping installation using the new standoff Part No. B0204046AA3−16T and associated hardware. It is permissible to install clamp on existing standoff or spacer with screw Part No.

NAS1801−3−20 and spacer Part No. NAS43DD3−32C. Refer to Kit Drawing K601−62706 and Figure 6.

(d) If after the installation of the new drain hose and fuel feed tube assembly the clearances still cannot be achieved, submit an SRPSA to Customer Support Engineering (CSE) for an approved rework by email at:

SRPSA@aero.bombardier.com for corrective action.

D. PART C: Modification − Replacement of the APU Negative−G Fuel Feed Tube Assembly (Applicable for aircraft, Serial No. 5914 to 5916 and 5919 to 5922)

(1) For aircraft Serial No. 5914 to 5916 and 5919 to 5922, you must replace the APU negative−G fuel feed tube assembly and the drain line. Do the steps that follow:

(a) Replace the APU negative −G fuel feed tube assembly Part No.

601−62706−31 with the new APU negative−G fuel feed tube assembly Part No. 604−62161−1, per Kit Drawing K601−62706. Refer to AMM 28−24−10−400−801.

NOTE: Make sure there is a second technician FWD of the bulkhead to hold the opposite coupling−nut on the bulkhead fitting While you loosen/torque the coupling−nut on the fuel feed tube assembly.

(i) Before the final installation of the shroud Part No. 600 −62247−1 onto the bulkhead flange, make sure there are no leaks of the APU negative−G fuel feed tube assembly. Do the leak check of the APU negative−G fuel feed line as follows:

a Connect the electrical power to the aircraft. Refer to AMM 24−00−00−861−801.

b In the flight compartment, on the overhead panel, push the switch/lights that follow:

i On the FUEL control panel, push in the left L BOOST PUMP switch/light.

ii Do a general visual inspection of the area around the connections of the new fuel−feed tube for fuel leaks. No leaks are permitted.

iii On the FUEL control panel, push out the left L BOOST PUMP switch/light.

(b) Install the new drain hose Part No. K601 −62706−003. Proceed to do Part B in Paragraph 2.C.

MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 7 of 20

(c) Do the final installation of the shroud Part No. 600 −62247−1 onto the bulkhead flange.

E. Testing

(1) Testing applicable to Part B:

(a) Do the pressure and blockage test of the shroud. Refer to AMM 28−24−10−780−801.

(2) Testing applicable to Part C:

(a) Do the pressure and blockage test of the shroud. Refer to AMM 28−24−10−780−801.

(b) Install the components as follows:

(i) Install the APU battery. Refer to AMM 24 −32−04−400−801.

(ii) Install the radio altimeter transceiver. Refer to AMM 34−44−01−400−801.

(iii) Install the LH wing anti −ice manifold duct (Part No. 14246−1). Refer to AMM 30−11−01−400−801.

(c) Do the operational test of the APU battery. Refer to AMM 24−32−04−710−801.

(d) Do the operational test of the radio altimeter transceiver. Refer to AMM 34−44−01−710−801.

(e) Do the leak test of the wing anti −ice duct manifold system. Refer to AMM 30−11−01−790−801.

F. Close −Out

(1) Remove all tools, equipment and unwanted materials from the work area.

(2) If removed, close the cargo compartment floor panels 241DLF and 241FLF.

Refer to AMM 53−01−01−400−803.

(3) Close the aft equipment compartment door (311BB).

G. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).

In an effort to improve the quality of our technical communications, we are requesting your feedback. Please take a moment to fill out our easy on−line Service Bulletin survey:

http://csefeedback.aero.bombardier.com MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 8 of 20

3. MATERIAL INFORMATION A. Kit Kit 605K28−009A may be necessary for aircraft, Serial No. 5701 to 5913, 5917, 5918, 5923 to 5970 to do this Service Bulletin and contains the parts that follow:

NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS-DISPOSITION B0204046AA3−16T 1 Standoff − − K601−62706−003 1 Drain Hose 28 in Length MIL−DTL−6000 M6000−04−00204 601−62706−21 Discard M85052/1−8 1 Clamp − − M85052/1−9 2 Clamp − − MS21042−3 1 Nut − − N4EUB4 1 Elbow − − NAS1801−3−7 1 Screw − − NAS1149F0332P 2 Washer − − NAS1801−3−9 1 Screw − − NAS43DD3−32FC 1 Spacer − − NAS1801−3−20 1 Screw − − Kit 605K28−009B is necessary for aircraft, Serial No. 5914 to 5916 and 5919 to 5922 to do this Service Bulletin and contains the parts that follow:

NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION B0204046AA3−16T 1 Standoff − − K601−62706−003 1 Drain Hose 28 in Length MIL−DTL−6000 M6000−04−00204 601−62706−21 Discard 604−62161−1 1 Tube Assembly,APU Fuel Feed 601−62706−31 Discard MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 9 of 20

NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS- DISPOSITION M85052/1−8 1 Clamp − − M85052/1−9 2 Clamp − − MS21042−3 1 Nut − − N4EUB4 1 Elbow − − NAS1801−3−7 1 Screw − − NAS1149F0332P 2 Washer − − NAS1801−3−9 1 Screw − − NAS43DD3−32FC 1 Spacer − − NAS1801−3−20 1 Screw − − NOTES: 1. In case of discrepancy between this list and the Service Bulletin Kit Parts List contained in the respective kit, then the latter list prevails.

2. The actual quantity for some of the hardware contained in the kit can be greater than the amount shown in the table as these items are supplied in prepackaged quantities B. Parts No parts required.

C. Materials The materials that follow, or equivalent, are necessary to do this Service Bulletin.

These can be purchased from a local supplier. Bombardier Aerospace does not pay for these consumables.

DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY

SUPPLIER (SEE NOTE) Leak Detector, Fuel System − A−A−59110 As Necessary Code: A MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 10 of 20

DESCRIPTION PARTNO./NAME SPECIFICATION QUANTITY

SUPPLIER (SEE NOTE) Tape, Teflon − A−A−59474 Type I Class 5 As Necessary Code: A NOTES: 1. Refer to the table that follows for each suppliers address listed by codes.

2. At time of release of this Service Bulletin, the information on the supplier was valid and accurate. In the event that this information has changed, the operator is encouraged to use the World Wide Web to find a local supplier.

SUPPLIERS ADDRESSES BY CODES Code: A Commercially Available D. Publications No publications required.

MODEL CL−600−2B16 Basic Issue: May 19/2015 605−28−009Page 11 of 20