Service bulletin · Bombardier

Revision 01700-34-7523 Rev 1 · 77 pages · 7.1 MB

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0684; AD 2022-27-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2022-0684 (document 0006) · AD 2022-27-02

Manufacturer
Bombardier
Type
Service Bulletin
Number
700-34-7523
Latest revision known
700-34-7523, Revision 01, dated December 8, 2021

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 77Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2022-0684; AD 2022-27-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '30366ca7ac31f9bce72fdf9248e0bf6c7b4b097c26e4cfda436fadbf3c417d1e'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Discard the Basic Issue of this Service Bulletin dated April 30/2021, and replace in its entirety with Revision 01.

Service Bulletin No. 700−34−7523 Date of Basic Issue Apr 01/2021 Revision No. 01 Dated Dec 08/2021 For action applicable to aircraft on which the Basic Issue of this Service Bulletin was done, refer to the retroactive action box on Page 1 of this Service Bulletin.

This revision is a complete reissue, therefore revision bars were intentionally omitted.

This revision is issued to:

1. Revise, in the Pilots Information Sheet, the AFM revision and the recording statement.

2. Revise, in the Service Bulletin Summary Sheet, the compliance time. Add a NOTE regarding the Airworthiness Directive (AD).

3. Add a retroactive action in Page 1.

4. Update, in Paragraph 1, to clarify Notes 8 and 10 statements. Add NOTE regarding the Airworthiness Directive (AD).

5. Add, in Paragraph 1, a NOTE 12 to review a training video.

6. Revise Paragraph 1.B. to clarify the root cause #3.

7. Revise Paragraph 1.C. to change the sequence of steps.

8. Revise, in Paragraph 1.D., the compliance date. Add NOTE regarding the Airworthiness Directive (AD).

9. Add, in Paragraph 1.H., NOTES 4 and 8.

SERVICE BULLETIN MODEL BD−700−2A12 (BD−700) 700−34−7523 Page 1 of 2

REVISION TRANSMITTAL SHEET

10.Update, in Paragraph 1.K., 2.B.(1), and 2.B.(5), the Report Number RAE−BA700−229 to Rev. D, and Rockwell Collins, document 946−9118−001, to Rev. E.

11.Update, in Paragraph 1.L., the AFM revision.

12.Add, in Paragraphs 2.B.(1)(a) and 2.B.(1)(c), the Z values for the golden rivets location.

13.Correct, in Paragraph 2.B.(1)(c), External Target Board table, the tolerance values in centimeter.

14.Change the sequence of steps in Paragraph 2.B. − Modification, to avoid the installation of the AMAT tool on the older hard mounting points, according to Report Number RAE−BA700−229, Rev. D, and Rockwell Collins, document 946−9118−001, Rev.E.

15.Updated illustrations to reflect the new External Target Board Assembly design and revised per document 946−9118−001 Rev. E.

16.Add Paragraph 2.C.(3), to inform the evidences shall be reviewed.

17.Add, in Paragraph 2.D, new steps 1 and 2.

18.Revise, in Paragraph 2.D.(3), to clarify the step.

19.Update, in Paragraph 3.D., the AFM revision.

20.Make miscellaneous minor changes, as necessary, with no change of context.

MODEL BD−700−2A12 (BD−700) 700−34−7523 Page 2 of 2

MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –

SECOND HUD CALIBRATION PROCEDURES A. Objective It has been reported the Heads Up Display (HUD) may not be sufficiently aligned for Enhanced Flight Vision System (EFVS) or Steep Approach operations. Installation of the HUD requires an angular accuracy to within 5.0 mrad (0.286°). It has been discovered on several aircraft, that the installation had a misalignment greater than 5.0 mrad (0.286°).

The Steep Approach or EFVS operations are not permitted until the accuracy of the HUD has been verified and corrected if necessary.

This Service Bulletin is issued to correct the HUD installation and alignment.

B. Systems Impacted Enhanced Flight Vision System (EFVS) or Steep Approach operations.

C. Flight Compartment Procedure Impacted Not applicable.

D. Passenger Compartment Procedure Impacted Not applicable.

E. Pilot Training Not applicable.

F. AFM References − Airplane Flight Manual (AFM), CSP 700−7000−1, Revision 14 dated Oct 21/2021.

G. Additional Information Not applicable.

MODEL BD−700−2A12 (BD−700) ATA 34−32

NAVIGATION Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 1 of 2

PILOTS INFORMATION SHEET

H. Flight Planning Information Not applicable.

J. Recording After Service Bulletin 700−34−7523 is incorporated, make sure to update the aircraft logbook to show that Service Bulletin 700−34−7523 (Revision 01) as incorporated and if applicable provide a copy of the Pilot Information Sheet to the flight crew and revise AFM 01−00−General to include this Service Bulletin.

MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 2 of 2

MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –

SECOND HUD CALIBRATION PROCEDURES The information below is provided for your reference. For full details, including labor and part coverage, please see corresponding paragraph contained within this bulletin.

RECOMMENDED

SPECIFIED TIME COMPLIANCE

COMPLIANCE TIME Recommended before February/2024 EFFECTIVITY: A/C Serial No. 70036, 70044, 70055 and 70062 MANPOWER: 69 man−hours

CONTINUED AIRWORTHINESS (CAW)

FLEET CAMPAIGN YES NO

AIRWORTHINESS LIMITATIONS (AWL) NOYES KITS and/or PARTS YES NO

TOOLING/GSE YES NO PLANNING INFORMATION: See important information at the start of Paragraph 1. YES NO

DEDICATED SCHEDULE YES NO PREREQUISITE SERVICE BULLETINS: N/A NOTES: 1. Bombardier recommends that the Service Bulletin 700−34−7521 be done at the same time as Service Bulletin 700−34−7523.

2. This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA, AD CF−2021−36.

To place an order for parts or kits, please call Bombardier Aviation Parts Services at:

514−855−2999 or 1−866−538−1247

SERVICE BULLETIN SUMMARY my.businessaircraft.bombardier.com MODEL BD−700−2A12 (BD−700) ATA 34−32

NAVIGATION Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 1 of 1 This Service Bulletin is available at:

MODIFICATION – HEAD UP DISPLAY (HUD) SYSTEM –

SECOND HUD CALIBRATION PROCEDURES

RETROACTIVE ACTION

THE ACTION THAT FOLLOWS IS RECOMMENDED FOR AIRCRAFT ON WHICH THE BASIC ISSUE OF THIS SERVICE BULLETIN WAS DONE:

A typographical error on the metric values on the External Target Board table has been corrected for Service Bulletin 700−34−7523 Basic Issue. If the operator has used the imperial values, then no action is required.

If the operator has used the metric values, then review the collected Evidence #1, the Laser Tracker Report, to verify if the target was aligned in accordance to the values listed on Service Bulletin 700−34−7523 Revision 01, step 2.B.(1)(c). If the Evidence #1, the Laser Tracker Report shows the target board alignment outside the tolerances from the Service Bulletin 700−34−7523 Revision 01, step 2.B.(1)(c), then perform the Service Bulletin 700−34−7523 Revision 01 to ensure correct HUD alignment.

1. PLANNING INFORMATION NOTES:1 . Before you do this Service Bulletin, examine all STC, STA or equivalent action changes to make sure that this Service Bulletin can be completed.

2. For any technical issues, contact CSE, Technical Support, Global Express by e−mail at SRPSA@aero.bombardier.com.

3. Due to complexity, this Service Bulletin needs to be performed at specific Bombardier Aviation Service Centers due to limited specialized tooling.

Contact the In−Service Implementation Team (ISIT) prior to scheduling your aircraft to confirm availability during your down time.

SERVICE BULLETIN my.businessaircraft.bombardier.com MODEL BD−700−2A12 (BD−700) ATA 34−32

NAVIGATION Refer to applicable governmental agency regulations and requirements and make sure that the work described in this Service Bulletin is performed in compliance with manufacturer’s recommendations and/or acceptable industry standards.

This document is proprietary to Bombardier Inc. and/or its affiliates and may not be reproduced or copied in any form or by any means without the prior written consent of Bombardier Inc. and/or its affiliates.

 2021 Bombardier Inc. All rights reserved Learjet, Challenger, Global, are registered trademarks of Bombardier Inc. or its subsidiaries.

Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 1 of 65 This Service Bulletin is available at:

4. Bombardier Aviation Service Centers may contract a third party entity to Set−Up the Target Board in front of the aircraft using laser tracking device or a theodolite. The third party entity will use their own laser equipment or theodolite and will supply the laser tracker report of the aircraft leveling and Target Board placement.

5. This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.

For more information on dedicated schedules, refer to SB 700−00−7502.

6. The removal and installation of the RHS windshield is required to perform this Service Bulletin.

It is recommended to incorporate the following In−Service Modifications while reinstalling the windshield:

− IS700−53−7001 part A (sealing plates).

− IS700−53−7002 (additional sealant).

7. Bombardier recommends that the Service Bulletin 700−34−7521 be done at the same time as Service Bulletin 700−34−7523.

8. Make sure there is enough space in front of the aircraft to place the Target Board. The distance from the nose landing gear wheel center to target:

431 in (10.95 m). The target board area must be clear of any condition that could cause movement. A barrier tape can be installed around it to avoid accidental impact to of the target board.

9. Note that the HUD alignment is verified with and without the windshield installed. If the windshield fails this test, it must be replaced.

10.After the Target Board has been aligned in front of the aircraft with laser tracker, the access to AFT of the aircraft, behind FS727 (inside the cabin or outside the aircraft) should be avoided. No moving of flaps either. This is to ensure that the alignment of the Target Board in reference to the aircraft remains undisturbed until the collection of the all evidences (Tables 2 and 3).

11.Since the windshield installation has to be performed with the aircraft on jacks, make sure that access to the windshield is possible. Some of the stands usually used for windshield removal installation may not be suitable for usage when the aircraft is elevated on jacks.

MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 2 of 65

12.All the steps to collect Evidences #5 and #6, including the proper Collins’s technique for PUSH, PULL and RELEASE of the Combiner, are documented in the attached video (Appendix 1) titled "How to record HUD Combiner image (evidences #5 and #6) per Strategia TT−237.mp4".

Review this training video before starting the procedure.

13.This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA, AD CF−2021−36.

A. Effectivity BD−700−2A12 aircraft, Serial No. 70036, 70044, 70055 and 70062.

NOTE: The instructions given in this Service Bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Aviation Service Bulletin(s).

B. Reason

1. Condition:

It has been reported the Heads Up Display (HUD) may not be sufficiently aligned for Enhanced Flight Vision System (EFVS) or Steep Approach operations.

Installation of the HUD requires an angular accuracy to within 5.0 mrad (0.286°). It has been discovered on several aircraft, that the installation had a misalignment greater than 5.0 mrad (0.286°).

The Steep Approach or EFVS operations are not permitted until the accuracy of the HUD has been verified and corrected if necessary.

2. Evidence:

The root causes of HUD misalignment have been identified as follows:

Source #1 − AMAT mishandling and workmanship issues.

Performing HUD alignment using an out of calibration AMAT causes HUD image misalignment.

Note that an AMAT metrology report or a HUD Combiner picture (taken properly using the ERP tool) can show that this kind of misalignment has been introduced.

The current procedure has been updated with additional AMAT instructions to help prevent AMAT mishandling and workmanship issues causing the tool to become out of calibration.

Source #2 − epoxy curing time too short.

MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 3 of 65

It has been demonstrated that a HUD Combiner installation performed when the epoxy has not cured for long enough, will cause the Combiner hard mounting point to become misaligned. Therefore, it is now requested 48 hours curing time before installation of the Combiner (i.e. before torqueing of the Combiner Channel fasteners). The current procedure has been updated to account for the new epoxy curing time. Furthermore, it has also been demonstrated that an AMAT telescope picture cannot capture to its full extent deviations of the Combiner hard mounting point caused by this epoxy/torqueing issue. This is an AMAT limitation that was previously unknown. Only a HUD Combiner picture taken properly using the ERP tool can show that this kind of misalignment has been introduced.

The current procedure has been updated to collect the HUD Combiner picture and use it as additional PASS/FAIL criteria.

Source #3 − optical issues with the windshield.

For the HUD Model 6600 to meet the required angular accuracy, the total HUD system display boresight accuracy error budget must be less than or equal to 5.0 mrad. To achieve the goal of staying within that budget, track must be kept of the contributing error of each component in the HUD system and its installation. This is done along both the horizontal and the vertical axis.

HUD installation is one component of that error budget, where the AMAT telescope is pointing to the external Target Board looking through the windshield. The Global 7500 windshield is also a source of error. The magnitude of the windshield refraction offsets had never been measured until November 2020. The results of the windshield sampling measured were more scattered than anticipated for the windshields manufactured initially. It was known that some windshields did not meet the error limit allocated to the windshield. Consequently, a new HUD alignment method had to be developed and the windshield manufacturing control process had to be looked at. The new method continues to enable the HUD system to meet the requirement on boresight accuracy.

To increase the tolerance for windshield error:

− Perform the HUD alignment without the windshield installed.

− Perform the HUD alignment closer to the center of the Target Circle.

3. Objective/Benefit:

This Service Bulletin is issued to correct the HUD installation and alignment.

C. Description This Service Bulletin gives instructions to:

− Remove the RHS windshield − Set−up the External Target Board, − Remove Overhead Unit (OHU) and Combiner, − Align the HUD mounting hard points, − Install the RHS windshield, MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 4 of 65

− Do the “windshield verification target” procedure, and replace the RHS windshield if required, − Remove the AMAT, install OHU and combiner, − Do the “HUD System error verification” procedure, − Collect all eight evidences (listed in Tables 2 and 3) and store them, along with page 5 of the Appendix 1, in the location specified in Appendix 1, and − Realign the EVS with the new HUD alignment position.

D. Compliance Specified Time Compliance NOTES: 1. Bombardier Aviation recommends that this Service Bulletin be done before February/2024.

2. If it is not possible to complete all the instructions in this Service Bulletin because of the aircraft configuration, submit an SRPSA for analysis and to get an approved disposition to complete this Service Bulletin.

3. This Service Bulletin is in reference to Advisory Wire AW700−34−0797.

4. This Service Bulletin is mandated by Airworthiness Directive (AD) TCCA, AD CF−2021−36.

E. Approval The technical content of this Service Bulletin has been approved under the authority of Transport Canada Civil Aviation (TCCA) Design Approval Organization (DAO) No. DAO #93−Q−02.

NOTES: 1. The technical content of this Service Bulletin is accepted by the FAA under the Canada/USA bilateral Aviation Safety Agreement.

2. The technical content of this Service Bulletin is accepted by EASA under the Canada/EU Bilateral Aviation Safety Agreement.

F. Manpower NOTES: 1. The man−hours given are to help you schedule the tasks given in this Service Bulletin. The man−hours are for direct labor performed by an experienced crew and do not include the time for familiarization, planning, aircraft preparation in hangar such as towing and positioning of scaffolds, removal of interior furnishings, repainting, supervision and inspection.

For more information related to the manpower, refer to SB 700−00−7502.

MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 5 of 65

2. This Service Bulletin may require consumable materials that have specific curing times (refer to Paragraph 3). The accumulated curing time is not included in the man−hours and should be considered for planning purposes before you schedule this Service Bulletin.

3. Labor hours are based on the fact that the modification will be done at the next scheduled maintenance task or inspection. Therefore no man−hours are allotted to prepare the aircraft for maintenance or to prepare for this Service Bulletin.

69 man−hours are necessary to do this modification.

The labor required to do this Service Bulletin is at no cost if:

− the work is done at Bombardier Business Aviation Services (BBAS), and − this Service Bulletin is scheduled before April/2022.

G. Material − Cost and Availability No kit is necessary to do this modification.

The parts in Paragraph 3.B. are necessary to do this modification.

The parts are available at no cost if:

− ordered during new aircraft warranty period, and − a no−charge purchase order is sent to Bombardier Aviation before April/2022.

This Service Bulletin is covered by a dedicated schedule. Dedicated schedules are used to reserve and manage inventory due to limited availability of rotable stock, parts and/or kits. Parts are limited, therefore, advance part scheduling with our In−Service Implementation Team (ISIT) is recommended prior to a maintenance visit. Please contact your Regional Manager (RM), Field Service Representative (FSR) or Customer Service Representative (CSR) to schedule your aircraft as there is a limited availability. The parts will be allocated on a first come first serve basis.

For more information on dedicated schedules, refer to SB 700−00−7502.

For all parts transactions, Bombardier Aviation’s current Spare Parts and Component Repair Price Catalogue General Terms and Conditions apply. These terms and conditions are found on the Bombardier Customer Portal at:

my.businessaircraft.bombardier.com Smart Parts does not pay for this recommended Service Bulletin at any time.

H. Tooling The equipment and tools listed below are necessary to do this modification:

MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 6 of 65

GSE REFERENCE NO. PART NO. DESCRIPTION 20X−10−01 S4933959−501 Tag, Circuit Breaker 34X78K−33−01 4500−5247−001 Target Board AlignmentFrame 34X78K−33−03 4500−6195−001 Eye Ref Point Locator,Right HUD 34X78K−33−05 232−0 Brunson Stand 34X78K−33−06 235−20 Brunson Adapter Plate 34X78K−33−08 4500−6771−001 or 4500−4826−001 (alternate) RHS Aircraft Mounting and Alignment Tool (AMAT) 34X78K−33−10 G05318500−001−SFIX01 External Target Board Assembly for HUD (without windshield) and EVS (See Note 8) Commercially Available − HD Camera (minimum 4032 x 3024 pixels) Commercially Available − Tripod for Camera Commercially Available − Laser tracking device or Theodolite (See Note 7) NOTES: 1. Refer to the Global 7500 Illustrated Tool and Equipment Publication (ITEP) to make sure that you use the correct equipment configuration.

2. Refer to the Liability Statement in the ITEP for the G7500 for acceptable GSE equivalents.

3. This list is provided for quick reference. In case of discrepancy between this list and the tools called in the AMP, WM, Chapter 20, then the tools called in the AMP, WM prevail. Other approved alternative tools are acceptable and can also be used.

4. Alternate Target Board Alignment Frames and stands may be used so long as the Target Board is located in a stable manner to the coordinates provided in the current procedure.

MODEL BD−700−2A12 (BD−700) Basic Issue: Apr 01/2021 Revision 01: Dec 08/2021 700−34−7523 Page 7 of 65