Service bulletin · Bombardier

Revision C84-28-21C - Released Copy · 114 pages · 2.4 MB

© Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0726; AD 2020-04-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2019-0726 (document 0005) · AD 2020-04-20

Manufacturer
Bombardier
Type
Service Bulletin
Number
84-28-21
Latest revision known
84-28-21, Revision C, dated July 13, 2018

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 2

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 2 proposed ADs.

Text · 114

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Bombardier Inc. Filed by the FAA in regulations.gov docket FAA-2019-0726; AD 2020-04-20 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'e337ed6194af759a2fd86a84f3308444b467abba84d371148e794775a6c250b9'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Revision ‘C’ 13 Jul 2018 D H C --- 8 ( D A S H 8 ) S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 Fuel - - - Fuel System - - - Wing - - - Introduction of High Resistance Isolators, Flexible Anodized and Threaded Rigid Couplings and Bracket Supports for Fuel Pipes to Address Wear and Corrosion - - - ModSum 4 - - - 113970 This page transmits Revision ‘C’ of Service Bulletin 84- - -28- - -21, pages 1 thru 110 dated 13 Jul 2018.

This service bulletin is re- - -issued in its entirety for the reasons that follow:

--- t h eReferences section revised to convey the latest revision of the service bulletin and engineering documentation --- Figure 29 and Figure 30 were revised to update electrical bonding measurement instructions with correct table numbers and test point locations in section R1, R10 and R11 per 8Z10149 sheet 1.1 revision R.

The Compliance i n R e v i s i o n B o f S B 8 4 --- 2 8 --- 2 1 i s n o t a f f e c t e d b y t h i s revision. However, the Compliance in Revision A of SB 84- - -28- - -21 is affected by this revision if Revision B of SB 84- - -28- - -21, IS4Q2800032 Revision A, or one of the qualifying Airworthiness Change Requests (ACRs) has not been incorporated yet. Qualifying ACRs will be listed in the Airworthiness Directive (Pending).

SB 84- - -28- - -21 Revision B included electrical bonding measurements of the rigid couplings installation on the vent line (reference drawing 8Z10149 Sheet 1.1 Section R) Flagnote R4) Subnote B)). Aircraft which have incorporated SB 84- - -28- - -21 Revision A that have also incorporated IS4Q2800032 Revision A have completed the electrical bonding measurements of the rigid coupling installation on the vent line and therefore do not require additional rework. Operators incorporating Revision A of SB 84- - -28- - -21 and also required to complete FSL 284000- - -417, required an Airworthiness Change Request (ACR) to identify the electrical bonding test points in FSL 284000- - -417 applicable to post mod 4- - -113970 (SB 84- - -28- - -21) configuration. The ACR also incorporated the electrical bonding measurements for the rigid couplings installed on the vent line.

Electrical bonding of the rigid coupling installation was completed on verification aircraft S/N 4490. No additional rework to MSN 4490 is introduced by this revision.

The following clarification is provided for the electrical bonding test points in sections R1, R10 and R11 that were updated per 8Z10149 sheet 1.1 revision R in SB 84- - -28- - -21 Revision C. The test points revised in R1, R10 and R11 have the same test locations and resistance values as the test points specified in SB 84- - -28- - -21 Revision A and Revision B. These test points were re- - -identified in SB 84- - -28- - -21 Revision C to reflect the release of T ask Card 000- - -28- - -520- - -713 (Config A02) and T ask Card 000- - -28- - -620- - -713 (Config A02). The test points listed in SB 84- - -28- - -21 Revision A and Revision B are based on T ask Card 000- - -28- - -520- - -713 (Config A01) and T ask Card 000- - -28- - -620- - -713 (Config A01) and are equivalent to the re- - -identified test points in SB 84- - -28- - -21 Revision C. The resistance measurements of the revised and original R1, R10 and R11 test points carried out in accordance with T ask Card (Config A02) and T ask Card (Config A01), respectively, both satisfy the intent of the return to service electrical bonding measurements.

The initial issue of this Service Bulletin was issued to one customer for aircraft ”release to service” of verification aircraft S/N 4490 only.

Remove the previous revision of Service Bulletin 84- - -28- - -21 and replace with attached.

Previous issue of Service Bulletin 84- - -28- - -21:

Initial issue - - - Pages 1 thru 100 dated 31 Aug 2017 Revision ’A’ - - - Pages 1 thru 110 dated 29 Sep 2017 Revision ’B’ - - - Pages 1 thru 110 dated 08 Jun 2018

D S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 1 of 110

SERVICE BULLETIN ATA SYSTEM: 2800 NUMBER: 84- - -28- - -21

BOMBARDIER AEROSPACE CONSIDER THIS

SERVICE BULLETIN TO BE PARTICULARL Y SIGNIFICANT AND

URGE OPERATORS TO PROMPTL Y EVALUATE THE CONTENTS SUBJECT : Fuel - - - Fuel System - - - Wing - - - Introduction of High Resistance Isolators, Flexible Anodized and Threaded Rigid Couplings and Bracket Supports for Fuel Pipes to Address Wear and Corrosion - - - ModSum 4- - - 113970

1. PLANNING INFORMA TION A. Effectivity Aircraft Affected:

In- - -Service: DHC- - -8 Aircraft Models 401 and 402 Serial Numbers 4001, 4003 thru 4575.

Verification: ModSum 4- - -113970 has been incorporated on DHC- - -8 Aircraft Model 402 Serial Number 4490 per Post Verification Service B u l l e t i n 8 4 --- 2 8 --- 2 1 V.

Production: ModSum 4- - -113969 will be installed before delivery on applicable DHC- - -8 Aircraft at Serial Number 4576 and subsequent.

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 2 of 110 NOTE: The instructions in this service bulletin are only applicable to the systems and parts installed at the time of delivery on the aircraft or as changed by Bombardier Aerospace Service Bulletin(s). Before you do this bulletin, examine all STC or equivalent action changes to make sure this bulletin can be completed.

Spares Affected:

None INTRODUCTION FOR SERVICE BULLETIN 8 4 --- 2 8 --- 2 1 Service Bulletin 84- - - 28- - - 20 was released to the Q400 fleet as an Interim Corrective Action mandated by TCCA AD CF - - - 2017- - - 04R1 to address the fuel tank concerns listed below:

- - - Corrosion of the B0305080 fuel clamshell couplings (interim action: to replace with new B0305080 coupling assembly based on inspection criteria)

- - - Wear of the fuel tube end ferrules and fuel component end ferrules (interim action to blend end ferrules or replace fuel tubes a nd fuel components based on wear limits determined by lightning tests).

Service Bulletin 84- - - 28- - - 21 is released to the Q400 fleet as the Final Corrective Action to TCCA AD CF - - - 2017- - - 04R1:

- - - The majority of B0305080 clamshell coupling are replaced with B0305144 clamshell coupling to alleviate corrosion of the boron nickel plating

- - - A number of B0305080 couplings are replaced on attrition

- - - Addition of structural support brackets at selected locations to mitigate wear of the fuel tube and fuel component end ferrules

- - - Introduction of high resistance isolators and removal of bonding jumpers on selected fuel subsystems. The isolators and jumper removal are a product improvement designed to mitigate lightning current flow which in turn allows a relaxation of the end ferrule wear limits as well as a relaxation of the electrical bonding requirements across the couplings.

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 3 of 110 B. Reason Problem: Several operators have report ed the following observations associated with the Hydraflow (P/N 14J26) clamshell coupling installation:

Greenish black corrosion deposits on the external plating of the coupling (P/N 14J26).

Wear of the bonding spring and fuel pipe/ fuel component end ferrule.

Wear of the coupling sleeves.

Contact of the coupling body with the fuel pipe/fuel component end ferrule.

The corrosion can adversely impact the electrical conductivity of the coupling assembly. The wear issues ca n result in inadvertent, intermittent contact between coupling components not designed to carry the lightning current. The corrosion and wear issues can result in potential ignition sources inside the fuel tank in the event of the lightning strike.

Excessive movement of the fuel tubes can result in unintentional and intermittent contact between coupling body and end ferrule as well as scoring of the sleeve.

Cause: The highest degree of corrosion was found primarily on couplings located in the upper portion of the fuel tank such as the fuel vent and outboard fuel scavenge lines due to the fact that they are more exposed to fuel vapor and air.

The wear/fretting of the bonding spring and end ferrule is due to the relative motion between coupling and ferrule caused by the fuel tubes not being properly restrained for specific locations within the fuel tank.

Solution: This service bulletin introduces ModSum 4- - -113970 which gives actions as follows:

Addition of high resistance isolators in the engine fuel feed and fuel vent system at selected locations to limit lightning currents to less than 125 milliamperes.

Replacement of B0305080A (Hydraflow P/N 14J26) couplings with B0305144A (Hydraflow P/N 14J18) couplings at selected locations for in- - -service aircraft.

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 4 of 110 Addition of the rigid coupling - - - Hydraflow P/N 15J18 (BA P/N B0305119 and B0305118) at main vent line selected locations to support Isolator 8SC5055 installation.

Addition of tube support structure (brackets, intercostal, and clamps) to address wear of coupling assembly as well as tube/component ferrule wear.

Removal of bonding jumpers at selected locations to provide isolation and limit lightning currents to less than 125 milliamperes.

C. Description The procedures in this service bulletin give the instructions to do the tasks that follow:

- - - aircraft electrical power is removed

- - - the nose landing gear lock is engaged

- - - the main landing gear lock pins are installed thru each main gear and main gear door mechanism

- - - fuel tank is prepared for access

- - - access panels are opened

- - - sequence given in the retrofit summary (RS) is followed per drawing 8Z10149 sheet 1 and retrofit installation is initiated Part A - - - Inspection of Fuel T ube End Ferrules and Fuel Component End Ferrules (Drawing 8Z10174 Sheet 1 to 6)

- - - selected B0305080 couplings are inspected for wear and electrical bonding

- - - all fuel tube ferrules and component ferrules are inspected for wear and repaired per drawing 8Z10174 Part B - - - Part B1 - - - Structural Retrofit (Drawing 8Z10150 Sheet 1 to 3) Part B2 - - - Systems Retrofit of Fuel Couplings, Isolators (Drawing 8Z10149 Sheet 1 to 7) The following is the retrofit summary (RS) for Part B:

Note: T o avoid pre- - -loading fuel lines at installation, it is recommended to follow the following steps given in RS 3 (refer to 8Z10149 sheet 1).

- - - fuel lines and isolators are installed per 8Z10149

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 5 of 110

- - - saddle clamps and/or p- - -clamps are installed onto fuel lines

- - - brackets or intercostals are attached to saddle clamps and/or p- - -clamps

- - - the brackets are fitted onto the ribs and/or stringers

- - - pilot holes are transferred from brackets to structures (ribs & stringers)

- - - fuel lines are removed

- - - brackets are drilled and installed as required per 8Z10150

- - - fuel lines and isolators are re- - -installed as per 8Z10149 --- For inboard vent line - - - 82822016

- - - two isolators (8SC5055- - -001) are installed

- - - existing couplings p/n B0305080 are removed and discarded

- - - existing sleeves are replaced

- - - six anodized couplings p/n B0305144A are installed

- - - four tubes (with B0305118 body) are installed using four nut/retainers p/n B0305119

- - - sheet metal brackets and P- - -clamps are installed per drawing instructions (RIB Y42)

- - - bonding jumpers are removed as specified --- For outboard vent line - - - 82822250

- - - existing couplings p/n B0305080 are removed and discarded

- - - existing sleeves are replaced

- - - four anodized coupling p/n B0305144A are installed

- - - bonding jumpers are removed, as specified --- For outboard scavenge line - - - 82822250

- - - existing couplings p/n B0305080 are removed and discarded

- - - existing sleeves are replaced

- - - ten anodized couplings p/n B0305144A are installed

- - - bonding jumpers are removed, as specified --- For inboard scavenge line - - - 82822012

- - - existing sleeves are replaced with new sleeves p/n 14R02- - -12A (FN 62)

- - - existing coupling clamshells B0305080AXXC are inspected for wear and electrical bonding. B0305080AXXC coupling clamshells that are damaged or fail bonding check are replaced with B0305144AXXC clamshells.

B0305080AXXC coupling clamshells that pass the wear inspection and electrical bonding check are re- - -installed

- - - bonding jumpers are removed, as specified

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 6 of 110 --- For engine feed line - - - 82822002

- - - four isolators (8SC5055- - -001) are installed

- - - existing coupling clamshells B0305080AXXC are inspected for wear and electrical bonding. B0305080AXXC coupling clamshells that are damaged or fail bonding check are replaced with B0305144AXXC clamshells.

B0305080AXXC coupling clamshells that pass the wear inspection and electrical bonding check are re- - -installed

- - - four tubes are installed

- - - sheet metal brackets and saddle clamps are installed as required

- - - existing sleeves are replaced with new sleeves p/n 14R02- - -16A (FN 63)

- - - bonding jumpers are removed, as specified --- For fuel / defuel line - - - 82822008

- - - existing coupling p/n B0305080 are removed and discarded

- - - existing sleeves are replaced

- - - twenty- - -eight anodized couplings p/n B0305144A are installed

- - - sheet metal brackets and saddle clamps are installed as required

- - - pressure testing of each fuel system is done as specified

- - - electrical bonding test procedure is performed as specified

- - - close out.

D. Compliance Bombardier Inc. highly recommend incorporation of ModSum 4- - -113970 at the earliest opportunity unless otherwise directed by the operator’s airworthiness authority.

Transport Canada Airworthiness Directive Pending.

E. Approval The technical content of this service bulletin has been approved under the authority of the Transport Canada Civil Aviation (TCCA) Design Approval Organization No: DAO # 9 3 --- Q --- 0 2 .

This Service Bulletin affects Airworthiness Limitations (AWLs) and/or Damage T olerance Inspections (DTIs). Reference applicable Post/Pre ModSum 4- - -113970 and Service Bulletin 84- - -28- - -21 in the Maintenance Requirements Manual.

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 7 of 110 F. M a n p o w e r It will take an estimated 525.00 man- - -hour s to complete this service bulletin. The breakdown of the man- - -hours is shown in the table that follows:

TASK M A N --- H O U R S J o b S e t --- U p 40.0 Inspection (Part A) Procedure in Part A (Inspection)

125.0 Rectification (Part B1 and B2) Procedure in Part B1 (Structural Re- - -work)

100.0 Procedure in Part B2 ( S y s t e m R e --- w o r k )

200.0 T e s t/R T S 20.0 Close- - -Out 40.0 NOTE: For verification A/C (S/N 4490), additional 75 man- - -hours for inspection and 100 man- - -hours system and structural rework were required.

This estimate is for direct labour done by an experienced crew and it does not include, planning, familiarization, cure tim e, part fabrication, tool acquisition or lost time.

G. Material - - - Price and Availability The ModKit(s) required to do this service bulletin is/are listed in the table below:

Kit Number Description 8MK4812- - -001 Retrofit Kit- - -Couplings and Isolators Fuel System, Wing (A/C S/N 4490 Only) 8MK4812- - -003 Retrofit Kit- - -Couplings and Isolators Fuel System, Wing (A/C S/N 4001, 4003 thru 4489, 4491 thru 4575)

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 8 of 110 Kit Number Description 8MK4812- - -501 Retrofit Kit NOTE: This kit contains additional parts that required to be used with 8MK4812 - - -003 kit for A/C configuration prior to ModSum 4Q113523 (Ref A/C 4001, 4003 thru 4159) Operators should submit a purchase orde r through the Customer Response Center (CRC) to the Customer Accounts Service T eam (CAST) at Bombardier Aerospace Commercial Aircraft division specifying aircraft serial number(s) to:

Bombardier Aerospace Customer Accounts Services T eam (Mail Stop N11- - -32) 123 Garratt Blvd.

To r o n t o Ontario Canada M3K- - -1Y5 E- - -mail addresses:

International: cast.international@aero.bombardier.com European: ps_emea@aero.bombardier.com Americas East: cast.americaseast@aero.bombardier.com Americas West: cast.americaswest@aero.bombardier.com T elephone:

North America:T oll Free +1- - -844- - -CRC- - -CRC0 (+1- - -844- - -272- - -2720) or direct +1- - -514- - -855- - -8500 Facsimile:

International: (416) 373- - -5966 Americas East: (416) 373- - -5964 Americas West: (416) 375- - -5965

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 9 of 110 H. T ooling - - - Price and Availability Description Remarks Bright Light Source Approved for use in fuel tank Inspection Mirror Commercially available Soft Jaw Pliers Commercially available I. Weight and Balance A/C T ype and Model Weight (Lb) Arm (Inches) Moment (Inches x Lb) x 0.001 D H C --- 8 --- Q 4 0 0 MODEL 402 KIT - - - 8MK4812- - -001 (A/C 4490 Only) +7.89 402.96 3.18 D H C --- 8 --- Q 4 0 0 MODELS 401 & 402 KIT - - - 8MK4812- - -003 (A/C 4001, 4003 thru 4118) +7.89 402.96 3.18 D H C --- 8 --- Q 4 0 0 MODELS 401 & 402 KIT - - - 8MK4812- - -003 POST 4Y122242 (A/C 4119 thru 4159) +7.78 403.11 3.14 D H C --- 8 --- Q 4 0 0 MODELS 401 & 402 KIT - - - 8MK4812- - -003 (AC 4160 thru 4575) +7.89 402.96 3.18 D H C --- 8 --- Q 4 0 0 MODELS 401 & 402 KIT·8MK4812- - -501 PRE 4Q113523 (A/C 4001, 4003 thru 4159) +0.10 389.54 0.04 J. Electrical Load Data Not affected

S E R V I C E B U L L E T I N 8 4 --- 2 8 --- 2 1 S . B . 8 4 --- 2 8 --- 2 131 Aug 2017 Revision ‘C’ 13 Jul 2018 PMPage 10 of 110 K. Publications Affected Aircraft Maintenance Manual PSM 1- - -84- - -2.........................

Aircraft Illustrated Parts Catalog PSM 1- - -84- - -4......................

ModSums Manual PSM 1- - -84- - -12..................................

Weight and Balance Manual (Imperial) PSM 1- - -84- - -8................

Weight and Balance Manual (Metric) PSM 1- - -84- - -8M..................

L. References Revision ‘C’ of this service bulletin was prepared to the engineering drawings and related data that follows:

DRAWING SHEET REV 8MK4812 1 N 8Z10149 1 T 8Z10149 1.1 R 8Z10149 2 D 8Z10149 3 G 8Z10149 4 F 8Z10149 5 D 8Z10149 6 C 8Z10149 7 A 8Z10150 1 J 8Z10150 2 E 8Z10150 3 C 8Z10174 1 G 8Z10174 1.1 E 8Z10174 2 C 8Z10174 3 C 8Z10174 4 B 8Z10174 5 B 8Z10174 6 D