From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2021-0030; AD 2021-10-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '9da9deb7e99a51b2b08c2a3a49cdf78bf044c72dbd5ec2063d2739e1cfb52ac6' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '9da9deb7e99a51b2b08c2a3a49cdf78bf044c72dbd5ec2063d2739e1cfb52ac6' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
MODIFICATION – REFUEL / DEFUEL SYSTEM –
REFUEL/DEFUEL LINE BRACKET REPLACEMENT The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.
RECOMMENDED
SPECIFIED TIME COMPLIANCE
COMPLIANCE TIME Within 30 months of Service Bulletin release (Basic Issue) EFFECTIVITY: A/C Serial No. 9657 to 9844 MANPOWER: 10 man−hours
CONTINUED AIRWORTHINESS (CAW)
FLEET CAMPAIGN NOYES TLMC, CH 5 AFFECTED NOYES KITS and/or PARTS YES NO
TOOLING/GSE YES NO
PLANNING INFORMATION NOYES
DEDICATED SCHEDULE NOYES PREREQUISITE SERVICE BULLETINS: N/A NOTE: This Service Bulletin will be subject to an Airworthiness Directive (AD) which will make it necessary to implement this Service Bulletin.
To place an order for parts or kits, please call Bombardier Aviation Parts Services at:
514−855−2999 or 1−866−538−1247
SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL BD−700−1A10 (BD−700) ATA 28−23 FUEL Basic Issue: Jun 01/2020 700−28−6006 Page 1 of 1 This Service Bulletin is available at:
MODIFICATION – REFUEL / DEFUEL SYSTEM –
REFUEL/DEFUEL LINE BRACKET REPLACEMENT
1. PLANNING INFORMATION NOTE: Before you do this Service Bulletin, examine all STC, STA or equivalent action changes to make sure that this Service Bulletin can be completed.
A. Effectivity BD−700−1A10 aircraft, Serial No. 9657 to 9844.
NOTE: The instructions in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aviation Service Bulletin(s).
B. Reason Evidence:
A supplier reported to Bombardier that a bracket had been mislocated during aircraft assembly on the intermediate rib in the center fuel tank during installation.
This condition may result in an undesirable offset and gap between the refuel/defuel tube and the mating adjacent fuel fitting.
Objective/Benefit:
This Service Bulletin replaces the existing mislocated bracket with new modified bracket to ensure proper alignment of fuel tube and fitting.
C. Description This Service Bulletin gives instructions to:
− Remove and discard the hydraflow coupling and sleeve from the fuel lines,
SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL BD−700−1A10 (BD−700) ATA 28−23 FUEL Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.
This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.
2020 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.
Basic Issue: Jun 01/2020 700−28−6006 Page 1 of 12 This Service Bulletin is available at:
− Remove and discard the clamp from the bracket, − Visually inspect the refuel/defuel tube for damage, − If damage is found, remove and replace the tube, − Remove and re−locate the bracket with a new modified bracket assembly, − Install a new clamp, o−rings and hydraflow coupling and close out the area, and − Do the necessary test of the refuel/defuel system.
D. Compliance Recommended within 30 months from this Service Bulletin release date (Basic Issue).
NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the aircraft configuration, submit an SRPSA for an analysis and to get an approved disposition to complete this Service Bulletin.
E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.
NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.
2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU bilateral Aviation Safety Agreement.
F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this Service Bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.
For more information related to the man−hours, refer to SB 700−00−6002.
2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.
10 man−hours are necessary to do this modification.
The labor required to do this Service Bulletin is at no cost if:
− the work is done at Bombardier Business Aviation Services (BBAS) or Authorized Service Facilities (ASF), and MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 2 of 12
− this Service Bulletin is scheduled in less than 30 months from its release date (Basic Issue).
G. Material − Cost and Availability Kit 700K28−6006 is necessary to do this modification.
KIT NO. PRICE 700K28−6006 Please contact Bombardier Aviation Parts Services, in Montreal, for delivery lead times and pricing.
Sufficient kits will be kept for the estimated amount of orders.
In addition to the kit shown above, the parts in Paragraph 3.B. and material in Paragraph 3.C. are necessary to do this modification.
This kit is available at no cost if:
− a no−charge purchase order is sent to Bombardier Aviation in less than 30 months from this Service Bulletin release date (Basic Issue).
H. Tooling The equipment and tools listed below are necessary to do this modification.
GSE REFERENCE NO. PART NO. DESCRIPTION 20X−10−01 − Tag, Circuit Breaker(Red Ring) NOTES: 1. Refer to the Global 6000 BD−700 Illustrated Tool and Equipment Manual (ITEM) to make sure that you use the correct equipment configuration.
2. Refer to the Liability Statement in the ITEM for the G6000, for acceptable GSE equivalents.
I. Weight and Balance No Change.
J. Electrical Load Data No Change.
K. References − TCCA Airworthiness Directive (Pending).
− Bombardier Aviation, Modification Summary, R700T400724, Rev. A.
MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 3 of 12
− Bombardier Aviation, Kit Drawing KGC991−1612, Rev. A.
− Global 6000 BD−700 Aircraft Maintenance Manual (AMM), Chapters 6, 24, 28 and 53.
− Global 6000 BD−700 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.
− Bombardier Aviation, Standard Practices Manual (SPM), Chapter 20.
− Bombardier Aviation, Structural Repair Manual (SRM), Chapter 51.
L. Other Publications Affected − Global 6000 BD−700 Aircraft Illustrated Parts Catalog (AIPC), Chapter 28.
M. Equivalent Service Bulletins None.
2. ACCOMPLISHMENT INSTRUCTIONS NOTES: 1. All TASKs given in the procedures that follow are from the Global 6000 BD−700−1A10, Aircraft Maintenance Manual (AMM) unless otherwise specified.
2. All references made to zones, access panels and/or doors, are from the Global 6000 BD−700−1A10, Aircraft Maintenance Manual (AMM), Chapter 6.
A. Aircraft Setup NOTE: The steps in the Aircraft Setup section of this Service Bulletin are recommended steps. The steps give a recommendation to get access to the work area. This recommendation is to give a safe work area and to minimize possible damage to surrounding aircraft parts. Alternative steps can be used at the operator’s discretion.
(1) Obey all electrical/electronic safety precautions. Refer to AMM 24−00−00−910−801.
(2) Obey the fuel−system safety precautions. Refer to AMM 28−00−00−910−801.
(3) Prepare the fuel tank for access. Refer to AMM 28−10−00−840−801.
(4) Remove the belly fairing access−panel 183BB. Refer to AMM 53−61−19−000−801.
(5) Remove the wing−tank access panels 183AZ and 183BZ. Refer to AMM 28−11−01−000−801.
NOTE: The second panel needs to be opened to allow fuel tank venting.
MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 4 of 12
B. Modification NOTE: If it is not possible to complete all the instructions in this Service Bulletin because of the configuration of the aircraft, submit a SRPSA for an analysis and to get an approved disposition to complete this Service Bulletin.
(1) On the intermediate rib assy, Part No. GM229−1302−7 at FS 698.75 and LBL 27.00, locate the refuel tube assy, Part No. GM428−7227−1, the clamp, Part No. MS21919WDF16 and bracket, Part No. GM427−7317−11. Refer to Figure 1.
(2) Remove and discard the screw, Part No. MS35207−263, washer, Part No.
AN960JD10L, clamp, Part No. MS21919WDF16 and bracket, Part No.
GM427−7317−11.
(3) Remove and discard the o−rings, Part No. M25988/1−214 and coupling sleeve assy, Part No. 14J02−16A.
(4) Perform the visual inspection. Refer to Figure 1 (Sheet 2).
(a) Inspect refuel tube assy, Part No. GM428−7227−1 to ensure there are no indications of damage such as permanent deformation, corrosion, cracks, gouges, dents, or deep scratches.
(b) Perform a detail visual inspection of 10X magnification of the elbow sections of refuel tube assy, Part No. GM428−7227−1 to ensure there are no indication of cracks or any other damage such as damaged paint, permanent deformation, corrosion, gouges, dents, or deep scratches.
(c) If any damage is found outside of allowable damage limits, refer to SPM−MM 20−22−00−910−805.
(i) Remove and replace the refuel tube assy, Part No. GM428−7227−1.
NOTE: Ensure there is no preload condition when reinstalling refuel tube assy, Part No. GM428−7227−1.
(ii) Install 2 new o−rings and coupling assy at the other extremity of the fuel tube. Refer to SPM−MM 20−30−00−910−808.
(d) If no damage is found outside of allowable damage limits, it is permissible to retain existing fuel tube assy, Part No. GM428−7227−1.
(5) Install nutplate, Part No. MS21061L3 on bracket, Part No. GC427−0031−1, using rivets, Part No. MS20426AD3−4, as shown on Figure 1, Detail E. Refer to SRM 51−42−08.
NOTE: If required, it is permissible to adjust the grip length of rivets, Part No.
MS20426AD3−4.
(6) Temporarily install the clamp, Part No. MS21919WDF16 on bracket assy, Part No. GC427−0031−1 and locate bracket assy as per Figure 1, Detail C and D.
Do not drill at this time.
NOTE: Make sure offset between refuel tube assy and fitting assy is less than
0.063 in. (1.60 mm), gap between fittings is 0.150 in. ± 0.050 in.
(3.81 mm ± 1.27 mm) and maximum misalignment of the tube axes does not exceed 2 degrees. Refer to Figure 1, Detail F.
MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 5 of 12
(7) Backdrill holes from structure to the bracket and secure temporarily.
(8) Install the new bracket, Part No. GC427−0031−1 with rivets, Part No.
MS20470AD4−6 on the intermediate rib assy, Part No. GM229−1302−7 at FS 698.75 and LBL 27.00. Refer to SRM 51−42−08 and Figure 1.
NOTE: If required, it is permissible to adjust the grip length of rivets, Part No.
MS20426AD3−4.
(9) Install the new o−rings, Part No. M25988/1−214 and new coupling assy, Part No.14J02−16A on the fitting assy, Part No. GM427−7211−1 and refuel tube assy, Part No. GM428−7227−1. Refer to SPM−MM 20−30−00−910−808.
NOTES: 1. Ensure there is no preload condition when reinstalling coupling assy.
2. Make sure offset between refuel tube assy, Part No.
GM428−7227−1 and fitting assy, Part No. GM427−7211−1 is less than 0.063 in. (1.60 mm), gap is 0.150 in. ± 0.050 in.
(3.81 mm ± 1.27 mm) and maximum misalignment of the tube axes does not exceed 2 degrees. Refer to Figure 1, Detail F.
(10) Visually inspect that the bonding spring has correct contact with the ferrule during the installation of coupling, Part No. 14J02−16A.
(11) Install the new clamp, Part No. MS21919WDF16 with screw, Part No.
MS35207−263, washer, Part No. NAS1149D0332J on the bracket, Part No. GC427−0031−1 and refuel tube assy, Part No. GM428−7227−1. Refer to SRM 51−41−04
(12) Touch up the reworked areas as per the finish code A022. Refer to SRM 51−01−04.
C. Testing
(1) Close the fuel tank after maintenance. Refer to AMM 28−10−00−840−803.
(2) Install the belly fairing access−panel 183BB. Refer to AMM 53−61−19−400−801.
(3) Install the wing−tank access panels 183AZ and 183BZ. Refer to AMM 28−11−01−400−801.
(4) Do the Operational test of the refuel/defuel system. Refer to AMM 28−23−00−710−801.
D. Close−out NOTE: The steps in the Close−out section of this Service Bulletin, except for the return−to−service tests, are recommended steps. The steps give a recommendation to install components removed during the Aircraft Setup.
This recommendation is to make sure that the aircraft is safe and ready to return to service. Alternative steps can be used at the operator’s discretion.
Remove all tools, equipment and unwanted materials from the aircraft.
MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 6 of 12
E. Recording When this Service Bulletin is completed, make an entry in the aircraft log and send the attached Incorporation Notice to Bombardier Business Aircraft Customer Services (BBACS).
For information, correction(s), comment(s) and/or feedback regarding Service Bulletins released on the Customer Portal, please contact the Service Bulletin Group at the following email address:
bbad_SBgroup@aero.bombardier.com
3. MATERIAL INFORMATION A. Kit Kit 700K28−6006 is necessary to do this Service Bulletin and contains the parts that follow:
NEW PART NO. QTY ITEM USED PARTNO. INSTRUCTIONS-DISPOSITION GC427−0031−1 1 Bracket − − M25988/1−214 2 O−Ring − − MS20426AD3−4 2 Rivet, CSK − − MS20470AD4−6 3 Rivet, UNIHead − − MS21061L3 1 Nutplate − − MS21919WDF16 1 Clamp − − MS35207−263 1 Screw − − NAS1149D0332J 1 Washer − − 14J02−16A 1 Coupling − − B. Parts The parts that follow are necessary to do this Service Bulletin and are available from Bombardier Aviation Parts Services, Montreal:
MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 7 of 12
NEW PART NO. QTY ITEM USEDPART NO. INSTRUCTIONS-DISPOSITION GM428−7227−1 (See Note 2) 1 Refuel Tube Assy − − M25988/1−214 (See Note 2) 2 O−Ring − − NOTES: 1. The part number for the item listed above is subject to change without revision to this Service Bulletin. In case of discrepancy between this list and any other list, the Illustrated Parts Catalog prevails and shall be used to determine the latest part number.
2. The refuel tube assy and o−rings are required to replace only if found damaged during inspection.
C. Material The material that follows is necessary to do this Service Bulletin. It can be purchased from a local supplier. Bombardier Aviation does not pay for this consumable.
DESCRIPTION PART NO./NAME SPECIFICATION QUANTITY
SUPPLIER (SEE NOTE) Coating Chemical Conversion Alodine 1200S MIL−DTL−81706Class 1A AsRequired Code: A NOTES: 1. Refer to the table that follows for supplier address listed by code.
2. At time of release of this Service Bulletin, the information on the supplier was valid and accurate. In the event that this information has changed, the operator is encouraged to use the World Wide Web to find a local supplier.
SUPPLIERS ADDRESSES BY CODES Code: A Henkel Loctite Corp.
1001 Trout Brook Crossing, Rocky Hill, CT, 06067−3910 U.S.A.
Tel.: 1−860−571−5100 Fax.: 1−860−571−5465 www.loctite.com MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 8 of 12
D. Publications No publications required.
MODEL BD−700−1A10 (BD−700) Basic Issue: Jun 01/2020 700−28−6006 Page 9 of 12
SB700−28−6006_001 LBL27.00 FS701.69 FS701.69 MODEL BD−700−1A10 (BD−700) Centre Wing, Refuel/Defuel Line Bracket Replacement Figure 1 (Sheet 1 of 3) Basic Issue: Jun 01/2020 700−28−6006 Page 10 of 12
M25988/1−214 (O−RING) M25988/1−214 (O−RING) GM427−7317−11 (BRACKET) MS21919WDF16 (CLAMP) AN960JD10L (WASHER) MS35207−263 (SCREW) NAS1149D0332J (WASHER) MS35207−263 (SCREW) MS21919WDF16 (CLAMP) GC427−0031−1 (BRACKET) GM428−7227−1 (TUBE ASSEMBLY) 14J02−16A (COUPLING) 14J02−16A (COUPLING) M25988/1−214 (O−RING) M25988/1−214 (O−RING)
PRE MOD
POST MOD
SYMBOL WORK
PART DISCARDED IN
REMOVAL TASK GM427−7211−1 (FITTING ASSEMBLY) (REF) GM427−7211−1 (FITTING ASSEMBLY) (REF) LBL27.00LBL27.00 GM428−7227−1 (TUBE ASSEMBLY) NO 3 STGR DATUM PLANENO 3 STGR
DATUM PLANE MS21061L3 (NUTPLATE) MS20470AD4−6 (RIVET) (3 PLACES) MS20426AD3−4 (RIVET) (2 PLACES) GM229−1302−7 (REF) GM229−1302−7 (REF) SB700−28−6006_002 MODEL BD−700−1A10 (BD−700) Centre Wing, Refuel/Defuel Line Bracket Replacement Figure 1 (Sheet 2 of 3) Basic Issue: Jun 01/2020 700−28−6006 Page 11 of 12